GovGazette
Menu

Opportunities

Little Goose Oil Water Headcover Separator

Active notice
Response deadline
Feb 12, 2019
Posted
Jan 22, 2019
Notice type
Presolicitation

Description

SOLICITATION POSTED The USACE Walla Walla District has a requirement at Little Goose for supplying materials and installing an Oil/Water separator system to prevent oil from entering the navigable waterways of the Snake River from the power house. The overall purpose of the project is to prevent oil from entering the navigable waterways of the Snake River from the power house at Little Goose Lock and Dam. This project will route the fluid to an oil/water separator prior to entering the drainage sump. The work will consist of installing piping, oil/water
View official source

Source date: Nov 17, 2026

Record identifier998603512c3240433efefbce943cca52