Federal contractor · public award history

SOUTHWEST RESEARCH INSTITUTE

UEIPB11V1KH3KV4CAGE26401SAN ANTONIO, TEXAS

Parent: SOUTHWEST RESEARCH INSTITUTE PB11V1KH3KV4

Awards we know about
40
Typical size
$2.84M
Middle of their public awards
Dollars on those awards
$1.26B

Most of their awards we can see fall roughly between $107,500 and $39.28M.

From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.

Awarding agencies

  • National Aeronautics and Space Administration (21)
  • Department of Transportation (7)
  • Environmental Protection Agency (5)
  • Department of Energy (2)
  • Department of the Treasury (1)
  • Department of Agriculture (1)
  • General Services Administration (1)
  • Department of Health and Human Services (1)

Industries & product codes

Award history

  • Department of Transportation$838,294
    Sep 27, 2025PIID 693JK425F96035NNAICS 541330PSC R425AWARDUSAspending ↗

    AWARD OF 1ST TASK ORDER UNDER TESTING AND RAPID PROTOTYPING FOR INTEROPERABLE AUTOMATION SAFETY (TRPIAS) INDEFINITE-DELIVERY-INDEFINITE-QUANTITY (IDIQ)

  • National Aeronautics and Space Administration$60.29M
    Sep 25, 2025PIID 80GSFC25CA023NAICS 336414PSC AR14AWARDUSAspending ↗

    SPACE WEATHER CORONAGRAPH - EFFORTS INCLUDE INTEGRATE, TEST, CALIBRATE, EVALUATE, AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE CORONAGRAPH INSTRUMENTS.

  • Department of Transportation$18,259
    Sep 24, 2025PIID 693JJ923D000063NAICS 541380PSC H223IDVUSAspending ↗

    INITIATE SMALL BUSINESS REVIEW TO SUPPORT NEW REQUEST FOR PROPOSAL FOR A CONTRACT TO CONDUCT COMPLIANCE TESTING TO FMVSS NO. 218, "MOTORCYCLE HELMETS" AWARD IS SUBJECT TO AVAILABILITY OF FUNDS.

  • Department of Transportation
    Sep 24, 2025PIID 693JK425D600006NAICS 541330PSC R425IDVUSAspending ↗

    ESTABLISH A 5-YEAR TESTING AND RAPID PROTOTYPING FOR INTEROPERABLE AUTOMATION SAFETY (TRPIAS) V IDIQ FOR INTEGRATED TESTING/VALIDATION AND RAPID PROTOTYPING OF SAFETY-CRITICAL TECHNOLOGIES TO ADVANCE TRANSPORTATION/AUTOMATION SAFETY AND EFFICIENCY.

  • National Aeronautics and Space Administration$12.12M
    Sep 24, 2025PIID 80GSFC24CA041NAICS 541715PSC AR11AWARDUSAspending ↗

    JOINT EUV CORONAL DIAGNOSTIC INVESTIGATION (JEDI) EFFORT. PHASE A WORK INCLUDES INSTRUMENT REQUIREMENTS DEFINITION, INSTRUMENT MANAGEMENT, SYSTEM ENGINEERING, INSTRUMENT SAFETY & MISSION ASSURANCE, AND SYSTEM INTEGRATION PLANNING.

  • Department of Transportation$54,451
    Sep 24, 2025PIID 693JJ925F00099NNAICS 541380PSC H223AWARDUSAspending ↗

    TITLE: SWRI LABS FMVSS 218 MOTORCYCLE HELMET TESTING PROGRAM FUND THE COMPLIANCE PROGRAM FOR FMVSS NO. 218 - MOTORCYCLE HELMETS 693JJ923D000063. PERIOD OF PERFORMANCE: 28-SEP-2025 TO 27-SEP-2026

  • National Aeronautics and Space Administration$26.16M
    Sep 22, 2025PIID 80GSFC25CA025NAICS 336414PSC 6610AWARDUSAspending ↗

    DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, VERIFY, EVALUATE, SUPPORT LAUNCH, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT MISSION OPERATIONS AT NOSF.

  • Department of Transportation$452
    Sep 22, 2025PIID 693JJ923D000061NAICS 541380PSC H225IDVUSAspending ↗

    STANDARDS ENFORCEMENT PROGRAM FOR FMVSS NO. 304, "COMPRESSED NATURAL GAS FUEL CONTAINER INTEGRITY INITIATE SMALL BUSINESS REVIEW TO SUPPORT NEW REQUEST FOR PROPOSAL FOR A CONTRACT TO CONDUCT COMPLIANCE TESTING TO FMVSS NO. 304, "COMPRESS

  • Department of Transportation$147,876
    Sep 22, 2025PIID 693JJ925F00101NNAICS 541380PSC H225AWARDUSAspending ↗

    TITLE: FMVSS 304 CNG INTEGRITY TEST PROGRAM 693JJ923D000061 FUND THE COMPLIANCE PROGRAM FOR FMVSS NO. 304- CNG TANKS, PERIOD OF PERFORMANCE: 25-SEP-2025 TO 24-SEP-2026

  • National Aeronautics and Space Administration$14.31M
    Sep 19, 2025PIID 80GSFC20C0060NAICS 336414PSC 6610AWARDUSAspending ↗

    THE SPACE WEATHER FOLLOW ON (SWFO-L1) MISSION MAGNETOMETER SUITE (MAG) JOINT UNDERTAKING BETWEEN NASA AND NOAA.

  • Department of the Treasury$849,148
    Sep 18, 2025PIID 2031ZA25C00341NAICS 541715PSC AJ12AWARDUSAspending ↗

    R&D CONTRACT

  • National Aeronautics and Space Administration$144.35M
    Sep 17, 2025PIID 80GSFC18C0014NAICS 541330PSC 6610AWARDUSAspending ↗

    UNDER THIS CONTRACT, THE CONTRACTOR WILL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO PRODUCE THE POLARIMETER TO UNIFY THE CORONA HELIOSPHERE (PUNCH) PHASE A CONCEPT STUDY. THE SCOPE OF THIS EFFORT INCLUDES, BUT IS NOT LIMITED TO: 1. PRINCIPAL INVESTIGATOR PROGRAM OFFICE 2. INSTRUMENT SYSTEM ENGINEERING, INCLUDING INSTRUMENT MISSION ASSURANCE 3. DESIGN OF A FLIGHT QUALIFIED PUNCH INSTRUMENT MEETING MISSION AND SCIENCE REQUIREMENTS 4. DEVELOP PLANS IN SUPPORT OF INTEGRATION AND TEST OF THE PUNCH INSTRUMENT FLIGHT SYSTEM 5. DEVELOP PLANS IN SUPPORT OF ESSENTIAL FIELD OPERATIONS 6. DEVELOP PLANS IN SUPPORT OF LAUNCH OPERATIONS AND FLIGHT OPERATIONS 7. DEVELOP PLANS FOR LEAD THE PUNCH SCIENCE INVESTIGATION AS WELL AS THE GENERATION OF RESULTING DATA PRODUCTS THE CONTRACTOR SHALL PROVIDE A BRIEFING ON THE PUNCH SCIENCE AND SCIENCE IMPLEMENTATION PLAN AT THE PHASE A SITE VISIT. THE CONTRACTOR SHALL PROVIDE AN ORGANIZATION CHART DEFINING CONTRACTOR ROLES AND RESPONSIBILITIES, REPORTING PROCEDURES, AND ALL LINES OF AUTHORITY. THE CONTRACTOR SHALL PARTICIPATE IN DEFINING THE RELATIONSHIPS BETWEEN THE CONTRACTOR'S PROGRAM OFFICE AND THE NASA EXPLORERS PROGRAM OFFICE. THE CONTRACTOR SHALL DEVELOP A PUNCH INSTRUMENT SYSTEMS REQUIREMENTS DOCUMENT AND A PUNCH MISSION SYSTEMS REQUIREMENTS DOCUMENT. THE CONTRACTOR WILL ALSO DEVELOP DETAILED BLOCK DIAGRAMS AND TECHNICAL DESCRIPTIONS OF ALL INSTRUMENT SYSTEMS. THE CONTRACTOR WILL CONDUCT IN-DEPTH INSTRUMENT-LEVEL REVIEWS OF THE PROPOSED INSTRUMENT DESIGN. THEY WILL CONDUCT ESSENTIAL TRADE STUDIES, ANALYSES, MODELING AND SIMULATIONS TO ASSURE COMPLIANCE WITH INSTRUMENT REQUIREMENTS. THE CONTRACTOR WILL LEAD THE SCIENCE TEAM AND DEVELOP AN INSTRUMENT-LEVEL TEST PLAN AND PARTICIPATE IN PLANNING FOR INTEGRATION AND TEST. THE CONTRACTOR SHALL PREPARE A DETAILED INSTRUMENT DEVELOPMENT SCHEDULE COVERING ALL MISSION PHASES, LISTING MAJOR MILESTONES, INCLUDING A DEFINED CRITICAL PATH AND SCHEDULE RESERVES. THE CONTRACTOR WILL PREPARE UPDATED INSTRUMENT BUDGETS AS WELL AS REVIEW AND APPROVE THE OVERALL PUNCH BUDGET. FINALLY, THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONCEPT STUDY REPORT.

  • National Aeronautics and Space Administration$50.81M
    Sep 16, 2025PIID 80GSFC24F0001NAICS 336414PSC 1555AWARDUSAspending ↗

    DEVELOPMENT OF THE QUICKSOUNDER SC AND THE QUICKSOUNDER SATELLITE, INTEGRATION OF THE ATMS EDU, SHIPMENT TO THE LAUNCH SITE SUPPORT OF LAUNCH OPS & SATELLITE ACTIVATION, 3 YRS OF MISSION OPS & PERFORM DECOMMISSIONING OPERATION

  • National Aeronautics and Space Administration$8.49M
    Sep 11, 2025PIID 80GSFC20C0053NAICS 336419PSC AR45AWARDUSAspending ↗

    SOLAR ORBITER SPICE PHASES E/F EFFORT

  • National Aeronautics and Space Administration$41.72M
    Sep 11, 2025PIID NNG05EC87CNAICS 541710PSC AR21AWARDUSAspending ↗

    LUNAR RECONNAISSANCE OBITER MEASUREMENT INVESTIGATION PHASES A/B AND BRIDGE PHASE

  • National Aeronautics and Space Administration$2.76M
    Sep 11, 2025PIID 80GSFC23CA005NAICS 336419PSC J018AWARDUSAspending ↗

    GEOSPACE DYNAMICS CONSTELLATION (GDC) COMPREHENSIVE AURORAL PRECIPITATION EXPERIMENT (CAPE) PHASE A AND B BRIDGE

  • National Aeronautics and Space Administration$184.27M
    Sep 5, 2025PIID NNM06AA75CNAICS 541710PSC AR22AWARDUSAspending ↗

    THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HAS SELECTED JUNO NEW FRONTIERS MISSION UNDER THE DIRECTION OF PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON TO CONTINUE DEVELOPMENT WITH THE EXPECTATION THAT THE JUNO MISSION WILL ENTER PHASE B IN EARLY FISCAL YEAR 2006. THE JUNO MISSION WILL BE MANAGED BY THE MARSHALL SPACE FLIGHT CENTER, NEW FRONTIERS PROGRAM OFFICE. KEY JUNO TEAM MEMBERS INCLUDE DR. BOLTON'S HOME INSTITUTION, THE SOUTHWEST RESEARCH INSTITUTE (SWRI), THE JUNO IMPLEMENTATION TEAM LEADER JET PROPULSION LABORATORY (JPL) AND THE SPACECRAFT BUS PROVIDER THE LOCKHEED MARTIN SPACE SYSTEMS DIVISION (LM/SS). THE PI'S TEAM AT SWRI NEEDS TO BEGIN WORK ON A SUBSET OF PHASE B ACTIVITIES AS EARLY IN FY06 AS POSSIBLE. THIS SOW PROVIDES A LIST OF ACTIVITIES THAT ARE NECESSARY TO BEGIN WORK IN FY06 AND THEIR ASSOCIATED DELIVERABLES. THE JUNO MISSION IS A COLLABORATION BETWEEN SOUTHWEST RESEARCH INSTITUTE (SWRI), JPL, LOCKHEED MARTIN (LM), AND A COMPLEMENTARY TEAM OF UNIVERSITIES AND FIELD CENTERS. THE PRINCIPAL INVESTIGATOR, DR. SCOTT BOLTON, IS AT SOUTHWEST RESEARCH INSTITUTE (SWRI) AND IS RESPONSIBLE TO NASA FOR ALL ASPECTS OF THE MISSION INCLUDING ACHIEVING ALL SCIENTIFIC OBJECTIVES AND MISSION GOALS. JPL PROVIDES THE PROJECT MANAGER WHO OVERSEES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT AND WILL REPORT TO THE PI. PRINCIPAL INVESTIGATOR (PI) DR. SCOTT BOLTON IS RESPONSIBLE TO NASA FOR MEETING THE SCIENTIFIC OBJECTIVES OF THE JUNO MISSION WITHIN COST AND SCHEDULE. AS PI, DR. BOLTON HAS DIRECT ACCOUNTABILITY TO THE NASA NEW FRONTIERS PROGRAM OFFICE FOR THE IMPLEMENTATION OF JUNO. ALL JUNO SCIENCE CO-IS, THE DEPUTY PI AND PROJECT SCIENTIST, THE SCIENCE INVESTIGATION OFFICE MANAGER, THE E/PO EFFORT, THE JUNO ADVISORY BOARD AND THE PM REPORT DIRECTLY TO DR. BOLTON. THE PI DELEGATES THE DAY-TO-DAY MANAGEMENT OF THE PROJECT TO THE PROJECT MANAGER (PM), RICK GRAMMIER. THE PROJECT SYSTEM ENGINEER, PAYLOAD MANAGER, FLIGHT SYSTEM MANAGER, MISSION MANAGER, SCIENCE OPS CENTER, BUSINESS MANAGER, LM CONTRACT CTM, AND MISSION ASSURANCE MANAGER ALL REPORT DIRECTLY TO THE PM.

  • Environmental Protection Agency$640,534
    Aug 28, 2025PIID 68HERC25F0335NAICS 541330PSC R425AWARDUSAspending ↗

    PSC- R425 NEW TASK ORDER "PARTICULATE EMISSIONS MASS INSTRUMENT CALIBRATION" COST-PLUS FIXED-FEE (CPFF) COMPLETION TYPE, 24-MONTH PERIOD OF PERFORMANCE

  • National Aeronautics and Space Administration$2.77M
    Aug 25, 2025PIID 80GSFC25CA035NAICS 334516PSC 6640AWARDUSAspending ↗

    SUPRATHERMAL ION SPECTROGRAPH PHASE E INSTRUMENT FOR SOLAR ORBITER MISSION

  • National Aeronautics and Space Administration$36.85M
    Aug 25, 2025PIID NNM09AA24CNAICS 541712PSC AR22AWARDUSAspending ↗

    STROFIO - PHASE B IS AWARDED FROM ANNOUNCEMENT OF OPPORTUNITY (AO) NNM08ZDA009O, STAND ALONE MISSION OF OPPORTUNITY NOTICE (SALMON) ISSUED BY NASA HEADQUARTERS. SOUTHWEST RESEARCH INSTITUTE (SWRI) WAS SELECTED FOR "STROFIO: EXOSPHERIC SAMPLING OF MERCURY'S SURFACE COMPOSITION" WITH DR. STEFANO LIVI AS THE PRINCIPAL INVESTIGATOR FOR FUNDING AND APPROVED TO DIRECTLY ENTER PHASE B PRELIMINARY DESIGN AND TECHNOLOGY COMPLETION. STROFIO WAS SELECTED BECAUSE IT IS TIMELY AND TAKES ADVANTAGE OF A UNIQUE OPPORTUNITY FOR NASA TO PARTICIPATE THROUGH THIS INVESTIGATION IN THE BEPICOLOMBO MISSION. THE ANTICIPATED OBSERVATIONS OF MERCURY'S EXOSPHERE WILL BE UNIQUE AND COMPLEMENTARY TO INVESTIGATIONS CONDUCTED BY MARINER, MESSENGER AND THE OTHER INSTRUMENTS ON BEPICOLOMBO. THE PROPOSED INVESTIGATION WILL PROVIDE VALUABLE INFORMATION ABOUT MERCURY'S EXOSPHERE AND ITS INTERACTION WITH THE MAGNETOSPHERE AND SURFACE. THE STROFIO INSTRUMENT WILL PROVIDE A VALUABLE SCIENTIFIC RETURN, ADDRESSING MANY GOALS OF NASAS PLANETARY SCIENCE PROGRAM.

  • Environmental Protection Agency$100,000
    Aug 19, 2025PIID 68HERC25D0007NAICS 541330PSC R425IDVUSAspending ↗

    R425 - SUPPORT FOR TESTING AND ANALYTICAL SERVICES FOR REGULATION OF MOTOR VEHICLES, ENGINES, FUELS AND FUEL ADDITIVES

  • Environmental Protection Agency$25,645
    Aug 1, 2025PIID 0008NAICS 541712PSC AJ11AWARDUSAspending ↗

    IGF::OT::IGF EXPOSURE SCREENING TOOLS FOR ACCELERATED CHEMICAL PRIORITIZATION - TASK ORDER 8

  • National Aeronautics and Space Administration$24.07M
    Jul 24, 2025PIID 80GSFC20C0102NAICS 336414PSC 1675AWARDUSAspending ↗

    THE PRINCIPAL PURPOSE OF THIS REQUIREMENT WITHIN THE SWFO PROJECT IS TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, CALIBRATE, EVALUATE AND SUPPORT LAUNCH AND ON-ORBIT CHECK-OUT OF THE SWIPS INSTRUMENT AS PART OF THE SWFO-L1 OBSERVATORY.

  • National Aeronautics and Space Administration$178.57M
    Jul 24, 2025PIID HQTR0200204DNASW02008NAICS 541611PSC AR94AWARDUSAspending ↗

    NEW HORIZON -- PLUTO MISSION PHASE B

  • Department of Agriculture$31,500
    Jul 24, 2025PIID 12639525P0245NAICS 541380PSC B504AWARDUSAspending ↗

    AS PART OF A FUTURE PESTICIDE REGISTRATION APPLICATION TO EPA FOR A FERAL SWINE TOXICANT MANUFACTURED IN THE U.S., USDA APHIS MUST PROVIDE A PRELIMINARY (5-BATCH) ANALYSIS STUDY CONDUCTED ON 5 MANUFACTURING BATCHES FROM THE U.S. MANUFACTURING SOURCE

  • National Aeronautics and Space Administration$170.90M
    Jul 24, 2025PIID NNM16AA08CNAICS 541330PSC AR14AWARDUSAspending ↗

    IGF::CL,CT::IGF LUCY IS A PLANNED NASA SPACE PROBE THAT WILL TOUR FIVE JUPITER TROJANS, ASTEROIDS WHICH SHARE JUPITER'S ORBIT AROUND THE SUN, ORBITING EITHER AHEAD OF OR BEHIND THE PLANET AND ONE MAIN BELT ASTEROID. ALL TARGET ENCOUNTERS WILL BE FLY-BY ENCOUNTERS.

  • General Services Administration$2,500
    Jul 14, 2025PIID 47QRCA25DU309NAICS 541690PSC R499IDVUSAspending ↗

    ONE ACQUISITION SOLUTION FOR INTEGRATED SERVICES PLUS (OASIS+) UNRESTRICTED MULTIPLE AGENCY CONTRACT (MAC)

  • National Aeronautics and Space Administration$5.00M
    Jul 7, 2025PIID 80MSFC20C0024NAICS 541715PSC AR12AWARDUSAspending ↗

    THE CONTRACTOR SHALL PROVIDE MANAGEMENT OF THE DEFINITION PHASE EFFORT, MONITOR AND CONTROL TECHNICAL PERFORMANCE AND COST METRICS FOR THE LUNAR MAGNETOTELLURIC SOUNDER PROJECT.

  • Department of Transportation$822,465
    Jul 7, 2025PIID 693JJ920F000154NAICS 541330PSC AS21AWARDUSAspending ↗

    HYDROGEN CONTAINER FIRE TEST

  • Environmental Protection Agency$50,000
    Jun 26, 2025PIID 68HERC20D0027NAICS 541715PSC AJ41IDVUSAspending ↗

    THIS EFFORT IS IN SUPPORT OF THE TOXCAST PROGRAM, WHICH IS PART OF THE AGENCY'S CHEMICAL SAFETY AND SUSTAINABILITY (CSS) STRATEGIC RESEARCH ACTION PLAN

  • Department of Energy$30.71M
    Jun 24, 2025PIID 89233124CNA000374NAICS 541330PSC R425AWARDUSAspending ↗

    APEX DEVELOPMENT, DESIGN, FABRICATION, TESTING AND INSTALLATION FOR THE OFFICE OF DEFENSE NUCLEAR NONPROLIFERATION

  • Department of Energy$9.19M
    Jun 20, 2025PIID 89303022FET400026NAICS 541611PSC R499AWARDUSAspending ↗

    BASE IDIQ

  • Environmental Protection Agency$2.84M
    Jun 20, 2025PIID 68HERC24F0199NAICS 541330PSC R425AWARDUSAspending ↗

    TATD TASK ORDER FOR INTEGRATION, DEVELOPMENT, AND SUPPORT OF ELECTRONIC ENGINE CONTROLS TO UNDER 68HERC20D0014

  • National Aeronautics and Space Administration$63.39M
    Jun 17, 2025PIID NNG10EK25CNAICS 541720PSC 1820AWARDUSAspending ↗

    SOLAR ORBITER MEASUREMENT INVESTIGATION "HEAVY ION SENSOR". THE CONTRACTOR SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE HEAVY ION SENSOR TIME OF FLIGHT (HIS-TOF) SOLID STATE DETECTOR INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT; 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS; AND 3) POST OPERATIONS DATA REDUCTION AND ARCHIVING.

  • Department of Health and Human Services$125,250
    Jun 12, 2025PIID 75N91020P00727NAICS 541380PSC Q301AWARDUSAspending ↗

    EVALUATION OF VARIABILITY IN PESTICIDE CONCENTRATIONS IN HOUSE DUST SAMPLES COLLECTED IN FARMERS' HOMES IN SUPPORT OF THE DEPARTMENT OF HEALTH AND HUMAN SERVICES (DHHS), NATIONAL INSTITUTES OF HEALTH (NIH), NATIONAL CANCER INSTITUTE (NCI), DIVIS

  • National Aeronautics and Space Administration$70,000
    Jun 10, 2025PIID 80NSSC25PB230NAICS 541990PSC AJ11AWARDUSAspending ↗

    ASSIST NASA IN ITS DEVELOPMENT OF A PROBABILISTIC DAMAGE TOLERANCE (PDT) FRAMEWORK USING DARWIN

  • National Aeronautics and Space Administration$58.37M
    Jun 10, 2025PIID NNM13AA38CNAICS 541330PSC AR14AWARDUSAspending ↗

    PHASE A/B DEVELOPMENT OF THE JUICE ULTRAVIOLET SPECTROGRAPH IGF::CT,CL::IGF THE EUROPEAN SPACE AGENCY SELECTED THE JUPITER ICY MOONS EXPLORER (JUICE) MISSION AS THE FIRST MISSION IN ITS LARGE-CLASS MISSION PORTFOLIO UNDER THE COSMIC VISION PROGRAM. THE JUICE MISSION WILL INVESTIGATE JUPITER AND ITS ICY MOONS, COMPLETING ITS MISSION BY ORBITING GANYMEDE. THE MISSION IS PLANNED FOR LAUNCH IN 2022. THE NASA SCIENCE MISSION DIRECTORATE (SMD) HAS OFFERED TO COLLABORATE IN THIS MISSION. IN 2012, NASA ISSUED PROGRAM ELEMENT APPENDIX (PEA) K AS AN APPENDIX OF THE SECOND STAND ALONE MISSIONS OF OPPORTUNITY NOTICE (SALMON-2)(NNH12ZDA006O-JUICE) ANNOUNCEMENT OF OPPORTUNITY (AO)(NNH12ZDA006O) FOR THE PURPOSE OF SOLICITING PROPOSALS FOR JUICE MISSION OF OPPORTUNITY (MO) INVESTIGATIONS TO BE MANAGED UNDER THE NASA NEW FRONTIERS PROGRAM. THE JUICE ULTRAVIOLET IMAGING SPECTROGRAPH (JUICE-UVS) IS A COMPLETE, STAND-ALONE INSTRUMENT PROPOSED AND SELECTED UNDER THE SALMON-2 AO, TO BE INCLUDED IN THE ESA JUICE PAYLOAD AS PART OF NASAS U.S. CONTRIBUTION, AND DEVELOPED BY THE SOUTHWEST RESEARCH INSTITUTE (SWRI) IN SAN ANTONIO, TX. THE LEADER OF THE JUICE-UVS TEAM IS THE PRINCIPAL INVESTIGATOR (PI), DR. RANDY GLADSTONE OF SWRI. THE GOALS OF THE JUICE-UVS INVESTIGATION ARE TO: 1) EXPLORE THE ATMOSPHERES, PLASMA INTERACTIONS, AND SURFACES OF THE GALILEAN SATELLITES; 2) DETERMINE THE DYNAMICS, CHEMISTRY, AND VERTICAL STRUCTURE OF JUPITERS UPPER ATMOSPHERE, FROM EQUATOR TO POLE, AS A TEMPLATE FOR GIANT PLANETS EVERYWHERE; AND 3) INVESTIGATE THE JUPITER-IO CONNECTION BY QUANTIFYING ENERGY AND MASS FLOW IN THE IO ATMOSPHERE, NEUTRAL CLOUDS, AND TORUS. THESE GOALS ARE CLOSELY ALIGNED TO THOSE DESCRIBED IN THE JUICE ASSESSMENT STUDY REPORT, AND ARE CONSISTENT WITH NASA GOALS IN THE MOST RECENT PLANETARY DECADAL SURVEY, THE EJSM STUDY REPORT, AND SMDS FORMAL GOALS DOCUMENTS.

  • Department of the Interior$1,893
    Jun 5, 2025PIID 140D0425P0084NAICS 541330PSC R499AWARDUSAspending ↗

    OAS ENGINEERING SUPPORT SERVICES FOR AVIATION HELMET SPECIFICATION STANDARD

  • National Aeronautics and Space Administration$115,000
    May 22, 2025PIID 80NSSC25PB125NAICS 541330PSC R499AWARDUSAspending ↗

    NASGRO PRESSURE VESSEL DEVELOPMENT PLAN PHASE 12

  • National Aeronautics and Space Administration$391.93M
    May 14, 2025PIID NNG04EB99CNAICS 336414PSC AR21AWARDUSAspending ↗

    TAS::80 0120::TAS AS THE PRINCIPAL INVESTIGATOR (PI) INSTITUTION FOR THE MAGNETOSPHERIC MULTISCALE (MMS) INSTRUMENT SUITE SCIENCE TEAM (ISST), THE CONTRACTOR IS RESPONSIBLE FOR LEADING THE SOLVING MAGNETOSPHERIC ACCELERATION RECONNECTION AND TURBULENCE (SMART) TEAM THROUGH ALL MISSION PHASES. THE SCOPE OF WORK SHALL INCLUDE, BUT NOT BE LIMITED, TO THE FOLLOWING: - MANAGE THE SMART TEAM THROUGH PHASES B THROUGH E OF THE MMS MISSION, - DEFINING SCIENCE GOALS AND OBJECTIVES - ASSIST THE MMS PROJECT AND HQ SCIENCE MISSION DIRECTORATE HELIOPHYSICS DIVISION IN THE PREPARATION OF LEVEL 1 REQUIREMENTS FOR THE MMS MISSION - FLOW-DOWN OF TOP-LEVEL MISSION REQUIREMENTS TO THE APPROPRIATE ELEMENTS OF THE INSTRUMENT SUITE - DESIGN, FABRICATION, INTEGRATION, CALIBRATION, TESTING AND DELIVERY OF FOUR FULLY QUALIFIED, FLIGHT INSTRUMENT SUITES TO OBSERVATORY INTEGRATION AND TEST (I&T) PLUS SPARES - DESIGN, DEVELOPMENT, INTEGRATION AND TESTING OF THE SOC - SUPPORT OBSERVATORY-LEVEL I&T ACTIVITIES - PROVIDE SUSTAINING ENGINEERING AND I&T SUPPORT OF THE INSTRUMENT SUITES AFTER DELIVERY TO NASA - RESPONSIBILITY FOR THE ON-ORBIT OPERATION, HEALTH AND SAFETY OF THE INSTRUMENT SUITES - RESPONSIBILITY FOR OPERATING AND MAINTAINING THE SOC POST-LAUNCH - ESTABLISHING AND MANAGING SUBCONTRACTS WITH INSTRUMENT SUITE TEAM MEMBERS - ESTABLISHING AND MAINTAINING THE REQUIRED INTERNATIONAL TRAFFIC IN ARMS REGULATIONS (ITAR) AND EXPORT CONTROL DOCUMENTATION NECESSARY FOR WORKING WITH ITS INTERNATIONAL TEAM MEMBERS - IMPLEMENTATION OF AN EPO PROGRAM FOR THE MMS MISSION

Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.

Related open government contracts

Industry 541330

Open SAM.gov notices in industries where this company has public awards — not exclusive work for this firm.