Federal contractor · public award history

CONSTRUCTION SOLUTIONS GROUP, LLC

UEIMAABCKNLHTB5CAGE6URP3SAINT LOUIS, MISSOURI

Parent: CONSTRUCTION SOLUTIONS GROUP, LLC MAABCKNLHTB5

Awards we know about
7
Typical size
$3.52M
Middle of their public awards
Dollars on those awards
$22.71M

Most of their awards we can see fall roughly between $1.50M and $4.28M.

From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.

Public award activity by year

Sum of award values in our USAspending index (not a full financial history).

  • 2024
    $2.74M
  • 2025
    $19.97M

Awarding agencies

  • Department of Transportation (6)
  • Department of the Interior (1)

Industries & product codes

Award history

  • Department of Transportation$3.54M
    Jul 30, 2025PIID 693C7324C000008NAICS 237310PSC Y1LBAWARDUSAspending ↗

    PROJECT FW-TREM 10(1): THE PROJECT CONSISTS OF GRADING, ROADWAY OBLITERATION, AGGREGATE BASE, AGGREGATE SURFACE COURSE, ASPHALT CONCRETE PAVEMENT, PORTLAND CEMENT CONCRETE PAVEMENT, PRECAST REINFORCED CONCRETE BOX CULVERTS, HELICAL PILES, STRUCTURAL

  • Department of Transportation$5.01M
    Jul 15, 2025PIID 69056724C000013NAICS 237310PSC Y1LBAWARDUSAspending ↗

    FUND CONSTRUCTION PROJECT ID FLAP CANYON MULTI(1), INDIANA AND ORCHARD SHARED ROADWAY. THIS WORK CONSISTS OF SHOULDER WIDENING AND A BOX CULVERT. CANYON COUNTY, IDAHO.

  • Department of Transportation$6.33M
    Apr 22, 2025PIID 6982AF25C000024NAICS 237310PSC Y1LBAWARDUSAspending ↗

    TX FLAP 200(1) LEWISVILLE LAKE ELA CN CONTRACT

  • Department of Transportation$3.52M
    Feb 13, 2025PIID 693C7324C000002NAICS 237310PSC Y1LBAWARDUSAspending ↗

    NP BLRI PVT PRES FY23(1) THE PROJECT CONSISTS OF CHIP SEAL WITH FOG SEAL OF ROADWAYS AND PARALLEL PULL-OFFS ALONG THE BLUE RIDGE PARKWAY FROM MP 27.2 TO MP 97.0. THE WORK INCLUDES ASPHALT PATCHING, CRACK CLEANING AND SEALING, PERMANENT PAVEMENT MARK

  • Department of the Interior$1.57M
    Jan 14, 2025PIID 140F0122C0104NAICS 237990PSC Z1KAAWARDUSAspending ↗

    ND-LONG LAKE NWR-REHAB DIKE A

  • Department of Transportation$1.31M
    Dec 2, 2024PIID 693C7319C000029NAICS 237310PSC Y1LBAWARDUSAspending ↗

    PROJECT FW IRRI-10(1) THE PROJECT CONSISTS OF REHABILITATION AND RECONSTRUCTION OF HATCHERY ENTRANCE ROADS AND PARKING AREAS. THE WORK INCLUDES CHIP SEAL, ASPHALT PAVEMENT OVERLAY, SIGNING AND STRIPING, DRAINAGE IMPROVEMENTS, PARKING AREA IMPROVEMEN

  • Department of Transportation$1.44M
    Oct 30, 2024PIID 6982AF23C000044NAICS 237310PSC Y1LBAWARDUSAspending ↗

    CA ERFO NP SEK 2021-1(1) GENERALS HIGHWAY WALL REPAIRS CONSTRUCTION CONTRACT FOR ERFO WALL, CURB, AND GUARDRAIL REPAIRS

Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.