Opportunities
Barren River Lake Repair Drainage Ditch at Tailwater Stilling Basin
Active notice
- Response deadline
- Sep 18, 2026
- Posted
- Sep 10, 2026
- Notice type
- Solicitation
Description
*** Amendment 0001 posted, revised SOW, PBS and the quote due date has been extended to 18 September 2026*** Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinThe contractor??????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
Read the full notice
Sign in to continue on the web, or use the free public research tools in your AI assistant.
Sign in to continueSource date: Nov 16, 2026
Record identifier
ee15a77c5fb1430bbdc4e3c95151f80c