Federal contractor · public award history
RICHARD GROUP LLC
Parent: RICHARD GROUP LLC S78JAMNYYF29
- Awards we know about
- 29
- Typical size
- $8.83M
- Middle of their public awards
- Dollars on those awards
- $493.07M
Most of their awards we can see fall roughly between $3.66M and $36.45M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Department of Veterans Affairs (25)
- General Services Administration (4)
Industries & product codes
Award history
- Department of Veterans Affairs$4.41M
CONSTRUCTION OF A FIRE ALARM CORRECTIONS TO THE EXISTING FIRE ALARM SYSTEMS AT JESSE BROWN VAMC IN CHICAGO.
- Department of Veterans Affairs$8.86M
RENOVATE WATER MAINS
- General Services Administration—
GSA PBS GOVERNMENTWIDE MULTIPLE AWARD IDIQ CONTRACT(S) FOR GENERAL CONSTRUCTION WITH DESIGN/BUILD CAPABILITIES TO SUPPORT THE INSTALLATION OF ELECTRIC VEHICLE SUPPLY EQUIPMENT(EVSE) FOR GEOGRAPHIC ZONE C
- General Services Administration$6.66M
TASK ORDER AWARD FOR THE 3RD FLOOR USMS DETENTION AREA AND COURTS JURY ASSEMBLY ROOM RENOVATION PROJECT TAKING PLACE AT THE PAUL FINDLEY FEDERAL BUILDING & U.S. COURTHOUSE IN SPRINGFIELD, ILLINOIS
- Department of Veterans Affairs$41.57M
CONSTRUCT SURGICAL INTENSIVE CARE UNIT (SICU) AND RENOVATE OPERATING ROOMS (OR) OKVAMC, OKLAHOMA CITY, OK
- Department of Veterans Affairs—
VISN 17 CENTRAL TEXAS MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) IDIQ.
- Department of Veterans Affairs$10.15M
442-24-014 DB RENOVATE 3RD FLOOR COWBOY AND OTHER AREAS
- Department of Veterans Affairs$40.90M
CONTRACTOR SHALL COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING STRUCTURES, AND FURNISH LABOR AND MATERIALS AND PERFORM WORK FOR THE EHRM INFRASTRUCTURE UPGRADES MADISON PROJECT.
- Department of Veterans Affairs$8.80M
IFB AND CONTRACT FOR PROJECT 695-19-114, UPGRADE PLUMBING FOR LEGIONELLA PREVENTION
- Department of Veterans Affairs$7.95M
523-19-602 INSTALL SITE SECURITY CAMPUS WIDE, VA MEDICAL CENTER JAMAICA PLAIN, BOSTON, MA
- Department of Veterans Affairs$64.67M
EHRM INFRASTRUCTURE UPGRADES - CENTRAL WESTERN MASSACHUSETTS
- Department of Veterans Affairs$52.74M
ERHM BATTLE CREEK INFRASTRUCTURE UPGRADES CONSTRUCTION
- Department of Veterans Affairs$19.54M
EHRM-CONSTRUCTION CONTRACT FOR INFRASTRUCTURE UPGRADES
- Department of Veterans Affairs$24.90M
RELOCATION AND RENOVATION OF STERILE PROCESSING SERVICES MINOR CONSTRUCTION PROJECT AT THE WEST HAVEN VAMC IN WEST HAVEN, CT
- Department of Veterans Affairs$4.40M
PROJECT 537-19-127, BLOOD LAB RENOVATION CONSTRUCTION
- General Services Administration—
GENERAL SERVICES ADMINISTRATION REGION 5 REPAIR AND ALTERATIONS SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT, VARIOUS LOCATIONS, GENERAL SERVICES ADMINISTRATION REGION 5.
- Department of Veterans Affairs—
PITTSBURGH BUTER ERIE CONSTRUCTION MATOC
- Department of Veterans Affairs$51.55M
CONTRACTOR TO PROVIDE CONSTRUCTION SERVICES TO COMPLETE THE EHRM PROJECT AT THE MINNEAPOLIS VAMC
- Department of Veterans Affairs$5,000
PITTSBURGH BUTER ERIE CONSTRUCTION MATOC: MIN GUARANTEE
- Department of Veterans Affairs$1.00M
CON AWARD OF PROEJECT 556-24-127 FACILITY IMPROVEMENTS
- Department of Veterans Affairs$3.93M
580-17-121 UPGRADE/RENOVATE/RELOCATE SPA DEPARTMENT
- Department of Veterans Affairs$356,725
523-24-003 SITE SIDEWALK IMPROVEMENTS
- Department of Veterans Affairs$274,468
631-22-704 NEXT GEN WIFI PROJECT
- Department of Veterans Affairs—
VISN 1 CONSTRUCTION MATOC FOR ALL HEALTHCARE FACILITIES WITHIN THE VISN 1 NEW ENGLAND HEALTHCARE SYSTEM
- Department of Veterans Affairs$2.83M
SAFETY UPDATES IN MENTAL HEALTH BUILDING DANVILLE IL
- General Services Administration$2.35M
ELECTRIC VEHICLE SUPPLY EQUIPMENT FEASIBILITY STUDY
- Department of Veterans Affairs$75.65M
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRA. UPG. HINES IL CONSTRUCTION PROJECT CONSISTENT WITH SPECS AND DRAWINGS
- Department of Veterans Affairs$34.97M
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE EHRM INFRASTRUCTURE UPGRADES PROJECT.
- Department of Veterans Affairs$24.61M
WORK INCLUDES INFRASTRUCTURE UPGRADES AND RECONFIGURING AND RENOVATING EXISTING SPACES ALONG WITH ASSOCIATED WORK IN OTHER BUILDINGS AS INDICATED TO COMPLETE THE EHRM INFRASTRUCTURE UPGRADE, AS LAID OUT IN THE SPECIFICATIONS AND DRAWINGS.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.