Federal contractor · public award history
KOVILIC CONSTRUCTION CO INC
Parent: KOVILIC CONSTRUCTION CO INC EVBUYJTMKL45
- Awards we know about
- 10
- Typical size
- $1.33M
- Middle of their public awards
- Dollars on those awards
- $36.33M
Most of their awards we can see fall roughly between $531,500 and $4.89M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$467,656
- 2025$35.86M
Awarding agencies
- Department of Transportation (8)
- Department of the Interior (2)
Industries & product codes
Award history
- Department of Transportation$3.78M
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP
- Department of Transportation$1.33M
PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WORK INCLUDE
- Department of Transportation$13.65M
PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND SUPERSTRUC
- Department of the Interior$531,500
CO ~ ROCKY MOUNTAIN ARSENAL NATIONAL WILDLIFE REFUGE (NWR) ~ LOW WATER CULVERT YOUR COMPANY WAS SELECTED TO PROVIDE CONSTRUCTION SERVICES AT THE ROCKY MOUNTAIN ARSENAL (RMA) NATIONAL WILDLIFE REFUGE (NWR), 6550 GATEWAY ROAD, COMMERCE CITY, CO 8002
- Department of Transportation—
PROJECT: MID-ATLANTIC REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation$549,775
PROJECT DC ERFO NPS CHOH 2019-1(1) THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVEMENT RESURFACING; GRAVEL OVERLAY; BRIDGE SCOUR REPAIR; CULVERT REPLACEMENT AND REMOVAL; RIPRAP; MINOR REINFORCED CONCRETE PAVEMENT PATCHING; TEMPORARY DIVERSION BERM; FI
- Department of the Interior$11.13M
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL
- Department of Transportation$4.89M
ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS
- Department of Transportation$234,605
PROJECT VA ST TFHRC 50(6): THE PROJECT CONSISTS OF THE CONSTRUCTION OF APPROXIMATELY 830 FEET NEW CONCRETE SIDEWALK (4-FOOT WIDE) WITH CONCRETE CURB (16-INCH DEPTH), HIGH-QUALITY DETECTABLE WARNING TILES OR PANELS THAT COMPLY WITH THE STANDARDS OF T
- Department of Transportation$233,051
PROJECT VA ERFO COE 2018-1(1) THE PROJECT CONSISTS OF PARKING LOT REPAIRS. THE WORK INCLUDES RIPRAP INSTALLATION, EMBANKMENT CONSTRUCTION, AGGREGATE BASE, SEPARATION-STABILIZATION GEOTEXTILE, ASPHALT CONCRETE PAVEMENT, WHEELSTOP RESETTING, PAVEMENT
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.