Federal contractor · public award history
PORT GRAHAM DEVELOPMENT CORPORATION
Parent: PORT GRAHAM DEVELOPMENT CORPORATION NAHNHCECQLB8
- Awards we know about
- 10
- Typical size
- $93,801
- Middle of their public awards
- Dollars on those awards
- $1.75M
Most of their awards we can see fall roughly between $93,328 and $125,050.
SAM.gov registration
Public extract 2026-07-05
- Status
- Active
- Purpose of registration
- All awards (Z2)
- Registration expires
- Sep 9, 2026
- Activation date
- Sep 11, 2025
- Primary NAICS (SAM)
- 311710
Business types (SAM)
Registration fields from the official SAM.gov public entity extract (monthly bulk). Not a substitute for live SAM checks.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Department of Transportation (7)
- Department of Energy (1)
- Department of the Interior (1)
- General Services Administration (1)
Industries & product codes
Award history
- Department of Transportation$96,808
IIJA FUNDED. FREELAND, MI (MBS) ASR JCN:18066401 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT FREELAND, MI (MBS) ASR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY.
- Department of the Interior$1.13M
SATELLITE RADIO SERVICE FOR OJS LMR
- General Services Administration—
FEDERAL SUPPLY SCHEDULE CONTRACT.
- Department of Transportation$92,866
IIJA FUNDED. FLINT, MI (FNT) ASR JCN: 19005396 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT FLINT, MI (FNT) ASR, WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY.
- Department of Transportation$93,801
IIJA FUNDED. ROCHESTER, MN (RSTB) ASR JCN: 24010113 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT ROCHESTER, MN (RSTB) ASR, WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACI
- Department of Transportation$93,789
IIJA FUNDED. MUSKEGON, MI (MKGE) ASR JCN: 22007976 THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT MUSKEGON, MI (MKGE) ASR, WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILI
- Department of Transportation—
PSG IDIQ CONTRACT FOR SITE SURVEY, DESIGN AND INSTALLATION
- Department of Energy—
INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONTRACT FOR GENERAL COMMUNICATION SITE TOWER MAINTENANCE
- Department of Transportation$153,292
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE KIRKSVILLE, MO (IRK) ARSR PER THE RFQ-24-21 BID PACKAGE. JCN:18060881
- Department of Transportation$88,338
BIL FUNDS. CONSTRUCTION COST OF UPS AND THE UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT THE GULFPORT, MS (GPT) ASR PER THE RFQ-24-25 BID PACKAGE. JCN: 18066536 INCLUDES OPTION #1 FULL ARC FLASH HAZARD ANALYSIS (AFHA) OF THE FACILITY.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.