Opportunities
West Fork Lake Upstream Stairs and Control Tower Epoxy Removal
Active notice
- Response deadline
- Aug 28, 2026
- Posted
- Aug 19, 2026
- Notice type
- Solicitation
Description
This solicitation is for the contractor to furnish all labor, materials, supplies, tools, and equipment necessary to complete the removal of existing epoxy paint from the designated Upstream Stairs and Control Tower Platform. Upstream Stairs are approximately 165 ft in length and 7 ft wide including the knee wall. The Control Tower Platform is approximately 27,432 square feet. Any pressurized propellant used during the removal process shall be limited to water or sand. Upon removal of the epoxy paint from the concrete, the Contractor shall be responsible
Read the full notice
Sign in to continue on the web, or use the free public research tools in your AI assistant.
Sign in to continueSource date: Oct 23, 2026
Record identifier
1a61fc71bc2b4676b347e399ed30dd15