Federal contractor · public award history
GREATER SOUTHWEST CONSTRUCTORS INC
Parent: GREATER SOUTHWEST CONSTRUCTORS INC CDELLWNF9PM8
- Awards we know about
- 12
- Typical size
- $478,715
- Middle of their public awards
- Dollars on those awards
- $15.30M
Most of their awards we can see fall roughly between $144,781 and $2.23M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$957,429
- 2025$14.34M
Awarding agencies
- Department of Transportation (12)
Industries & product codes
Award history
- Department of Transportation$2.65M
CONSTRUCT SELF-SUPPORTING ANTENNA TOWERS AT THE CHS-RCAG & CHSB-RTR TOWER REPLACEMENT CHARLESTON, SC SITE, IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS.
- Department of Transportation$2.17M
REPLACEMENT OF MALSR STEEL TOWER ALONG WITH ITS ANCILLARY STRUCTURES AT FRANCISCO C. ADA/SAIPAN INTERNATIONAL AIRPORT, SAIPAN, CNMI IN ACCORDANCE WITH THE SPECIFICATIONS, THE SOW AND DRAWINGS.
- Department of Transportation$2.39M
CONSTRUCT THE LIGHT LANE INFRASTRUCTURE FOR THE ESTABLISHMENT OF A DUAL MODE HIGH INTENSITY APPROACH LIGHT SYSTEM WITH SEQUENCED FLASHING LIGHTS (ALSF-2/SSALR), TYPE FA 10700, AT THE ORLANDO INTERNATIONAL AIRPORT
- Department of Transportation$5.73M
CSA TOWERS REPLACEMENT; DEMOLITION OF OLD TOWERS AND REPLACED WITH NEW TOWERS
- Department of Transportation$728,697
CONSTRUCT SELF-SUPPORTING ANTENNA TOWERS AT THE DELLE (QXQ), UTAH RCAG SITE, IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS.
- Department of Transportation$70,195
LRD RCAG; REPAIR AND UPDATE ELECTRICAL PANELS AND EARTH EQUIPMENT GROUNDING IN LAREDO, TX.
- Department of Transportation$120,800
WEST BEND, WI - REPLACEMENT OF TILT OVER POLE AT BJB VOR SITE IN WEST BEND, WI IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
- Department of Transportation$143,692
SHELTER REPLACEMENT AT THE HOUSTON, TX (LKM) LOCALIZER IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
- Department of Transportation$145,144
LAMPASAS, TX - REPLACEMENT ELECTRICAL PANEL AND HVAC (AGJ) VOR IN LAMPASAS, TX IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS.
- Department of Transportation$181,433
FINLEY, ND - REPLACEMENT ELECTRICAL POWER DISTR EQUIP (QFI) ARSR IN FINLEY, ND IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS.
- Department of Transportation$490,059
BOSTON, MA - REPLACEMENT OF THE EXISTING BOS LOC SHELTER WITH A NEW, PRE-CAST SHELTER IN BOSTON, MAS IN ACCORDANCE WITH THE APPLICABLE DRAWINGS, SPECIFICATIONS AND CONDITIONS OF THE CONTRACT.
- Department of Transportation$467,370
RENO, NV - INSTALLATION OF TWO (2) NEW OPERATIONAL RNO RTR TOWERS IN RENO, NV IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS.