Opportunities
Power Distribution and Illumination Systems, Electrical (PDISE)
Active notice
- Response deadline
- Oct 22, 2026
- Posted
- Oct 7, 2026
- Notice type
- Sources Sought
Description
SOURCES SOUGHT / REQUEST FOR INFORMATION (RFI) Power Distribution and Illumination Systems, Electrical (PDISE) The PM E2S2 has a potential requirement for the build-to-print manufacture, assembly, first article inspection, preproduction First Article testing, and delivery of the PDISE family of systems and associated components and packaging. PDISE is a standardized, ruggedized, man-portable family of electrical feeder and distribution equipment that connect mobile power generation equipment and warfighter mission equipment in harsh tactical environments
Read the full notice
Sign in to continue on the web, or use the free public research tools in your AI assistant.
Sign in to continueSource date: Oct 19, 2026
Record identifier
11e86a5fac2b44e6bab226e8190991b0