Federal contractor · public award history
IRONWOOD COMMERCIAL BUILDERS INC
DBA IRONWOOD COMMERCIAL BUILDERS INC
Parent: IRONWOOD COMMERCIAL BUILDERS INC RCCQP8NYV433
- Awards we know about
- 27
- Typical size
- $1.23M
- Middle of their public awards
- Dollars on those awards
- $57.63M
Most of their awards we can see fall roughly between $781,926 and $2.79M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$5.47M
- 2025$52.16M
Awarding agencies
- Department of Agriculture (9)
- General Services Administration (7)
- Department of the Interior (7)
- National Aeronautics and Space Administration (4)
Industries & product codes
Award history
- National Aeronautics and Space Administration—
CONTRACT AWARDED UNDER THE WESTERN REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACTS (MACC) FOR GENERAL CONSTRUCTION, ALTERATION, MODIFICATION, REPAIR, DEMOLITION, DESIGN-BUILD OF BUILDINGS, FACILITIES, AND REAL PROPERTY.
- General Services Administration$6.05M
DESIGN BUILD FOR EXTERIOR MASONRY PROJECT AT BROWNING COURTHOUSE IN SAN FRANCISCO
- National Aeronautics and Space Administration$1.21M
CODE-Q CRANE CASTELLATED BEAM REPLACEMENT
- General Services Administration—
GSA PBS GOVERNMENTWIDE MULTIPLE AWARD IDIQ CONTRACT(S) FOR GENERAL CONSTRUCTION WITH DESIGN/BUILD CAPABILITIES TO SUPPORT THE INSTALLATION OF ELECTRIC VEHICLE SUPPLY EQUIPMENT(EVSE) FOR GEOGRAPHIC ZONE D
- Department of Agriculture$13.91M
NORTH COMPLEX (11) - CON - RELOCATION OF FR FIRE CREWS DESIGN BUILD
- Department of the Interior$649,861
HVAC AND REHAB SERVICES AT BEAR RIVER NWR
- Department of the Interior$1.82M
CLEAN AND INSPECT SEWER COLLECTION SYSTEMS AT YOSEMITE - MARIPOSA COUNTY, CA
- Department of the Interior$1.24M
NAVAJO NATIONAL MONUMENT(NAVA) REQUIRES THE REPLACEMENT OF THE LAGOON LINERS AND PIPING. - PIID# 140P1525R0008 PR# 0044007926 - USFWS MATOC# 140F0822D0057 COR: RYAN YOUNG, RYAN_YOUNG@NPS.GOV, CELL: (928)245-5121 CONTRACTING OFFICER: TAYLOR JONES
- Department of Agriculture$1.21M
GAOA VAULT TOILETS:
- Department of Agriculture$5.94M
GAOA JEMEZ NRA SITE PAVEMENT PRESERVATION AND RESTORATION PHASE II
- Department of Agriculture$900,711
THE PURPOSE OF THIS REQUISITION IS TO RECONSTRUCT AND REPAIR ROADS IN SUPPORT OF THE BIL FUNDED FUEL BREAK PROJECT ON CANYON LAKES RANGER DISTRICT.
- Department of Agriculture$3.05M
CONSTRUCTION. NFSR 121 TRICKEL PARK (AGGREGATE) ROAD RECONSTRUCTION. NATIONAL FOREST SYSTEM ROAD (NFSR) 121 - TRICKEL PARK ROAD RECONSTRUCTION. GRAND VALLEY RANGER DISTRICT, GRAND MESA, UNCOMPAHGRE, AND GUNNISON (GMUG) NATIONAL FORESTS.
- Department of Agriculture$398,547
GAOA MOUNT ST HELEN'S COMFORT STATION REPLACEMENTS
- General Services Administration$347,000
ELECTRIC VEHICLE CHARGING STATIONS INSTALLATION AT THE LUKEVILLE LAND PORT OF ENTRY (LPOE), 190 HWY 85, LUKEVILLE, AZ 85341
- Department of Agriculture$1.14M
RANCH (08) - CON - HIGH GLADE LOOKOUT, DESIGN/BUILD
- Department of the Interior$1.23M
STORM DAMAGE REPAIR
- Department of Agriculture—
USFS REGION 2 ROAD AND BRIDGE CONSTRUCTION MATOC
- General Services Administration—
REGION 9 CONSTRUCTION IDIQ ZONE 2 NOR CAL AND RENO
- General Services Administration$283,978
LANTERN AND STREET LIGHT RESTORATION AT US CUSTOMS HOUSE IN SAN FRANCISCO, CA -CA0092AA-
- General Services Administration$2,500
PBS REGION 8 MACC IDIQ
- National Aeronautics and Space Administration$696,881
REDUCE ELECTRICAL ARC FLASH RISK TO PERSONNEL, PHASE 1 OF 4-OPTION 3
- Department of the Interior$7.84M
UT-BEAR RIV MGRTRY BIRD-REHAB WCS
- Department of the Interior$1.39M
TO REPLACE A DOCK THAT HAS 10 BOAT SLIPS THAT HAVE EXCEEDED THEIR USEFUL LIFESPAN DUE TO STORMS AND RECENT DROUGHT.
- National Aeronautics and Space Administration$2.85M
N226 ABOVE GROUND FUEL AND WASH STATION
- Department of the Interior$2.73M
THE PURPOSE OF THIS PROJECT IS TO UPDATE THE OUTLET WORKS AT HYRUM DAM, APPROXIMATELY 10 MILES SOUTH OF LOGAN, UTAH IN CACHE COUNTY. THE PRINCIPLE COMPONENTS OF THE WORK ARE AS FOLLOWS: REMOVE THE EXISTING 24-INCH OUTLET WORKS PIPE, REMOVE THE CONCRE
- Department of Agriculture$866,970
GAOA GIFFORD PINCHOT COMFORT STATION REPLACEMENTS
- General Services Administration$1.87M
BECAUSE OF CONTINUING AND INCREASING LEAKS, THE GSA DESIRES TO REPAIR THE EXTERIOR ENVELOPE,INCLUDING REPAIRING CRACKS IN THE CONCRETE, RESEALING JOINTS, AND REPLACING WATERPROOFED DECK FINISHES.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.