Federal contractor · public award history
JLL-RER SOLUTIONS, LLC
Parent: JLL-RER SOLUTIONS, LLC HG45BDPFM2A8
- Awards we know about
- 28
- Typical size
- $13,998
- Middle of their public awards
- Dollars on those awards
- $6.63M
Most of their awards we can see fall roughly between $7,835 and $32,839.
SAM.gov registration
Public extract 2026-07-05
- Status
- Active
- Purpose of registration
- All awards (Z2)
- Registration expires
- Mar 10, 2027
- Activation date
- Mar 18, 2026
- Primary NAICS (SAM)
- 541611
Business types (SAM)
Registration fields from the official SAM.gov public entity extract (monthly bulk). Not a substitute for live SAM checks.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- General Services Administration (28)
Industries & product codes
Award history
- General Services Administration—
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO PERFORM EMERGENCY CALL BACK SERVICE OR ADDITIONAL SERVICE AT MULTIPLE LOCATIONS IN MINNESOTA.
- General Services Administration—
FEDERAL SUPPLY SCHEDULE CONTRACT
- General Services Administration—
REPLACE PLATES FOR CHILLED WATER HEAT EXCHANGER AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
- General Services Administration$3,312
ORDER FOR FIRE PUMP PIPING AND VALVE REPAIR AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
- General Services Administration—
THIS IS A RECURRING CONSOLIDATED FACILITIES MANAGEMENT SERVICES BLANKET PURCHASING AGREEMENT AT 4 LOCATIONS IN MINNESOTA.
- General Services Administration$9,918
THE REPAIR ROOF DRAIN LEAK ON 6TH FLOOR USAO SERVICES WILL BE PERFORMED AT THE DIANA E. MURPHY U. S. COURTHOUSE IN MINNEAPOLIS, MN.
- General Services Administration$13,998
TO PURCHASE ANALOG TIME CLOCKS, REPAIR THE STEAM LEAK AND REKEY THE DOORS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS.
- General Services Administration$799
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO PROVIDE SNOW AND ICE REMOVAL SERVICES INCLUDING SNOW HAULING AT THE DEVITT U.S. COURTHOUSE AND FEDERAL BUILDING IN FERGUS FALLS, MN.
- General Services Administration$31,772
REFRESH MAINTENANCE OFFICE 3RD FLOOR PROJECT, MURPHY COURTHOUSE, MINNEAPOLIS, MN. INSTALL GYPSUM BOARD WALLS WITH HOLLOW METAL DOORS, INFILL EXISTING OPENING, PAINT WALLS, DOORS, FRAMES TO MATCH EXISTING, VINYL WALL BASE ON NEW WALLS.
- General Services Administration$13,528
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO CREATE NEW MASTER KEY SYSTEM FOR GSA CONTROLLED AREAS AT THE W E BURGER FEDERAL BUILDING AND U.S. COURTHOUSE IN ST. PAUL, MN.
- General Services Administration$37,983
TO REPLACE CONTROLLER AND LOCKS, REPAIR SPRINKLER PIPE AND DOOR, INSTALL SAFETY FILMS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
- General Services Administration$6.18M
THIS IS A BPA CALL FOR STANDARD SERVICES FOR THE CONSOLIDATED FACILITIES MANAGEMENT RECURRING SERVICES CONTRACT AT 4 LOCATIONS IN MINNESOTA.
- General Services Administration$13,521
LEAD AND ASBESTOS ABATEMENT ON THE FIRST FLOOR AT THE FEDERAL BUILDING IN FERGUS FALLS, MN.
- General Services Administration$8,215
TO REPLACE VARIABLE FREQUENCY DRIVE ON MAIN CHILLED WATER PUMP AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
- General Services Administration$7,455
REPAIR OF GARBAGE DISPOSAL IN CAFETERIA AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
- General Services Administration$41,430
TO REPLACE 80 GAUGES, COMPLETE THE 5 YEAR OBSTRUCTION TEST, AND REPLACE A CHILLED WATER PUMP MOTOR AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
- General Services Administration$18,247
REPAIR PIPE LEAK FOR HEAT EXCHANGERS 1 AND 2 AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
- General Services Administration$24,156
THE EMERGENCY POWER TRACE & CIRCUIT MAPPING WILL BE PERFORMED AT THE DIANA E. MURPHY U.S. COURTHOUSE AT 300 S. 4TH STREET, SUITE 1012, MINNEAPOLIS, MN 55415.
- General Services Administration$2,581
TO REPAIR THE TUNNEL STEAM COIL LEAK AT AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
- General Services Administration$2,749
INSTALL PIPE SUPPORTS ON THE WASTE LINE IN THE PARKING GARAGE AT THE MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
- General Services Administration$22,869
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO REBUILD REHEAT PUMP AT THE DIANA E. MURPHY U.S. COURHOUSE IN MINNEAPOLIS, MN.
- General Services Administration$46,304
RELOCATE BUILDING AUTOMATION SYSTEM INTERFACE TO 3RD FLOOR, REPLACE CHILLED WATER AIR SEPARATOR AND REPLACE CARPET FOR SIXTH FLOOR OFFICE AT THE DIANA E. MURPHY U.S. COURTHOUSE IN MINNEAPOLIS, MN.
- General Services Administration$6,550
INSTALL ELECTRIC TANKLESS DOMESTIC WATER HEATER, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, SOCIAL SECURITY ADMINISTRATION BUILDING, AUSTIN, MN
- General Services Administration$10,675
TO INSTALL RELIEF FAN CONTROLLERS AT THE W.E. BURGER FEDERAL BUILDING & U.S. COURTHOUSE, ST PAUL, MN.
- General Services Administration$29,433
PARKING RAMP CLEANOUT REPLACEMENT AND LOBBY FLOOR DRAIN PIPING AND VALVE REPAIR AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
- General Services Administration$33,906
HEAT EXCHANGER HEAD REPLACEMENT, CONSOLIDATED FACILITIES MANAGEMENT SERVICES, DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN
- General Services Administration$66,901
TO REPLACE 3 SEWER EJECTOR PUMPS AT THE DIANA E. MURPHY U.S. COURTHOUSE, MINNEAPOLIS, MN.
- General Services Administration—
TO PERFORM FY25 SNOW REMOVAL SERVICES AT THE SOCIAL SECURITY ADMINISTRATION, AUSTIN, MN.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.