Federal contractor · public award history
E CORP
Parent: E CORP CWVJEB454CR7
- Awards we know about
- 21
- Typical size
- $2.41M
- Middle of their public awards
- Dollars on those awards
- $62.91M
Most of their awards we can see fall roughly between $1.78M and $4.49M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$7.60M
- 2025$55.32M
Awarding agencies
- Department of Transportation (20)
- Department of the Interior (1)
Industries & product codes
Award history
- Department of Transportation—
NATIONWIDE BOA - E-CORP
- Department of Transportation$5.07M
BUILDING ENVELOPE AND WATER LEAK REPAIRS SAN ANTONIO (SAT) AIRPORT
- Department of Transportation$1.78M
LCH ATCT ELECTRICAL UPGRADE
- Department of Transportation$2.41M
A CONTRACTOR WILL PROVIDE ALL SERVICES, SUPPLIES, EQUIPMENT, MATERIALS, LABOR, PERMITS, BONDS, AND TRANSPORTATION TO PERFORM THE WORK DETAILED IN THE SCOPE OF WORK AND APPLICABLE DOCUMENTS FOR THE CONSTRUCTION THE DENVER TECHNICAL OPERATIONS CENTER (
- Department of Transportation$10.33M
DESIGN BUILD PROJECT TO MODERNIZE THE SLC ATCT, TRACON BUILDING AND BASE BUILDING.
- Department of Transportation$1.84M
REMOVE AND REPLACE ALL EXTERIOR CAULKING OF BASE BUILDING & TOWER OF ATCT. REPAIR AND INSTALL METAL FRAMING AND DRYWALL FROM THE FIRST LEVEL TO TENTH LEVEL OF ATCT.
- Department of Transportation$7.75M
SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC
- Department of Transportation$10.52M
AIRPORT TRAFFIC CONTROL TOWER AND CAB MODERNIZATION MINNEAPOLIS-SAINT PAUL INTERNATIONAL AIRPORT (MSP), MINNEAPOLIS, MN BIPARTISAN INFRASTRUCTURE LAW FUNDING
- Department of Transportation$1.17M
1) REPLACE EXISTING AHU #1 LOCATED/SERVICING THE BASE BUILDING. 2) REPLACE EXISTING AHU # 1 SERVO MOTOR CONTROLLER. 3) INTEGRATE NEW AHU#1 INTO BUILDING AUTOMATION SYSTEM (BAS) AND ASSURE IT IS SMOOTHLY OPERATING, CONTROL, AND MODULATE EXISTING 21 VA
- Department of the Interior$3.73M
ELMA-CREATE UNIVESALLY ACCESSIBLE TRAIL & CAVE EXPERIENCE - THE WORK INCLUDES BUT IS NOT LIMITED TO: CONSTRUCTING .75 MILE IMPROVEMENTS ON EXISTING EL CALDERON TRAIL AND CONSTRUCTION OF A NEW TRAIL TO THE EXISTING VAULT RESTROOM FROM THE PARKING
- Department of Transportation$1.34M
SALT LAKE CITY ATCT HVAC CONTROLS REPLACEMENT
- Department of Transportation—
MEDIUM CSA BOA - E-CORP
- Department of Transportation—
MEDIUM ESA BOA - E-CORP
- Department of Transportation—
MEDIUM WSA BOA - E-CORP
- Department of Transportation$2.79M
RVS: REPLACE ATCT ELECTRICAL SYSTEM, REPLACE DOMESTIC AND SEWER PIPE, AND RESEAL ATCT TO PREVENT WATER INFILTRATION. LINE 1: 803971: REPLACE ELECTRICAL SYSTEM. LINE 2: 909316: REPLACE DOMESTIC & SEWER PIPE PLUMBING THROUGHOUT BUILDING. LI
- Department of Transportation$755,270
CONTRACTOR TO DESIGN-BUILD A STAGING AREA AS OUTLINED IN THE SCOPE OF WORK AND BY FAA APPROVED DESIGN AT THE KANSAS CITY (ZKC) AIR ROUTE TRAFFIC CONTROL CENTER IN OLATHE, KANSAS.
- Department of Transportation$4.01M
ZLA M-1 RECONGIFURATION
- Department of Transportation$1.83M
CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, TOOLS, TRANSPORTATION, EQUIPMENT AND SUPERVISION TO COMPLETE THE FENS ELECTRICAL SITE PREPARATION TO INCLUDE BUT NOT LIMITED TO, INSTALL A NEW CABLE TRAY SYSTEM AND CONDUITS FOR FENS COMMUNICATION, INSTALL
- Department of Transportation$2.39M
PROVIDE ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION DOCUMENTATION, AND SUPPORT DURING PROCUREMENT AS WELL AS ABATEMENT AND CONSTRUCTION SERVICES NECESSARY TO COMPLETELY RENOVATE ENTIRE MENS AND WOMENS MAIN FACILITY RESTROOMS AT ZLA. TO INCLUDE: LE
- Department of Transportation$4.49M
AHU & CRAC UNIT REPLACEMENT PROJECT AT FAA'S OAKLAND AIR ROUTE TRAFFIC CONTROL FACILITY IN FREMONT, CA
- Department of Transportation$720,495
ZOA FY21 REFURBISH AIR HANDLING UNITS AND REPLACE HUMIDIFIERS FOR THE DSR AREA PROVIDE EQUIPMENT, MATERIALS AND LABOR TO IMPLEMENT THE PROJECT AS INDICATED IN HERE AND OTHER CONTRACT DOCUMENT INCLUDING BUT NOT LIMITED TO THE FOLLOWING: 1. CLEAN OR
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.