Federal contractor · public award history
EA ENGINEERING, SCIENCE, AND TECHNOLOGY, INC., PBC
DBA EA SCIENCE AND TECHNOLOGY
Parent: EA ENGINEERING, SCIENCE, AND TECHNOLOGY, INC., PBC PEMXBCN41KT3
- Awards we know about
- 40
- Typical size
- $1.99M
- Middle of their public awards
- Dollars on those awards
- $119.81M
Most of their awards we can see fall roughly between $481,305 and $4.86M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Environmental Protection Agency (32)
- Department of the Interior (5)
- General Services Administration (2)
- Department of Transportation (1)
Industries & product codes
Award history
- Environmental Protection Agency$9.29M
RES - DOVER GAS LIGHT CO.
- Environmental Protection Agency$8.92M
VBI70 - RAF DES
- Environmental Protection Agency$3.44M
DESIGN AND ENGINEERING SERVICES (DES) FOR ODESSA CHROMIUM #1 SUPERFUND SITE.
- Environmental Protection Agency$3.98M
BIL PROJECT - R6 RAF ESO TASK ORDER PACKAGE FOR EAST 67TH STREET RA SUPERFUND SITE TASK ORDER TITLE: REGION 6 ESO REMEDIAL ACTION (RA) OVERSIGHT SUPPORT SERVICES AT THE EAST 67TH STREET GROUND WATER PLUME SUPERFUND SITE LOCATED IN ECTOR COUNTY, TEXA
- Environmental Protection Agency$1.78M
DESIGN AND ENGINEERING SERVICES. AFTERTHOUGHT MINE TECHNICAL SUPPORT, REMEDIAL INVESTIGATION FEASIBILITY STUDY. THE PURPOSE OF THIS TASK ORDER IS FOR THE CONTRACTOR TO PROVIDE TECHNICAL SUPPORT TO US EPA PER THE SOLICITATION.
- Environmental Protection Agency$10.21M
EAST BASIN ROAD GROUNDWATER (A36K) OU01 $1,000,000.00 DES/EA ENGINEERING, CONTRACT: 68HE0318D0005, TASK ORDER: NEW GOVT RIFS: TO AWARD OF A NEW DES TASK ORDER FOR THE EAST BASIN ROAD GROUNDWATER SUPERFUND SITE. THIS WORK WILL INCLUDE A REMEDIAL IN
- Environmental Protection Agency$1.36M
NEW DES TASK ORDER - BLUE LEDGE MINE (SSID 09MM) - TECHNICAL SUPPORT
- Environmental Protection Agency$631,638
HIDDEN LANE LANDFILL SUPERFUND SITE
- Environmental Protection Agency$635,586
LOWER ROUGE RIVER - OLD CHANNEL (LRROC) REMEDIAL ACTION (RA) OVERSIGHT AND SPLIT SAMPLING
- Environmental Protection Agency$3.45M
SELMA PRESSURE TREATING SUPERFUND SITE THROUGH SITE-SPECIFIC TECHNICAL ASSISTANCE TO CONDUCT EPA-LEAD REMEDIAL INVESTIGATION/FEASIBILITY STUDY, ENGINEERING EVALUATION AND COST ANALYSIS, AND/OR REMOVAL ACTION PHASES AS REQUIRED BY THE COMPREHENSIVE EN
- Environmental Protection Agency$3.26M
RAF ESO TASK ORDER LORENTZ BARREL AND DRUM OVERSIGHT AND RA SUPPORT
- Environmental Protection Agency$1.84M
RAF DES TASK ORDER FOR COPPER BLUFF MINE REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS)
- Environmental Protection Agency$14.48M
THIS REQUIREMENT IS FOR CONSTRUCTION SERVICES ON THE KEYSTONE OU 1 REMEDIAL ACTION SITE IN INDIANAPOLIS, IN. WORK AT THE SITE INVOLVES IN-SITU THERMAL TREATMENT (ISTT). TASK ORDER HAS BEEN AWARDED UNDER CLIN 0002 OF THE REMEDIAL ENGINEERING SERVICES
- Environmental Protection Agency$12.52M
CROSSLEY FARM SUPERFUND SITE REMEDIATION ENVIRONMENTAL SERVICES (RES)
- Department of the Interior$52,139
NPS CONTAMINATED SITE CLEANUP BPA - GAAR VAPOR SAMPLING
- Environmental Protection Agency$2.59M
WATSON JOHNSON LANDFILL TASK ORDER UNDER THE DES CLIN 0001 SUITE OF CONTRACTS.
- Department of the Interior$140,938
NPS CONTAMINATED SITE CLEANUP BPA - GOLD HILL DEBRIS REMOVAL - WRST
- Department of the Interior$45,675
CONDUCT GROUNDWATER MONITORING AT THREE LOCATIONS WITHIN BROOKS CAMP IN KATMAI NP, ALASKA.
- Environmental Protection Agency$27.22M
TASK ORDER FOR LAB AND FIELD STUDY SUPPORT RELATED TO PFAS RESEARCH OF INNOVATIVE MEASURES FOR CHARACTERIZING CONTAMINATED SEDIMENT SITES; IDENTIFYING, TRACKING, AND CONTROLLING SOURCES OF CONTAMINATION, AND DEVELOPING TREATMENT APPROACHES
- General Services Administration$111,564
NEPA ENVIRONMENTAL ASSESSMENT AND FONSI GSA PARCEL D EDISON NEW JERSEY, FORMERLY PART OF RARITAN ARSENAL
- Department of Transportation$233,089
GSA CONTRACT 47QRAA19D005G; NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) AND AIR TOUR MANAGEMENT PLAN (ATMP) ANALYSIS SUPPORT
- Environmental Protection Agency$179,961
TASK ORDER OTTAWA TOWNSHIP
- Environmental Protection Agency$2.48M
DES TASK ORDER, PROGRAM PALOS VERDES SHELF OPERABLE UNIT #5 MONTROSE SUPERFUND SITE, COMMUNITY INVOLVEMENT INSTITUTIONAL CONTROLS PROGRAM
- Environmental Protection Agency$3.01M
THIS IS A REMEDIATION ACTION FRAMEWORK (RAF) DESIGN AND ENGINEERING SERVICES (DES) TASK ORDER (TO) TO PROVIDE SERVICES TO THE EPA TO COMPLETE PRE-DESIGN INVESTIGATIONS TO RESOLVE DATA GAPS AND COLLECT ADDITIONAL DATA TO INFORM THE REMEDIAL DESIGN FOR
- Environmental Protection Agency$709,803
RAF-DES TASK ORDER FOR SULPHUR BANK MERCURY MINE (SBMM) RESIDENTIAL REMOVAL DESIGN (RD)
- Environmental Protection Agency$330,971
FY25 FIVE-YEAR REVIEWS AT MULTISITE SUPERFUND SITES SUPPORT. THE PURPOSE OF THIS PROCUREMENT IS CONTRACTOR TO PROVIDE THE EPA ESO FIVE YEAR REVIEW SUPPORT FOR MULTIPLE SITES.
- Environmental Protection Agency$1.99M
RAF DES TASK ORDER FOR ARGONAUT MINE RI/FS
- Environmental Protection Agency$1.71M
REMEDIAL ACQUISITION FRAMEWORK (RAF), DESIGN AND ENGINEERING SERVICES (DES), ISSUANCE OF A NEW TASK ORDER FOR THE BJAT SUPERFUND SITE.
- Environmental Protection Agency$1.65M
RAVENSWOOD PCE EA ENVIRONMENTAL SERVICES AND OPERATIONS (ESO) THE PURPOSE OF THIS TASK ORDER IS TO OPERATE AND MAINTAIN THE IN-SITU AIR SPARGING WITH SOIL VAPOR EXTRACTION (AS/SVE) SYSTEM AS PART OF THE GROUNDWATER REMEDY WITHIN OPERABLE UNIT 1
- Environmental Protection Agency$2.26M
MCCOLL FULLERTON SUPERFUND SITE TECHNICAL OVERSIGHT SUPPORT. THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE ONGOING REMEDIAL ACTIVITIES SUPPORT TO THE EPA AT THE MCCOLL FULLERTON SUPERFUND SITE PER THE SOLICITATION REQUIREMENTS.
- General Services Administration—
FEDERAL SUPPLY SCHEDULE CONTRACT
- Environmental Protection Agency$274,376
NORTH 5TH STREET GROUNDWATER CONTAMINATION SUPERFUND SITE: REGION 5, SUPERFUND & GREAT LAKES ARCHITECTURE & ENGINEERING SERVICES (SFGLAES), SEMD, EA (68HE0523D0006), REMEDIAL INVESTIGATION (RI) TASK ORDER
- Department of the Interior$38,719
THE PURPOSE OF THE LIMITED PHASE II ESA IS TO ASSESS WHETHER THERE HAVE BEEN RELEASES OF PETROLEUM OR CERCLA HAZARDOUS SUBSTANCES ON THIS TRACT FROM PAST ACTIVITIES. ALL WORK SHALL BE COMPLETED PER REQUIREMENTS OF THE COMPREHENSIVE ENVIRONMENTAL RESP
- Environmental Protection Agency$5.73M
R10 DES: PALERMO WELLFIELD SUPERFUND SITE REMEDIAL INVESTIGATION AND FEASABILITY STUDY
- Environmental Protection Agency$9.56M
THIS IS A REMEDIATION ACTION FRAMEWORK (RAF) REMEDIATION ENVIRONMENTAL SERVICES (RES) TASK ORDER (TO) TO PROVIDE REMEDIAL ACTION AT THE JACKSON CERAMIX SUPERFUND SITE LOCATED IN FALLS CREEK, PENNSYLVANIA. THE REQUIREMENT IS SPECIFICALLY FOR IN-SITU
- Environmental Protection Agency$2.35M
SPRING PARK MUNICIPAL WELL FIELD (C51T): REGION 5, SFGLAES, SEMD, EA (68HE0523D0006), RI/FS TO
- Department of the Interior$301,164
CONDUCT SITE INVESTIGATION (SI) AND REMOVAL SITE EVALUATION (RSE) UNDER CERCLA AT SLATER CREEK AREAS IN BLACKSTONE RIVER VALLEY NATIONAL HISTORICAL PARK, RHODE ISLAND.
- Environmental Protection Agency$13.27M
R7 RES WASHINGTON COUNTY LEAD DISTRICT, OLD MINES, POTOSI, AND FURNACE CREEK SUPERFUND SITES OU1 RESIDENTIAL SOILS REMEDIATION WASHINGTON COUNTY, MISSOURI
- Environmental Protection Agency$10.93M
REMEDIATION ENVIRONMENTAL SERVICES (RES), RAM LEATHER CARE SUPERFUND SITE, REMEDIAL ACTION. THIS PROJECT INCLUDES BIL FUNDING.
- Environmental Protection Agency$898,342
LANE PLATING WORKS SUPERFUND SITE RAF DES TASK ORDER
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.