Federal contractor · public award history

ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC.

DBA SPACE TELESCOPE SCIENCE INST

UEIW1NBN156CYF9CAGE4X357BALTIMORE, MARYLAND

Parent: ASSOCIATION OF UNIVERSITIES FOR RESEARCH IN ASTRONOMY, INC. W1NBN156CYF9

Awards we know about
4
Typical size
$968.75M
Middle of their public awards
Dollars on those awards
$4.08B

Most of their awards we can see fall roughly between $154.93M and $1.94B.

From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.

Awarding agencies

  • National Aeronautics and Space Administration (4)

Industries & product codes

Award history

  • National Aeronautics and Space Administration$2.57B
    Sep 30, 2025PIID GSFC0198106DNAS526555NAICS 333314PSC AR21AWARDUSAspending ↗

    THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT INCLUDE THE FINAL SERVICING MISSION AND SUBSEQUENT OPERATIONS THROUGH END-OF-MISSION. THESE ACTIVITIES INCLUDE: A. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, MANAGEMENT OF THE PROPOSAL SELECTION, TIME ALLOCATION, AND GRANT AWARD COMMITTEE PROCESSES, AND SCIENCE COMMUNITY OUTREACH. B. ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION AND RECEIPT, OBSERVATION PLANNING AND SCHEDULING, UPDATING INSTRUMENT HANDBOOKS, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, ANOMALY INVESTIGATION SUPPORT, USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE AND ENGINEERING OPERATIONS SUPPORT. C. GROUND SYSTEM SUSTAINING ENGINEERING INCLUDING: SCIENCE OPERATION SYSTEM MAINTENANCE, INFRASTRUCTURE ADMINISTRATION AND SUPPORT, AND DOCUMENTATION MAINTENANCE D. SERVICING MISSION SUPPORT INCLUDING: PREPARATION AND EXECUTION OF THE OBSERVATORY VERIFICATION PROGRAM, INSTRUMENT DEVELOPMENT SUPPORT, AND OPTICAL ALIGNMENT TESTING SUPPORT E. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE HSTP F. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH G. SPECIAL PROJECTS INCLUDING ORIGINS FORUM AND INDEPENDENT RESEARCH THIS CONTRACT INCLUDES AN ADDITIONAL TWO-YEAR PERIOD AFTER THE END OF HST'S SCIENCE-MISSION. THIS EXTRA TIME FOLLOWING THE CESSATION OF SCIENTIFIC OBSERVATIONS IS FOR TWO YEARS OF FOLLOW-ON ARCHIVAL RESEARCH. DURING THE FINAL TWO YEARS OF THE CONTRACT, ARCHIVAL OPERATIONS AND MAINTENANCE, AN ARCHIVAL RESEARCH PROPOSAL SELECTION PROCESS AND ASSOCIATED GRANT ADMINISTRATION, AND A PUBLIC OUTREACH PROGRAM WILL CONTINUE. DATA ANALYSIS SOFTWARE WILL ALSO BE MAINTAINED BUT AT A LOWER LEVEL OF SUPPORT SUCH THAT ONLY MODEST ENHANCEMENTS MAY STILL BE MADE. CONTINUING SUPPORT WILL ALSO INCLUDE THE COORDINATION OF DATA ANALYSIS SOFTWARE THAT IS PRODUCED BY THE ASTRONOMICAL COMMUNITY. ORIG PSC AR20

  • National Aeronautics and Space Administration$1.73B
    Sep 11, 2025PIID NAS503127NAICS 541710PSC AR45AWARDUSAspending ↗

    THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.

  • National Aeronautics and Space Administration$204.96M
    Sep 8, 2025PIID 80GSFC19C0054NAICS 541715PSC AR45AWARDUSAspending ↗

    THIS CONTRACT IS FOR THE PRODUCTS AND SERVICES ASSOCIATED WITH THE DESIGN PHASE OF THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST) SCIENCE OPERATIONS CENTER (SOC)

  • National Aeronautics and Space Administration$4.87M
    Jul 14, 2025PIID NNA09DA83CNAICS 541712PSC AR22AWARDUSAspending ↗

    KEPLER DATA MANAGEMENT CENTER (PHASE E) - PHASE E CONSISTS OF ALL TASKS NECESSARY TO OPERATE THE DATA MANAGEMENT CENTER (DMC); THE PROCESSING, TRANSMISSION AND ARCHIVING OF KEPLER SCIENCE AND ANCILLARY ENGINEERING DATA. THE CONTRACTOR IS RESPONSIBLE FOR OPERATING THE DMC, MONITORING ITS HEALTH AND STATUS AND PROVIDING TECHNICAL SUPPORT FOR TROUBLESHOOTING ANOMALIES. DURING THIS PHASE, THE CONTRACTOR SHALL IMPLEMENT TH EPLANS AND PROCEDURES DEVELOPED DURING PHASE C/D.

Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.

Related open government contracts

Industry 333314

Open SAM.gov notices in industries where this company has public awards — not exclusive work for this firm.