Federal contractor · public award history
PERATON INC.
Parent: PERATON INC. N3RSDM1LXKK9
- Awards we know about
- 1
- Typical size
- $1.51B
- Middle of their public awards
- Dollars on those awards
- $1.20B
Most of their awards we can see fall roughly between $1.51B and $1.51B.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- National Aeronautics and Space Administration (1)
Industries & product codes
Award history
- National Aeronautics and Space Administration$1.51B
NASA GODDARD SPACE FLIGHT CENTER'S (GSFC) GOAL FOR THE SPACE COMMUNICATIONS NETWORKS SERVICES CONTRACT (SCNS) IS TO ENABLE MISSION SUCCESS FOR EVERY CUSTOMER USING SCNS SERVICES. KEY OBJECTIVES OF THE SCNS CONTRACT ARE TO DECREASE COST AND MAINTAIN OR IMPROVE OPERATIONAL EFFICIENCY AND RELIABILITY, WHILE MAINTAINING AN ACCEPTABLE LEVEL OF RISK AND PROVIDING FOR SAFE OPERATION OF THE MISSIONS. THE CONTRACTOR SHALL IMPLEMENT A SAFETY, HEALTH, AND MISSION ASSURANCE PROGRAM THAT PROVIDES A SAFE AND HEALTHY WORK ENVIRONMENT, MINIMIZES PROGRAM RISK, AND MAXIMIZES NASA MISSION SUCCESS. THE CONTRACTOR SHALL BE RESPONSIBLE AND ACCOUNTABLE FOR ACHIEVING THE REQUIRED RESULTS. CORE REQUIREMENT FUNCTIONS, SUCH AS CONFIGURATION MANAGEMENT, QUALITY ASSURANCE, ETC. ARE REQUIRED TO SUPPORT IDIQ TASK ORDERS. THE SPACE NETWORK (SN) IS COMPRISED OF A FLEET OF ON-ORBIT TRACKING AND DATA RELAY SATELLITES (TDRS) AND ASSOCIATED GROUND SYSTEMS THAT PROVIDE TELECOMMUNICATIONS SERVICES. THE NATURE OF THE SN ARCHITECTURE, I.E., EXTREMELY LARGE CAPITAL INVESTMENT, CONTRACTOR OPERATED FACILITIES, CONTINUOUS 24X7 REQUIREMENTS, ETC., LENDS ITSELF TO A CORE REQUIREMENTS APPROACH. THE GROUND NETWORK (GN) CONSISTS OF AN ORBITAL TRACKING NETWORK AND THE SATELLITE LASER RANGING NETWORK. THE NATURE OF THE GROUND NETWORK ARCHITECTURE, I.E., DIVERSE MIX OF COMMERCIAL AND GOVERNMENT ASSETS, EVOLVING GEOGRAPHIC AND TECHNICAL CUSTOMER REQUIREMENTS, AND LEGACY SYSTEMS, ETC. LENDS ITSELF TO AN IDIQ APPROACH. OTHER ACTIVITIES, I.E., VERY LONG BASELINE INTERFEROMETRY NETWORK OPERATIONS AND MAINTENANCE (O&M), ELECTRONIC SYSTEM TEST LABORATORY, REQUIREMENTS DEVELOPMENT, HARDWARE AND SOFTWARE DEVELOPMENT, ETC. ARE BEST SUITED TO AN IDIQ APPROACH IN THE RESOURCE-CONSTRAINED ENVIRONMENT THAT NASA OPERATES IN.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.