Federal contractor · public award history
CALIFORNIA INSTITUTE OF TECHNOLOGY
Parent: CALIFORNIA INSTITUTE OF TECHNOLOGY U2JMKHNS5TG4
- Awards we know about
- 7
- Typical size
- $58.79M
- Middle of their public awards
- Dollars on those awards
- $399.62M
Most of their awards we can see fall roughly between $54.14M and $109.02M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- National Aeronautics and Space Administration (7)
Industries & product codes
Award history
- National Aeronautics and Space Administration$54.98M
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
- National Aeronautics and Space Administration$58.79M
SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)
- National Aeronautics and Space Administration$106.97M
THE ULTRAVIOLET EXPLORER (UVEX)
- National Aeronautics and Space Administration$111.08M
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.
- National Aeronautics and Space Administration$1.53M
THE EARTH SYSTEM EXPLORERS PROGRAM (ESEP) THE CARBON INVESTIGATION (CARBON-I) MISSION PHASE A CONCEPT STUDY.
- National Aeronautics and Space Administration$149.32M
NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
- National Aeronautics and Space Administration$53.30M
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.