Federal contractor · public award history

THE REGENTS OF THE UNIVERSITY OF COLORADO

DBA UNIVERSITY OF COLORADO

UEISPVKK1RC2MZ3CAGE4B475BOULDER, COLORADO

Parent: THE REGENTS OF THE UNIVERSITY OF COLORADO SPVKK1RC2MZ3

Awards we know about
40
Typical size
$507,000
Middle of their public awards
Dollars on those awards
$636.45M

Most of their awards we can see fall roughly between $203,268 and $6.96M.

From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.

Awarding agencies

  • National Aeronautics and Space Administration (26)
  • Department of Commerce (6)
  • Department of the Interior (5)
  • Department of Health and Human Services (2)
  • Department of Energy (1)

Industries & product codes

Award history

  • Department of Energy$32,438
    Sep 30, 2025PIID 89603022P0030NAICS 511210PSC 7A20AWARDUSAspending ↗

    RIVERWARE LICENSES

  • National Aeronautics and Space Administration$8.89M
    Sep 29, 2025PIID 80GSFC23CA004NAICS 336419PSC J018AWARDUSAspending ↗

    PHASE A-B BRIDGE AETHER INSTRUMENT FOR THE GDC SPACECRAFT

  • National Aeronautics and Space Administration$5.03M
    Sep 25, 2025PIID 80LARC25F7015NAICS 541715PSC AR11AWARDUSAspending ↗

    ADDITIONAL SUPPORT AT THE PAYLOAD SYSTEM LEVEL ASSEMBLY, INTEGRATION, ALIGNMENT, TEST, CHARACTERIZATION, CALIBRATION, VERIFICATION, AND ENVIRONMENTAL QUALIFICATION FOR DELIVERY OF THE FULLY QUALIFIED LIBERA FLIGHT INSTRUMENT.

  • National Aeronautics and Space Administration$37.24M
    Sep 25, 2025PIID 80GSFC19C0069NAICS 336419PSC AR14AWARDUSAspending ↗

    PROVIDE ENGINEERING ANALYSES, HARDWARE & SOFTWARE DEVELOPMENT, FABRICATION, INTEGRATION, TEST, EVALUATION, INTEGRATION WITH SPACECRAFT, LAUNCH, INSTRUMENT ACTIVATION, CALIBRATION, VALIDATION, & OPERATIONS THROUGH 60-DAY CHECKOUT FOR TSIS2 PAYLOAD.

  • National Aeronautics and Space Administration$10.25M
    Sep 23, 2025PIID 80GSFC23CA062NAICS 517810PSC AR15AWARDUSAspending ↗

    PROVIDE CONTINUED MISSION OPERATIONS AND DATA PROCESSING SUPPORT SERVICES TO CONTINUE PERFORMING KEY CLIMATE MEASUREMENTS THROUGH TOTAL AND SPECTRAL SOLAR IRRADIANCE SENSOR SYSTEMS CURRENTLY IN OPERATION ON THE INTERNATIONAL SPACE STATION.

  • National Aeronautics and Space Administration$1.11M
    Sep 23, 2025PIID 80LARC22CA001NAICS 541715PSC AR12AWARDUSAspending ↗

    CALIBRATION OF THE LUNAR SPECTRAL REFLECTION FROM SPACE OF THE ARCTONE INSTRUMENT TO INCLUDE FUNCTIONS SUCH AS: CHARACTERIZATION OF THE ARCTONE INSTRUMENT DESIGN, FABRICATE AND TEST ITS FLIGHT CALIBRATION SYSTEM PARTICIPATE IN PAYLOAD ACTIVITIES

  • Department of Commerce$319,999
    Sep 22, 2025PIID 1305M325P0248NAICS 541990PSC R499AWARDUSAspending ↗

    ENHANCING THE INTEGRATION OF DROUGHT IMPACTS AND RISK COMMUNICATION INTO REGIONAL AND NATIONAL DROUGHT EARLY WARNING

  • Department of Commerce$94,997
    Sep 22, 2025PIID 1333MJ25P0050NAICS 561990PSC F999AWARDUSAspending ↗

    ISOTOPE INTERPRETATION SERVICES

  • National Aeronautics and Space Administration$1.03M
    Sep 19, 2025PIID 80LARC25F7026NAICS 541715PSC AR11AWARDUSAspending ↗

    PROVIDE AN INTERNAL ABSOLUTE TIME SEQUENCE (ATS) SEPARATE FROM THE JOINT POLAR SATELLITE SYSTEM (JPSS) SATELLITE OPERATION COMMAND TABLE AND DELIVER A BINARY FILE IN THE LIBERA ABSOLUTE TIME SEQUENCE (ATS) FORMAT.

  • National Aeronautics and Space Administration$123.50M
    Sep 19, 2025PIID 80LARC20D0006NAICS 541715PSC AR21IDVUSAspending ↗

    LIBERA, EARTH VENTURE CONTINUITY 1 MISSION. PROVIDE AN INSTRUMENT TO BE INTEGRATED ON THE UPCOMING JOINT POLAR SATELLITE SYSTEM-3 SATELLITE THAT WILL MEASURE SHORT WAVE LONG WAVE AND TOTAL RADIATION AT TOP OF THE ATMOSPHERE

  • National Aeronautics and Space Administration$600,000
    Sep 19, 2025PIID 80LARC25F7033NAICS 541715PSC AR11AWARDUSAspending ↗

    LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) SUPPORT FOR SPACECRAFT INTEGRATION AND TEST (I&T) PLANNING VERIFICATION WITH JOINT POLAR SATELLITE SYSTEM (JPSS).

  • National Aeronautics and Space Administration$38.61M
    Sep 15, 2025PIID 80GSFC18C0061NAICS 541720PSC AZ12AWARDUSAspending ↗

    GLOBAL-SCALE OBSERVATIONS OF THE LIMB AND DISK (GOLD) MISSION. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, EQUIPMENT, AND FACILITIES NECESSARY TO ACCOMPLISH THE GOLD MISSION AS DESCRIBED IN THE GOLD CONCEPT STUDY REPORT. THE CONTRACTOR SHALL PROVIDE REPORTS, REVIEWS, AND DOCUMENTATION FOR ALL ASPECTS OF THE PROGRAM. THE CONTRACTOR SHALL MANAGE THE ACTIVITIES OF THE SCIENCE TEAM. THE CONTRACTOR SHALL MAINTAIN THE GOLD SCIENCE DATA CENTER (SDC) AT UCF, AND SHALL PERFORM DATA REDUCTION AND ANALYSIS FOR THREE YEARS AFTER THE COMPLETION OF COMMISSIONING THE GOLD INSTRUMENT. THE CONTRACTOR SHALL PRESENT THE SCIENTIFIC RESULTS IN PRESENTATIONS AND PUBLISHED PAPERS, AND PROVIDE RAW DATA AND DATA PRODUCTS FOR ARCHIVING TO AN APPROVED DATA ARCHIVE. THE CONTRACTOR IS RESPONSIBLE FOR ALGORITHM DEVELOPMENT AND SCIENCE PLANNING AND ANALYSIS OF MISSION DATA AND THE PUBLICATION OF RESULTS. THE GOLD PROJECT SHALL FOLLOW THE GUIDELINES OF A MISSION OF OPPORTUNITY AND THE GOLD CONTRACT. THE GOLD PRINCIPAL INVESTIGATOR (PI) SHALL HAVE SOLE RESPONSIBILITY FOR THE SUCCESSFUL COMPLETION OF THIS PROJECT. THE PI SHALL DELEGATE PROJECT MANAGEMENT TASKS TO THE PROJECT MANAGER (PM) AS APPROPRIATE. THE PM SHALL DIRECT THE GOLD PROJECT AND HAVE THE RESPONSIBILITY FOR OVERALL TECHNICAL PERFORMANCE AND RESOURCE MANAGEMENT OF THE CONTRACT AND ALL SUBCONTRACTS. THE PI/PM SHALL BE THE FOCAL POINT FOR ALL CONTACT WITH THE GOVERNMENT. THE PM AND STAFF SHALL SUPPORT THE PI AS REQUIRED INCLUDING THE SCHEDULING AND COORDINATING OF MEETINGS AND REVIEWS, SCHEDULE CONTROL AND REPORTING, FINANCIAL CONTROL AND REPORTING, SUBCONTRACT MANAGEMENT, CONFIGURATION MANAGEMENT AND DOCUMENTATION, PROGRESS REPORTS AND REVIEWS AS WELL AS ALL ANOMALY REPORTING ACTIVITIES.

  • National Aeronautics and Space Administration$40.19M
    Sep 15, 2025PIID 80GSFC23CA035NAICS 541715PSC AJ11AWARDUSAspending ↗

    SUPPORT FOR THE SNOW AND ICE DISTRIBUTED ACTIVE ARCHIVE CENTER (DAAC) FOR THE EARTH OBSERVING SYSTEM DATA AND INFORMATION SYSTEM (EOSDIS)

  • Department of the Interior$222,480
    Sep 13, 2025PIID 140R8125F0192NAICS 541511PSC DF01AWARDUSAspending ↗

    RIVERWARE SOFTWARE SUPPORT

  • National Aeronautics and Space Administration$794,050
    Sep 12, 2025PIID 80LARC25F7010NAICS 541715PSC AR12AWARDUSAspending ↗

    CONDUCT 3 TOTAL DRESS REHEARSALS TO MITIGATE RISK ASSOCIATED WITH EXTENDED STORAGE PERIOD.

  • National Aeronautics and Space Administration$3.91M
    Sep 11, 2025PIID 80GSFC22CA012NAICS 541715PSC AR12AWARDUSAspending ↗

    INTERDISCIPLINARY SCIENTIST SUPPORT FOR THE GEOSPACE DYNAMICS CONSTELLATION (GDC) PROGRAM. THIS ACTION IS A RESULT OF THE UNIVERSITY'S SELECTION UNDER A NASA RESEARCH ANNOUNCEMENT (NRA NNH21ZDA001N GDCIDS).

  • National Aeronautics and Space Administration$507,000
    Sep 11, 2025PIID 80JSC023F0069NAICS 541990PSC AR12AWARDUSAspending ↗

    C. ELEGANS BIOLOGICAL INVESTIGATION ON MICROBIOME EFFECT IN SPACE

  • National Aeronautics and Space Administration$450,000
    Sep 8, 2025PIID 80JSC025F7032NAICS 541990PSC AR12AWARDUSAspending ↗

    HUMAN INDUCED PLURIPOTENT STEM CELL-DERIVED CARDIOMYOCYTES (HIPSC-CMS) TERRESTRIALLY FABRICATED INTO PHYSIOLOGICALLY RELEVANT 3D ENGINEERED HEART TISSUES (EHTS) WILL BE STUDIED ABOARD THE INTERNATIONAL SPACE STATION (ISS).

  • National Aeronautics and Space Administration$507,000
    Sep 8, 2025PIID 80JSC023F0015NAICS 541990PSC AR12AWARDUSAspending ↗

    MABL-B

  • National Aeronautics and Space Administration$3.32M
    Sep 8, 2025PIID 80JSC022F0146NAICS 541990PSC AR12AWARDUSAspending ↗

    PRODUCTION OF LARGE POPULATIONS OF HEMATOPOIETIC STEM CELLS (HSCS) IN MICROGRAVITY TO TREAT SERIOUS MEDICAL CONDITIONS INCLUDING BLOOD CANCERS (LEUKEMIAS, LYMPHOMAS, MULTIPLE MYELOMA), FATAL BLOOD DISORDERS, AND SEVERE IMMUNE DISEASES.

  • National Aeronautics and Space Administration$295,000
    Sep 4, 2025PIID 80GSFC24CA049NAICS 541715PSC AR11AWARDUSAspending ↗

    DYNAMICAL NEUTRAL ATMOSPHERE-IONOSPHERE COUPLING (DYNAMIC) PHASE A

  • National Aeronautics and Space Administration$61.62M
    Aug 29, 2025PIID GSFC0200210DNAS502140NAICS 541710PSC AR22AWARDUSAspending ↗

    EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO)

  • Department of Commerce$24,900
    Aug 27, 2025PIID 1305M325P0229NAICS 541620PSC B510AWARDUSAspending ↗

    SERVICES, NON-PERSONAL, CONTRACTOR TO FURNISH ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY FOR TECHNICAL REPORT DEVELOPMENT AND DISSEMINATION

  • Department of Commerce$499,950
    Aug 26, 2025PIID 1305M325F0167NAICS 541380PSC B516AWARDUSAspending ↗

    ISOTOPE ANALYSIS TASK ORDER

  • Department of the Interior$125,000
    Aug 22, 2025PIID 140R4025F0076NAICS 541511PSC DA10AWARDUSAspending ↗

    MRG RIVERWARE SUPPORT AND DEVELOPMENT

  • National Aeronautics and Space Administration$151.10M
    Aug 19, 2025PIID NNH10CC04CNAICS 541712PSC R425AWARDUSAspending ↗

    NASA HEADQUARTERS (HQ) MANAGES THE MARS EXPLORATION PROGRAM (MEP), WHICH SELECTED THE MARS ATMOSPHERE AND VOLATILE EVOLUTION (MAVEN) PROJECT AS A MARS SCOUT MISSION. THE MAVEN PRINCIPAL INVESTIGATOR (PI) IS DR. BRUCE JAKOSKY, OF THE UNIVERSITY OF COLORADO, LABORATORY FOR ATMOSPHERIC AND SPACE PHYSICS (LASP) IN BOULDER, CO. THE PI WILL HAVE OVERALL CONTROL OF THE MAVEN PROJECT. HE WILL PROVIDE SCIENCE LEADERSHIP FOR THE MAVEN MISSION AND MANAGE EDUCATION AND PUBLIC OUTREACH. THIS EFFORT APPLIES TO LASP AND COVERS PHASES A, B, C, D, AND E OF THE MAVEN MISSION. UNDER PHASE A OF THIS CONTRACT, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULE MANAGEMENT, PROVIDING TECHNICAL PROGRESS REPORTS, AND MISSION REVIEWS. UNDER PHASE B, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING REQUIREMENTS ANALYSIS, PROJECT PLANS, PRELIMINARY DESIGN REVIEWS, MONTHLY STATUS REVIEWS, QUARTERLY TEAM MEETINGS, E/PO ACTIVITIES, AND THE PRELIMINARY SCIENCE DATA MANAGEMENT PLAN. UNDER PHASES C AND D, THE CONTRACTOR IS RESPONSIBLE FOR SUPPORTING MONTHLY STATUS REVIEWS, QUARTERLY TEAM REVIEWS, RESPONDING TO ACTION ITEMS THAT RESULT FROM MEETINGS/REVIEWS, SUPPORTING FORMAL REVIEWS AND LAUNCH SITE ACTIVITIES, AND MANAGEMENT OF E/PO ACTIVITIES. UNDER PHASE E, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING OVERALL MANAGEMENT OF THE MAVEN SCIENCE PROGRAM AND DATA ANALYSIS ACTIVITIES, ENSURING DELIVERY OF MAVEN SCIENCE DATA PRODUCTS, MISSION DOCUMENTATION, AND ANALYTICAL SOFTWARE TOOLS INTO PDS, PARTICIPATING IN ANALYSIS AND RESOLUTION OF SPACECRAFT ANOMALIES, AS NECESSARY, PROVIDING OVERALL MANAGEMENT OF E/PO ACTIVITIES PER E/PO PLAN, PRESENTING SCIENTIFIC RESULTS AT NATIONAL CONFERENCES AND IN SCIENTIFIC LITERATURE, AND PROVIDING CONTRACT CLOSEOUT SUPPORT.

  • Department of the Interior$95,995
    Aug 19, 2025PIID 140R4024F0011NAICS 541511PSC DA10AWARDUSAspending ↗

    CADSWES RIVERWARE ORDER

  • Department of the Interior$327,719
    Aug 18, 2025PIID 140R4022P0068NAICS 532420PSC 7520AWARDUSAspending ↗

    CADSWES EQUIPMENT, SPACE, AND ADMINISTRATIVE AND TECHNICAL SUPPORT

  • National Aeronautics and Space Administration$85.39M
    Aug 11, 2025PIID 80LARC18C0001NAICS 541715PSC AR12IDVUSAspending ↗

    CLIMATE ABSOLUTE RADIANCE AND REFRACTIVITY OBSERVATORY PATHFINDER INSTRUMENT, PAYLOAD, AND MISSION OPERATIONS

  • National Aeronautics and Space Administration$503,838
    Aug 8, 2025PIID 80LARC25F7012NAICS 541715PSC AR12AWARDUSAspending ↗

    CONDUCT A PURGED BAKEOUT CONTAMINATION CONTROL STUDY THAT CONTRIBUTES SPECIFIC, DATA-BACKED CONCLUSIONS AND RECOMMENDATIONS TO THE SPACEFLIGHT CONTAMINATION CONTROL COMMUNITY REGARDING THE METHODS, EQUIPMENT, AND PROCESS FOR PURGED BAKEOUT.

  • National Aeronautics and Space Administration$12,327
    Aug 7, 2025PIID 80JSC025FA161NAICS 541715PSC AR12AWARDUSAspending ↗

    ISRO SHIPPING OF SCIENCE SAMPLES.

  • Department of Commerce$1.09M
    Aug 4, 2025PIID 1305M325F0131NAICS 541380PSC B516AWARDUSAspending ↗

    ISOTOPE ANALYSIS TASK ORDER.

  • Department of Commerce$59,999
    Jul 31, 2025PIID 1333MJ25P0024NAICS 561990PSC F999AWARDUSAspending ↗

    SAMPLING SERVICES INCLUDING COLLECTION OF RESEARCH QUALITY ATMOSPHERIC AIR SAMPLES AND IN-SITU SURFACE OZONE MEASUREMENTS AS WELL AS CALIBRATION REFERENCE AIR CYLINDER PREPARATION AND FILLING FROM THE NIWOT RIDGE SITE NORTHWEST OF BOULDER, COLORADO.

  • Department of Health and Human Services$55,169
    Jul 30, 2025PIID 75N94020F00001NAICS 541714PSC AN12AWARDUSAspending ↗

    TO ASSIST IN THE DEVELOPMENT OF NEW CONTRACEPTIVE PRODUCTS BY PROVIDING SERVICES RELATED TO PROTOCOL REVIEW, PROTOCOL DEVELOPMENT AND ACTIVITIES ASSOCIATED WITH PAST, PRESENT AND FUTURE CCTN ACTIVITIES. UNIVERSITY OF COLORADO-75N94020D00019/75N940

  • Department of Health and Human Services$86,597
    Jul 24, 2025PIID 75N94025F00001NAICS 541714PSC AN12AWARDUSAspending ↗

    NICHD: SERVICE: CCTN LB PHASE 2B CLINICAL TRIAL: NON-SEVERABLE

  • National Aeronautics and Space Administration$4.93M
    Jul 21, 2025PIID 80MSFC20C0016NAICS 541715PSC AZ12AWARDUSAspending ↗

    LUNAR COMPACT INFRARED SYSTEM (L-CIRIS)

  • National Aeronautics and Space Administration$115.50M
    Jul 17, 2025PIID NNG07HW00CNAICS 541330PSC AR45AWARDUSAspending ↗

    TAS::80 0120::TAS THIS CONTRACT IS FOR THE TASKS NECESSARY TO DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE EUVS XRS IRRADIANCE SENSORS (EXIS), SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE EXIS IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT SUITE ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE EXIS FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO EXIS EMULATORS (EXISES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL EXIS MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT: A) OPTION 1 FOR AN ADDITIONAL FLIGHT MODEL (FM-2) B) OPTION 2 FOR AN ADDITIONAL FLIGHT MODEL (FM-3) C) OPTION 3FOR AN ADDITIONAL FLIGHT MODEL (FM-3)

  • Department of the Interior$184,055
    Jul 16, 2025PIID 140D0421P0129NAICS 611310PSC R799AWARDUSAspending ↗

    RECRUITING SERVICES - COLORADO UNIVERSITY BOULDER

  • National Aeronautics and Space Administration
    Jul 8, 2025PIID 80JSC025DA003NAICS 541715PSC AJ11IDVUSAspending ↗

    LOW EARTH ORBIT SPACE LIFE SCIENCE RESEARCH PLATFORM PROVISION, AND ASSOCIATED MISSION INTEGRATION AND OPERATIONS FOR USE OF THOSE RESEARCH PLATFORMS.

  • National Aeronautics and Space Administration$507,000
    Jul 2, 2025PIID 80JSC023F0062NAICS 541990PSC AR12AWARDUSAspending ↗

    ISS: ENGINEERING SCAFFOLD-FREE, BIOMIMETIC NEOCARTILAGE IN MICROGRAVITY TO GUIDE TERRESTRIAL TISSUE ENGINEERING STRATEGIES

Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.

Related open government contracts

Industry 541715

Open SAM.gov notices in industries where this company has public awards — not exclusive work for this firm.