Brunswick Harbor Modifications Project Brunswick Harbor, Ga

Active notice
Response deadline
Jun 15, 2026
Posted
May 15, 2026
Notice type
Solicitation

Description

The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of