Opportunities
Lower Monumental Head Cover Oil/Water Separators
Active notice
- Response deadline
- Feb 21, 2019
- Posted
- Jan 4, 2019
- Notice type
- Presolicitation
Description
Solicitaton will be posted Soon Firm Fixed-Price Construction Contract: Lower Monumental Headcover Oil/Water Separator The USACE Walla Walla District has a requirement at Lower Monumental for supplying materials and installing an Oil/Water separator system to prevent oil from entering the navigable waterways of the Snake River from the power house. The overall purpose of the project is to prevent oil from entering the navigable waterways of the Snake River from the power house at Lower Monumental Lock and Dam. This project will route the fluid to an oil/
Read the full notice
Sign in to continue on the web, or use the free public research tools in your AI assistant.
Sign in to continueSource date: Oct 27, 2026
Record identifier
334f147d6aa85a25e0870c91f306690a