Federal contractor · public award history

NORTHROP GRUMMAN SYSTEMS CORPORATION

DBA CCI SPEER

UEIQ11ZHUFBW741CAGE8L7J1DULLES, VIRGINIA

Parent: NORTHROP GRUMMAN CORPORATION NKVZLJL93QT6

Awards we know about
10
Typical size
$25.02M
Middle of their public awards
Dollars on those awards
$5.77B

Most of their awards we can see fall roughly between $3.55M and $479.93M.

From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.

Awarding agencies

  • National Aeronautics and Space Administration (10)

Industries & product codes

Award history

  • National Aeronautics and Space Administration$1.83B
    Sep 26, 2025PIID NNH15CN76CNAICS 541712PSC AR21AWARDUSAspending ↗

    IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS

  • National Aeronautics and Space Administration$745,840
    Sep 25, 2025PIID 80GSFC25CA015NAICS 541715PSC AR11AWARDUSAspending ↗

    ADVANCED X-RAY IMAGING SATELLITE (AXIS) PHASE A

  • National Aeronautics and Space Administration$24.70M
    Sep 25, 2025PIID 80GSFC22CA018NAICS 517919PSC AR15AWARDUSAspending ↗

    ICE, CLOUD, AND LAND ELEVATION-2 (ICESAT-2) MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.

  • National Aeronautics and Space Administration$3.65B
    Sep 24, 2025PIID NNJ16GU21BNAICS 481212PSC V126IDVUSAspending ↗

    IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2

  • National Aeronautics and Space Administration$3.50M
    Sep 23, 2025PIID 80MSFC24CA014NAICS 541715PSC AR11AWARDUSAspending ↗

    STABLE: SYSTEMS TECHNOLOGIES FOR ARCHITECTURE BASELINE

  • National Aeronautics and Space Administration$606.01M
    Sep 23, 2025PIID NNG15VE05DNAICS 336414PSC 1810AWARDUSAspending ↗

    JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION.

  • National Aeronautics and Space Administration$25.34M
    Sep 22, 2025PIID 80ARC024CA007NAICS 541715PSC AR13AWARDUSAspending ↗

    HELIOSWARM PROGRAM SUPPORT

  • National Aeronautics and Space Administration$101.70M
    Sep 4, 2025PIID NNG14FC04CNAICS 336414PSC 1810AWARDUSAspending ↗

    THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES.

  • National Aeronautics and Space Administration$491,218
    May 20, 2025PIID 80GSFC24CA045NAICS 541715PSC AR11AWARDUSAspending ↗

    STRATOSPHERE TROPOSPHERE RESPONSE USING INFRARED VERTICALLY-RESOLVED LIGHT EXPLORER (STRIVE) SPACECRAFT AND MISSION OPS PHASE A

  • National Aeronautics and Space Administration$3.68M
    Apr 16, 2025PIID 80ARC021C0006NAICS 541715PSC AR13AWARDUSAspending ↗

    HELIO SWARM PHASE A SUPPORT

Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.

Related open government contracts

Industry 541715

Open SAM.gov notices in industries where this company has public awards — not exclusive work for this firm.