Federal contractor · public award history
APEX FACILITY SERVICES GROUP LLC
Parent: APEX FACILITY SERVICES GROUP LLC Unique Entity Identifier (UEI)L4LYTTACCQF8
- Awards we know about
- 3
- Typical size
- $1.22M
- Middle of their public awards
- Dollars on those awards
- $4.57M
Most of their awards we can see fall roughly between $1.09M and $1.81M.
SAM.gov registration
- Status
- Active
- Purpose of registration
- All awards (Z2)
- Registration expires
- Apr 28, 2027
- Activation date
- Apr 30, 2026
- Primary NAICS (SAM)
- Facilities Support Services561210
Other NAICS on file
Business types (SAM)
Registration fields from the official SAM.gov public entity extract (monthly bulk). Not a substitute for live SAM checks.
Continue contractor research
Use the verified identifiers and public award record to investigate documented incumbents, compare competitors, or identify possible teaming partners. This is a research starting point, not a capability or partner recommendation.
These official USAspending contract records do not rate capability or past performance and do not tell you whether to team or bid.
Awarding agencies
- Department of Agriculture (2)
- Department of State (1)
Industries & product codes
Award history
- Department of State$953,508Sep 24, 2025Procurement Instrument Identifier (PIID)19GE5025C0121Commercial and Institutional Building Construction236220Repair Or Alteration Of Office BuildingsZ2AAContract awardUSAspending ↗
CONSTRUCTION SERVICES TO IMPLEMENT OFFICE DENSIFICATION PROJECT WITHIN CONSULAR AFFAIRS SECTION OF THE U.S. EMBASSY KATHMANDU.
- Department of Agriculture$2.40MAug 11, 2025Procurement Instrument Identifier (PIID)1232SA25C0022Plumbing, Heating, and Air-Conditioning Contractors238220Installation Of Equipment- Refrigeration, Air Conditioning, And Air Circulating EquipmentN041Contract awardUSAspending ↗
UPGRADE CHILLER PHASE 3, USNPRC BUILDING 1
- Department of Agriculture$1.22MDec 31, 2024Procurement Instrument Identifier (PIID)12405B23C0019Commercial and Institutional Building Construction236220Construction Of Heating And Cooling PlantsY1NBContract awardUSAspending ↗
PHASE 2 OF REPLACE ONE CHILLER RRC, AT USNPRC ATHENS GA. REPLACE ONE 400 TON CHILLER AND CHILLED WATER PUMPS WITH A 800 TON CHILLER, CHILLED WATER PUMPS, AND ASSOCIATED PIPING AND ELECTRICAL WORK AS DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS FOR P
For research only. This is not legal advice, a past-performance review, or a recommendation to team or bid. Check USAspending and SAM.gov.