Federal contractor · public award history
CENTRAL SOUTHERN CONSTRUCTION CORP.
DBA CENTRAL SOUTHERN CONSTRUCTION CORP
Parent: CENTRAL SOUTHERN CONSTRUCTION CORP. GKU1XRD7BCX7
- Awards we know about
- 28
- Typical size
- $2.56M
- Middle of their public awards
- Dollars on those awards
- $103.23M
Most of their awards we can see fall roughly between $1.25M and $7.03M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$6.01M
- 2025$97.22M
Awarding agencies
- Department of Transportation (26)
- Department of the Interior (2)
Industries & product codes
Award history
- Department of Transportation$2.28M
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
- Department of Transportation$8.93M
PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC
- Department of Transportation$6.81M
PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN
- Department of Transportation—
PROJECT: MID-WEST REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation$14.66M
PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC
- Department of Transportation—
PROJECT: NORTH EASTERN REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation—
PROJECT: SOUTH-ATLANTIC REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation$19.43M
THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN
- Department of the Interior$775,675
CONSTRUCTION, REPAIR COLLAPSED STORM DRAIN AT CASTILLO DE SAN MARCOS
- Department of Transportation$7.78M
PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE
- Department of Transportation$1.84M
GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG
- Department of Transportation$2.56M
PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$477,370
PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$2.59M
PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS
- Department of Transportation$7.25M
PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.
- Department of Transportation—
WESTERN REGION PAVEMENT PRESERVATION MULTIPLE AWARD TASK ORDER CONTRACTS (MATOC) COVERING A 5-YEAR PERIOD FOR HIGHWAY/BRIDGE/ROAD PROJECTS FOR PAVEMENT PRESERVATION WORK IN THE WESTERN UNITED STATES
- Department of Transportation$4.57M
MI NP MUILTI PMS(1), PAVEMENT PRESERVATION MICHIGAN. WORK CONSISTS OF PATCHING, CRACK SEALING, AND RESURFACING OF ASPHALT SURFACES THROUGH PICTURED ROCKS NATIONAL LAKESHORE AND SLEEPING BEAR FUNES NATIONAL LAKESHORE.
- Department of Transportation$1.70M
PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$9.12M
MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND
- Department of Transportation$662,370
PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU
- Department of the Interior—
CONSTRUCTION, REPLACE WASTEWATER TREATMENT PLANT AT DRY TORTUGAS NATIONAL PARK
- Department of Transportation$2.28M
PROJECT NP-EVER 219(1), 222(1): THE PROJECT CONSISTS OF THE ASPHALT PAVEMENT MILLING AND OVERLAY, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKING, RAISED PAVEMENT MARKER, CULVERT AND MANHOLE REPLACEMENT, REMOVE AND REST INLET FRAME AND GRATE, REPLACEMEN
- Department of Transportation$3.50M
PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE
- Department of Transportation$910,000
SOEN: EMERGENCY REPAIR STORM-DAMAGED ON FORT PICKERNS ROAD AND J.E. BOWDEN WAY LOCATED IN GULF ISLAND NATIONAL SEASHORE AND ESCAMBIA COUNTY, FLORIDA.
- Department of Transportation$1.58M
PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$471,902
NP-VICK 12(5), 20(2) THE PROJECT CONSISTS OF PAVEMENT REPAIR ON CONFEDERATE AVENUE (ROUTE 12) AND SLIDE REPAIR ON UNION AVENUE (ROUTE 20). THE WORK INCLUDES EARTHWORK, GABION WALL, AGGREGATE BASE, ASPHALT PAVING, CONCRETE PAVING, DRAINAGE, AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$2.56M
PROJECT NP SER PMS FY21(2): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN BIG CYPRESS NATIONAL PRESERVE. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MA
- Department of Transportation$489,380
PROJECT FW-EDFO 104(1), 906(1) THE PROJECT CONSISTS OF THE REHABILITATION AND WIDENING OF SCOTTS LANDING ROAD AND SCOTTS LANDING PARKING AREA WITHIN THE EDWIN B. FORSYTHE NATIONAL WILDLIFE REFUGE. THE WORK INCLUDES GRADING, AGGREGATE BASE, ALUMINUM
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.