Federal contractor · public award history
G E A BUILDERS INC.
Parent: G E A BUILDERS INC. KH6BMLLAQSK8
- Awards we know about
- 31
- Typical size
- $74,712
- Middle of their public awards
- Dollars on those awards
- $7.68M
Most of their awards we can see fall roughly between $47,612 and $194,847.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$222,121
- 2025$7.45M
Awarding agencies
- General Services Administration (26)
- Department of Homeland Security (4)
- Department of Veterans Affairs (1)
Industries & product codes
Award history
- Department of Homeland Security$27,746
THIS CONTRACT IS FOR THE FABRICATION AND INSTALLATION OF A CORRIDOR METAL DOOR WITH A LOCK AT THE U.S. CUSTOMS AND BORDER PROTECTION MARIPOSA PORT OF ENTRY IN NOGALES, AZ.
- Department of Homeland Security$168,534
REMOVE VCT/REPLACE WITH POLISHED CONCRETE, AND REMOVE CARPET/REPLACE WITH CARPET SQUARES AND POLISHED CONCRETE, MARCH ARB, HANGAR 373, CA.
- General Services Administration$3.33M
DB SDO CHILLERS REPLACEMENT AT THE SANDRA DAY O'CONNOR US COURTHOUSE & FEDERAL BUILDING, 401 W WASHINGTON ST., PHOENIX, AZ 85003
- Department of Homeland Security$550,678
INSTALL MODULAR BUILDING AT USCG SECTOR SAN DIEGO
- General Services Administration$202,912
CONTRACTOR TO PROVIDE ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, & SUPERVISION TO PERFORM UPGRADE ACCESS CONTROL, CAMERAS, AND INTRUDER DETECTION FOR ICE OCEANSIDE, LOCATED AT 2420 W. VISTA WAY, SAN DIEGO, CA.
- General Services Administration$60,929
TO FURNISH AND REPLACE FIVE BALLISTIC RESISTANT GLASS WINDOWS AT THE CARTER KEEP US COURTHOUSE (333 W BROADWAY, SAN DIEGO, CA 92101). REFER TO PROJECT SCOPE OF WORK FOR FULL DETAILS AND REQUIREMENTS
- Department of Homeland Security$29,078
REPLACE FLOORING LOCATED AT THE CHULA VISTA, CA BORDER PATROL STATION
- Department of Veterans Affairs$111,136
PCD-901-M&R-FY25-026 RIVERSIDE NATIONAL CEMETERY COLUMBARIUM A REPAIR
- General Services Administration$9,935
THIS PROJECT IS FOR THE ROOF ASSESSMENT OF THE SAN YSIDRO LPOE
- General Services Administration$48,310
DELLUMS JANITOR CLOSET RESTORATION, DELLUMS FEDERAL BUILDING, 1301 CLAY STREET, OAKLAND, CA
- General Services Administration$221,255
CBP IS REQUESTING TO CONVERT A STORAGE ROOM AT 610 ASH STREET, SUITE 1005, ROOM 108, SAN DIEGO, CA 92101 INTO A SECURE MEETING ROOM.
- General Services Administration$591,492
47PK1725C0012 SAN DIEGO COURTHOUSE PERIMETER HARDENING 333 W BROADWAY SAN DIEGO CA 92101
- General Services Administration$604,972
CBP 8TH FLOOR RENOVATION - 610 W. ASH STREET, 8TH FLOOR, SAN DIEGO, CA 92101
- General Services Administration$186,781
CONTRACTOR TO PROVIDE WOOD TOUCHUPS THROUGHOUT CHAMBER SUITES IN ACCORDANCE WITH THE STATEMENT OF WORK AT THE SCHWARTZ COURTHOUSE, 880 FRONT STREET, SAN DIEGO, CA 92101.
- General Services Administration$51,425
THE WOOD WORK IN THE USDC SECURE CORRIDORS OF THE 2ND, 3RD, 4TH, AND 5TH FLOORS NEED TO BE REPAIRED INSIDE THE SCHWARTZ COURTHOUSE LOCATED AT 880 FRONT STREET, SAN DIEGO, CA 92101.
- General Services Administration$234,998
RENOVATE THE 12TH FLOOR SPACE LOCATED AT 610 WEST ASH STREET SAN DIEGO, CA 92101 FOR RETURN TO OFFICE EFFORTS.
- General Services Administration$111,244
RENOVATING THE 12TH FLOOR FOR OCC CBP AT 610 WEST ASH STREET SAN DIEGO, CA 92101.
- General Services Administration$137,220
SCHWARTZ LIBRARY ENTRYWAY RENOVATION INCLUDING WOOD AND ELECTRICAL WORK REQUESTED BY THE COURTS.
- General Services Administration$59,636
USMS SALLYPORT OVERHEAD DOOR CONTROLLER ROYBAL FB, 255 EAST TEMPLE ST., LOS ANGELES, CA.
- General Services Administration$351,618
CONSTRUCTION CONTRACT TO INSTALL NEW CANOPY AT THE SECURITY BOOTH AT SAN LUIS II LPOE, SAN LUIS, AZ
- General Services Administration$21,589
INSTALLATION OF NEW FIBER OPTIC CABLING FOR THE COURTS AT THE SCHWARTZ FOB FACILITY LOCATED AT 880 FRONT STREET, SAN DIEGO, CA 92101.
- General Services Administration$56,004
IRS REMOVAL OF LVT FLOORING LOCATED AT 855 M STREET, FRESNO, CA
- General Services Administration$46,914
INSTALL LED LIGHTING IN NORTH ENTRY SECURITY BOOTH
- General Services Administration$48,310
THE GOAL OF THIS PROJECT IS TO INSTALL NEW MULTIMEDIA EQUIPMENT IN THE PACIFIC CONFERENCE ROOM (SUITE 7-5290) DUE TO NO AV EQUIPMENT CURRENTLY EXISTING IN THE CONFERENCE ROOM AT 450 GOLDEN GATE AVE, SF, CA 94102. SEE SOW FOR FURTHER DETAILS.
- General Services Administration$157,710
50 UNP CONSOLIDATION SERVICES FOR GSA AT 50 UNITED NATIONS PLAZA FEDERAL OFFICE BUILDING IN SAN FRANCISCO, CA
- General Services Administration$37,300
REPLACE A SECTION OF SIDEWALK THAT HAS BECOME A SAFETY HAZARD AFTER BEING DAMAGED BY TREE ROOTS AT THE PECKHAM FEDERAL BUILDING, 280 S. 1ST ST., SAN JOSE, CA 95113-3002
- General Services Administration$76,327
REFRESH USDC STOREFRONT SPACE WITH PAINT AND CARPETING LOCATED AT THE SCHWARTZ COURTHOUSE, 880 FRONT STREET, SAN DIEGO, CA 92101.
- General Services Administration$51,137
TO REPAINT APPROXIMATELY 5,000 USEABLE SQUARE FEET (ALL COMMON AREAS AND ASSOCIATED TRIMS, LOBBY, RECEPTION, 2 INTERVIEW ROOMS, AND OPTIONAL STORAGE ROOM CA0309ZZ, FED BLDG & CTHOUSE, FRESNO, CA 93721-0000
- General Services Administration$4,789
CA6921ZZ IRS - SAN MARCOS CITY HALL - URGENT DOOR REPAIRS
- General Services Administration$74,712
USCIS ASYLUM POST OCCUPANCY PROJECT AT THE RONALD V DELLUMS FEDERAL BUILDING IN OAKLAND, CA -CA0281ZZ-
- General Services Administration$15,156
INSTALL NEW SIGNAGE IN THE RONALD V DELLUMS FEDERAL BUILDING IN OAKLAND, CA -CA0281ZZ-
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.