Federal contractor · public award history

LOCKHEED MARTIN CORP

UEIFYHNA5WC8XD7CAGE04236LITTLETON, COLORADO

Parent: LOCKHEED MARTIN CORP ZFN2JJXBLZT3

Awards we know about
18
Typical size
$186.51M
Middle of their public awards
Dollars on those awards
$22.09B

Most of their awards we can see fall roughly between $4.62M and $441.38M.

From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.

Public award activity by year

Sum of award values in our USAspending index (not a full financial history).

  • 2024
    $6.51M
  • 2025
    $24.32B

Awarding agencies

  • National Aeronautics and Space Administration (18)

Industries & product codes

Award history

  • National Aeronautics and Space Administration$274.36M
    Sep 30, 2025PIID 80MSFC22CA005NAICS 336414PSC AR14AWARDUSAspending ↗

    RESEARCH AND DEVELOPMENT SERVICES RELATED TO THE PRODUCTION OF THE MARS ASCENT VEHICLE INTEGRATED SYSTEMCHAN

  • National Aeronautics and Space Administration$456.35M
    Sep 30, 2025PIID NNG12FD66CNAICS 336414PSC 1820AWARDUSAspending ↗

    ORIGINS SPECTRAL INTERPRETATION RESOURCE IDENTIFICATION SECURITY-REGOLITH EXPLORER (OSIRIS-REX) PHASE B EFFORT. UNDER THIS CONTRACT, THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO COMPLETE MISSION DESIGN AND REQUIREMENTS FLOW DOWN ACTIVITIES CULMINATING IN AN OSIRIS-REX PROJECT MISSION DESIGN REVIEW (MDR). THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE OSIRIS-REX PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM.

  • National Aeronautics and Space Administration$27.18M
    Sep 29, 2025PIID 80GSFC20C0059NAICS 336414PSC AZ11AWARDUSAspending ↗

    THIS PROCUREMENT PROVIDES FOR THE LABOR, TRAVEL AND ASSOCIATED BURDENS NECESSARY TO SATISFY THE PHASE A CONCEPT STUDY REPORT (CSR) AND BRIDGE PHASE B OPTION REQUIREMENTS OF NASA'S COMPETITIVELY SELECTED DAVINCI+ MISSION.

  • National Aeronautics and Space Administration$2.96B
    Sep 25, 2025PIID 80JSC019C0012NAICS 541715PSC 1555IDVUSAspending ↗

    ORION PRODUCTION AND OPERATIONS CONTRACT

  • National Aeronautics and Space Administration$15.54B
    Sep 24, 2025PIID NNJ06TA25CNAICS 541710PSC AR33AWARDUSAspending ↗

    TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION

  • National Aeronautics and Space Administration$305.90M
    Sep 19, 2025PIID NNG09EK34CNAICS 336414PSC 1820AWARDUSAspending ↗

    RISK REDUCTION AND PHASE B EFFORT IN SUPPORT OF THE MARS ATMOSPHERIC AND VOLATILE EVOLUATION (MAVEN) PROJECT. THE CONTRACTOR SHALL PROVIDE THE RESOURCES NECESSARY TO SUPPORT THE MAVEN PROJECT TO DEFINE AND COMPLETE THE DEFINITION OF THE PRELIMINARY DESIGN, AND THE PLANS FOR DEVELOPMENT, MANUFACTURE, TEST, VERIFICATION AND OPERATION OF A FLIGHT SYSTEM, WHICH CONSISTS OF THE INTEGRATED SPACECRAFT AND SCIENCE PAYLOADS IN ACCORDANCE WITH THE STATEMENT OF WORK.

  • National Aeronautics and Space Administration$3.99M
    Sep 18, 2025PIID 80HQTR25CA011NAICS 541715PSC AR12AWARDUSAspending ↗

    THIS IS A FFP CONTRACT FOR NEXTSTEP2 APPENDIX R: LUNAR LOGISTICS AND MOBILITY STUDIES.

  • National Aeronautics and Space Administration$313.08M
    Sep 15, 2025PIID 80GSFC25CA013NAICS 336414PSC AR15AWARDUSAspending ↗

    NASA GSFC GEOSTATIONARY EXTENDED OBSERVATIONS (GEOXO) LIGHTNING MAPPER (LMX) INSTRUMENT IMPLEMENTATION. THE LMX INSTRUMENT IS A SINGLE SPECTRAL CHANNEL INSTRUMENT USED TO MEASURE THE LOCATION AND INTENSITY OF OPTICAL TRANSIENTS PRODUCED BY LIGHTNING.

  • National Aeronautics and Space Administration$598,000
    Sep 9, 2025PIID 80LARC25P0001NAICS 541715PSC AF11AWARDUSAspending ↗

    DEVELOP A CONCEPTUAL DESIGN FOR THE AEROCAPTURE FLIGHT DEMONSTRATION.

  • National Aeronautics and Space Administration$1.76B
    Sep 8, 2025PIID 80GSFC24CA001NAICS 336414PSC AR15AWARDUSAspending ↗

    DESIGN BUILD AND DELIVER 3 GEOXO SPACECRAFT

  • National Aeronautics and Space Administration$98.66M
    Jul 21, 2025PIID 80MSFC21CA001NAICS 541715PSC AR13AWARDUSAspending ↗

    TIPPING POINT CRYOGENIC DEMONSTRATION MISSION (CDM) DELIVER GROUND AND MISSION DATA TO CHARACTERIZE FULL-SCALE CRYOGENIC INTEGRATED SYSTEM PERFORMANCE.

  • National Aeronautics and Space Administration$599,962
    Jul 16, 2025PIID 80JSC025F7061NAICS 481212PSC AR14AWARDUSAspending ↗

    CX-1 CLPS TRADE STUDY MID-SIZED LANDER CAPABILITY ASSESSMENT LOCKHEED MARTIN BASE AWARD

  • National Aeronautics and Space Administration$2.13B
    Jul 14, 2025PIID NNG09HR00CNAICS 336414PSC AR35AWARDUSAspending ↗

    THE GOVERNMENT IS PROCURING THE NEXT-GENERATION GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) SERIES TO CONTINUE ITS MISSION THROUGH NEW REQUIREMENTS SPECIFIED IN THE GOES-R LEVEL I REQUIREMENTS DOCUMENT AND MISSION REQUIREMENTS DOCUMENT (MRD). THE FIRST SATELLITE OF THIS NEW SERIES, DESIGNATED AS GOES-R, WILL PROVIDE THE FIRST MAJOR IMPROVEMENT IN INSTRUMENT TECHNOLOGY SINCE GOES-I LAUNCHED IN 1994. THE GOES-R SERIES WILL INTRODUCE OTHER NEW TECHNOLOGIES IN BOTH THE SPACE AND GROUND SEGMENTS. THESE ADVANCES WILL IMPROVE THE NATION'S ABILITY TO MONITOR AND FORECAST WEATHER AND ENVIRONMENTAL PHENOMENA WITH A SIGNIFICANT INCREASE IN THE NUMBER OF PRODUCTS. ONE OF NOAA'S PRINCIPAL MISSIONS IS TO PROVIDE FORECASTS AND WARNINGS FOR THE UNITED STATES, ITS TERRITORIES, ADJACENT WATERS AND OCEAN AREA FOR THE PROTECTION OF LIFE AND PROPERTY AND ENHANCEMENT OF THE NATIONAL ECONOMY. THIS MISSION REQUIRES THE CAPABILITY TO ACQUIRE, PROCESS, AND DISSEMINATE ENVIRONMENTAL DATA ON AN EXTENSIVE SPATIAL RANGE (GLOBAL, REGIONAL AND LOCAL) ON A VARIETY OF TIME SCALES. THESE DATA INCLUDE, BUT ARE NOT LIMITED TO: GLOBAL IMAGERY; CLOUD AND PRECIPITATION PARAMETERS; ATMOSPHERIC PROFILES OF TEMPERATURE, MOISTURE, WINDS, AEROSOLS, AND OZONE; SURFACE CONDITIONS CONCERNING ICE, SNOW AND VEGETATION; OCEAN PARAMETERS AND SEA-SURFACE TEMPERATURE; AND SOLAR AND IN-SITU SPACE ENVIRONMENT CONDITIONS. THE STATEMENT OF WORK (SOW) DEFINES THOSE TASKS TO DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, EVALUATE, DELIVER GOES-R SERIES SATELLITES AND SUPPORT LAUNCH AND POST LAUNCH, SUPPLY AND MAINTAIN THE GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE NOAA SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES, AND OTHER RESOURCES TO DESIGN, VALIDATE, FABRICATE, ASSEMBLE, INTEGRATE, TEST, VERIFY, AND DELIVER GOES-R SERIES SATELLITES AND PROVIDE PRE-LAUNCH, LAUNCH, AND POST-LAUNCH SUPPORT AND TRAINING UNDER THE BASIC CONTRACT, AND OPTIONS WHEN EXERCISED BY THE GOVERNMENT.

  • National Aeronautics and Space Administration$25,000
    Jun 13, 2025PIID 80HQTR19D0014NAICS 481212PSC AR14IDVUSAspending ↗

    THE PURPOSE OF THIS REQUIREMENT IS TO ACQUIRE END-TO-END COMMERCIAL PAYLOAD SERVICES BETWEEN THE EARTH AND THE LUNAR SURFACE FOR NASA HEADQUARTERS' SCIENCE, HUMAN EXPLORATION AND OPERATIONS, AND SPACE TECHNOLOGY MISSION DIRECTORATES (SMD, HEOMD, AND STMD). THE CONTRACTOR SHALL PROVIDE ALL ACTIVITIES NECESSARY TO SAFELY INTEGRATE, ACCOMMODATE, TRANSPORT, AND OPERATE NASA PAYLOADS USING CONTRACTOR-PROVIDED ASSETS, INCLUDING LAUNCH VEHICLES, LUNAR LANDER SPACECRAFT, LUNAR SURFACE SYSTEMS, EARTH RE-ENTRY VEHICLES, AND ASSOCIATED RESOURCES.

  • National Aeronautics and Space Administration$223,464
    Jun 11, 2025PIID 80NSSC24PA159NAICS 541690PSC AJ11AWARDUSAspending ↗

    R&D CONTRACT FOR EXPLOSIVE HYDROFORMING OF A FRICTION STIR WELDED BLANK

  • National Aeronautics and Space Administration$48.58M
    Apr 29, 2025PIID NNH15CN70CNAICS 541712PSC AR22AWARDUSAspending ↗

    IGF::OT::IGF NEXTSTEP-2: THE GATEWAY PROGRAM OFFICE WAS DIRECTED BY NASA HQ TO COMMENCE WORK ON DEVELOPING AND REFINING GATEWAY HABITATION CONCEPTS, LEADING TO DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E) AND DELIVERY OF A U.S. HABITATION MODULE TO NASA.

  • National Aeronautics and Space Administration$396.49M
    Feb 12, 2025PIID NNG17FD73CNAICS 336414PSC 1550AWARDUSAspending ↗

    THE LUCY SPACECRAFT AND MISSION OPERATIONS CONTRACT EMBODIES THE MISSION'S REQUIREMENT TO DESIGN, DEVELOPMENT, TEST, AND OPERATE THE LUCY SPACECRAFT BUS. LUCY WILL EXPLORE SIX JUPITER TROJAN ASTEROIDS TRAPPED BY JUPITERS GRAVITY IN TWO SWARMS THAT SHARE THE PLANETS ORBIT, ONE LEADING AND ONE TRAILING JUPITER IN ITS 12-YEAR CIRCUIT AROUND THE SUN. THE TROJANS ARE THOUGHT TO BE RELICS OF A MUCH EARLIER ERA IN THE HISTORY OF THE SOLAR SYSTEM, AND MAY HAVE FORMED FAR BEYOND JUPITERS CURRENT ORBIT.

  • National Aeronautics and Space Administration$6.51M
    Dec 5, 2024PIID 80LARC21CA011NAICS 541715PSC AR12AWARDUSAspending ↗

    THE CONTRACTOR IS TO DESIGN, PROTOTYPE, AND TEST THE LUNAR VERTICAL SOLAR ARRAY TECHNOLOGY (LVSAT), A SOLAR PANEL SYSTEM DESIGNED TO PROVIDE 10 KILOWATTS OF ELECTRICAL POWER AND BE ROBOTICALLY DEPLOYABLE AT THE SOUTH POLE OF THE LUNAR SURFACE.

Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.

Related open government contracts

Industry 336414

Open SAM.gov notices in industries where this company has public awards — not exclusive work for this firm.