Federal contractor · public award history
NORTHROP GRUMMAN SYSTEMS CORPORATION
Parent: NORTHROP GRUMMAN SYSTEMS CORPORATION Unique Entity Identifier (UEI)LRVQERN7YNH9
- Awards we know about
- 2
- Typical size
- $2.82B
- Middle of their public awards
- Dollars on those awards
- $5.58B
Most of their awards we can see fall roughly between $2.00B and $3.65B.
SAM.gov registration
- Status
- Active
- Purpose of registration
- All awards (Z2)
- Registration expires
- Apr 28, 2027
- Activation date
- Apr 30, 2026
Other NAICS on file
Business types (SAM)
Registration fields from the official SAM.gov public entity extract (monthly bulk). Not a substitute for live SAM checks.
Continue contractor research
Use the verified identifiers and public award record to investigate documented incumbents, compare competitors, or identify possible teaming partners. This is a research starting point, not a capability or partner recommendation.
These official USAspending contract records do not rate capability or past performance and do not tell you whether to team or bid.
Awarding agencies
- National Aeronautics and Space Administration (2)
Industries & product codes
Award history
- National Aeronautics and Space Administration$4.47BSep 30, 2025Procurement Instrument Identifier (PIID)NNM07AA75CGuided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing336415Space R&D Services; Space Flight, Research And Supporting Activities; Basic ResearchAR11Contract awardUSAspending ↗
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
- National Aeronautics and Space Administration$1.17BSep 26, 2025Procurement Instrument Identifier (PIID)80MSFC20D0008Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing336415Space R&D Services; Space Flight, Research And Supporting Activities; Basic ResearchAR11Indefinite Delivery Vehicle (IDV)USAspending ↗
SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)
For research only. This is not legal advice, a past-performance review, or a recommendation to team or bid. Check USAspending and SAM.gov.