GovGazette
Menu

Historical award

California Institute of Technology

This record is historical buying context, not open work.

How current is this award history?

Fiscal year 2025: data through (16 days old).

Fiscal year 2026: data through (16 days old).

Official release availability details

Fiscal year 2025: This is the latest release listed by USAspending. A latest release can still omit recent activity.

Availability checked: .

Fiscal year 2026: This is the latest release listed by USAspending. A latest release can still omit recent activity.

Availability checked: .

Current award value
$149,322,029.5
Potential award value
$149,322,029.5
Total obligated to date
$140,042,437.5

Recorded work

COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESI…
Read the retained work description
COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.

Award activity

Obligations in covered fiscal years
$6,381,622.00
Transactions in covered fiscal years