Federal contractor · public award history
RMF ENGINEERING, INC., P.C.
Parent: RMF ENGINEERING, INC., P.C. Y7YJFTG997E7
- Awards we know about
- 40
- Typical size
- $424,443
- Middle of their public awards
- Dollars on those awards
- $34.26M
Most of their awards we can see fall roughly between $144,830 and $1.41M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- Department of Health and Human Services (30)
- Department of State (7)
- Department of the Treasury (1)
- Department of Homeland Security (1)
- General Services Administration (1)
Industries & product codes
Award history
- Department of Health and Human Services$388,020
C201611 - DEVELOP AND DESIGN A COMPREHENSIVE CODE-COMPLIANT SOLUTION THAT SEAMLESSLY INTEGRATES FIRE ALARM DETECTION, NOTIFICATION, AND CONTROL SYSTEMS INTO A UNIFIED PLATFORM - ELIZABETH OLUWAFEMI
- Department of Health and Human Services$2.88M
C111148 - EXTENDED SERVICES A/E CGMP SUBJECT MATTER EXPERT FOR NIH CLINICAL CENTER PHARMACY AND PERMANENT INTRAVENOUS ADMIXTURE UNIT (PIVAU)
- Department of the Treasury$70,642
STEAM SERVICE CONSULTATION
- Department of Health and Human Services$573,190
C116130 - 15% SCHEMATIC DESIGN SERVICES, INCLUDING A PRELIMINARY AND PROFESSIONAL COST ESTIMATE FOR NIH BUILDING 21 IN BETHESDA, MD.
- Department of Health and Human Services$645,420
OD POOLESVILLE - CONVERT BUILDING 102 A & B WINGS; FUND REQUEST FOR COMMISSIONING SERVICES; PO JOSE MOREL LOPEZ [24-000187]
- Department of Health and Human Services$94,752
C112535 BLDGS 8 8A REPLACE REHEAT TERMINAL UNITS (PHASE 01) COMMISSIONING SERVICES
- Department of Health and Human Services$223,062
C108793 - PCAS REPLACE CHILLED WATER VERTICAL RISERS, BLDG. 10 - ACRF NEW CONTRACT ACTION FOR POST DESIGN
- Department of Homeland Security$36,647
THIS AWARD IS TO PROCURE COMMISSIONING SERVICES FOR THE RENOVATION OF BUILDING 37 AT PORT ISABEL DETENTION CENTER.
- Department of Health and Human Services$219,904
C201565 - A STUDY OF EXISTING CONDITIONS WITH ANALYSIS TO DETERMINE THE MOST FEASIBLE APPROACH TO SUPPORT THE BLDG.62 WITH CENTRAL UTILITY SYSTEM FROM THE CENTRAL UTILITY DISTRIBUTION TUNNEL - MOHAMMED BISWAS
- Department of Health and Human Services$368,103
C112329 - BLDG. 31B 5TH FLOOR SUITE RENOVATION NINR CONSTRUCTION. COR: LENIN ANDRADE CO: MARIO HENRIQUEZ
- Department of Health and Human Services$341,825
C104573 - THIS AWARD IS ESSENTIAL TO PROVIDE POST DESIGN SERVICES FOR STEAM AND CHILLED WATER LINE REPLACEMENTS FROM VALVE VAULT 2 TO VALVE 2 VAULT 31C TO OPTIMIZE EFFICIENCY AND RELIABILITY TO PRODUCE AND DISTRIBUTE STEAM TO THE NIH BETHESDA CAMPUS.
- General Services Administration—
FEDERAL SUPPLY SCHEDULE CONTRACT
- Department of Health and Human Services$65,077
C103746 - DESIGN - TANK RE-DESIGN SOUTH TANK AND PUMP HOUSE WITH BID ALTERNATE FOR NORTH TANK
- Department of Health and Human Services$764,220
C103025 - BRIDGING DOCUMENTS FOR VENTILATION SYSTEM AT CUP CO: ZACHARY PRICE CS: MARIO HENRIQUEZ COR: VANESSA ARGOTE MACIA PAST PERFORMANCE POC: STEVE O'REILLY
- Department of Health and Human Services$51,980
C102579 - COMMISSIONING FOR CHILLER REPLACEMENT -PERIOD OF PERFORMANCE TO JUNE 30, 2024.
- Department of Health and Human Services$819,272
C102579 AE SERVICES COMMISSIONING SERVICES FOR REPLACE R22 CHILLERS PROJECT, BUILDING 11 (CUP), NIH, BETHESDA, MD, HAGHJOU, MANSOUR.
- Department of Health and Human Services$606,740
C115324 AWARD IS ESSENTIAL FOR DESIGN SRVCS TO INSTALL NEW FEEDERS TO BLDG 101. THE CURRENT CONFIGURATION ON CAMPUS DOES NOT SUPPORT FULL REDUNDANCY TO THE NORTH CAMPUS ELECTRIC INFRASTRUCTURE, ENDANGERING ANIMAL HEALTHCARE AND RESEARCH ACTIVITIES.
- Department of Health and Human Services$314,961
C116120 BLDG 50 GENERAL EXHAUST UPGRADES CS: CHRIS HSU CO: ZACH PRICE COR: JULIANNA SAVIOLA
- Department of Health and Human Services$140,760
C104565- THE CONTRACT ACTION IS ESSENTIAL TO PROVIDE A DESIGN REFRESH FOR REPAIR AND REPLACEMENT OF AHUS #1,2,&3 IN BLDG 31A TO ENSURE THE FACILITY REMAINS COMPLIANT WITH ALL SAFETY, REGULATORY, AND FUNCTIONAL SPECIFICATIONS.
- Department of Health and Human Services$157,041
AE C104550 DESCRIPTION - BASE AE SERVICES TO AWARD IN AID OF REPLACING OBSOLETE CIRCUIT BREAKER TRIP UNITS IN BUILDING 10 CO - DAVE SEID COR - ASHISH PANDIT VENDOR POC - DUSTIN BARRALL
- Department of State$1.52M
COMMISSIONING SERVICES FOR PHASE 1 PHASE 2 FOR THE ASHGABAT NEC PROJECT.
- Department of State$3.01M
COMMISSIONING SERVICES FOR THE 35%, 60%, 90%, 100% AND IFC DESIGN REVIEWS AND EARLY CONSTRUCTION SUBMITTAL REVIEWS FOR THE BANGKOK NOX PROJECT.
- Department of State$1.91M
COMMISSIONING AGENT FOR PRE-DESIGN SERVICES IN SUPPORT THE HERMOSILLO NCC PROJECT.
- Department of State$2.64M
COMMISSIONING SERVICES FOR THE PORT LOUIS, MOZAMBIQUE NEC PROJECT.
- Department of Health and Human Services$332,469
C106708 - CA/CQM - PROVIDE ALL LABOR AND SUPERVISION FOR THE BOILER FEEDWATER PUMP REPLACEMENT , BLDG 11, VANESSA ARGOTE MACIA
- Department of Health and Human Services$2.06M
C100883 CQM SERVICES FOR CLINICAL CENTER RADIO PHARMACY/BIOLOGICS RADIOLABELING FACILITY COR: ASHISH PANDIT
- Department of Health and Human Services$1.07M
C107469 - PROVIDE ALL LABOR, SUPERVISION AND MATERIAL TO PROVIDE CQM AND CX SERVICES FOR THE BASE AND OPTION YEAR 1 FOR THE ELECTRICAL UPGRADE PROJECT PER THE STATEMENT OF WORK (SOW) DATED: 01/09/2025
- Department of State$3.12M
THIS TASK ORDER PROVIDES FUNDING FOR THE CONSTRUCTION PHASE FOR SITE COMMISSIONING SERVICES ERBIL NCC PROJECT.
- Department of Health and Human Services$2.14M
C100444 - DESIGN FOR CONSTRUCTION REPAIRS -DESIGN WILL INVOLVE ALL DEFICIENCIES IN THE MLP 8, 7A, 10 AND ACRF PARKING GARAGES - LENIN ANDRADE
- Department of Health and Human Services—
C102867 - TASK ORDER - SECURITY ENHANCEMENTS - FEASIBILITY STUDY REPORT OF THE INSTALLATION OF INTERNAL SECURITY CAMERAS IN THE BUILDING 11 - HHSN292201500004I - MARTY HAGHJOU
- Department of State$2.58M
CONSTRUCTION PHASE FOR COMMISSIONING SERVICES LOCATED AT THE NEW EMBASSY COMPOUND IN NUEVO POLANCO DISTRICT MEXICO CITY, MEXICO.
- Department of Health and Human Services$3.43M
C103498 PROJECT MANAGER CLOSE OUT PHASE ROCKLEDGE
- Department of Health and Human Services$36,849
C200863 - FEASIBILITY STUDY, BLDG 11 (CUP) CONSOLIDATED COOLING TOWER (CT) BLOWDOWN TO SANITARY SEWER SYSTEM - HAITAO MA
- Department of State$710,424
IGF::OT::IGF THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE FUNDING FOR THE DESIGN SITE SUPPORT WELLINGTON CX PROJECT LOCATED IN NEW ZEALAND.
- Department of Health and Human Services$579,325
C116492 - CONTRACT AE PEER REVIEWS, LOGIC DIAGRAMS, CX/BAS SUPPORT, RCA FOR INTRAMURAL PROJECTS - BASE PERIOD - JORDAN BLACKBURN
- Department of Health and Human Services$186,037
C105672 - PROVIDE ALL WORK AND LABOR AND MATERIALS FOR CQM SERVICES OF ELECTRICAL SWITCHING STATION 57 CS: BRAD ARENSDORF CO: ZACH PRICE COR: SAM SERAJ
- Department of Health and Human Services$15,490
THIS TASK ORDER ENGAGES SPECIALIZED ENGINEERS TO INVESTIGATE AND PROVIDE SOLUTIONS TO OPERATIONAL ISSUES WITH TWO HIGH-EFFICIENCY SIDE STREAM FILTERS PURCHASED BY THE GOVERNMENT/NIH IN 2023, WHICH HAVE CAUSED BACTERIAL GROWTH AND WATER SYSTEM CONTAMI
- Department of Health and Human Services$98,881
C200282 -PROVIDE A DESIGN CONTRACT FOR MEP SERVICES TO DESIGN OF THE CHILLED WATER, ELECTRICAL, AND MECHANICAL UTILITIES FOR A NEW HELIUM COMPRESSOR IN THE NMR CENTER TO ACCOMMODATE THE FUTURE INSTALLED EQUIPMENT, CONSIDERING EXISTING EQUIP
- Department of Health and Human Services$460,865
C109948 DESIGN SERVICES FOR BUILDING 10 COMPLEX MASS NOTIFICATION IMPROVEMENTS: CONNECT TO CAMPUS MASS NOTIFICATION SYSTEM C109949 DESIGN SERVICES FOR BUILDING 10 COMPLEX MASS NOTIFICATION IMPROVEMENTS: EXTERIOR SPEAKERS C115489 DESIGN SERVICES FOR
- Department of Health and Human Services$114,116
C112880 DESIGN STUDIES IN BUILDING 60 AND BUILDING 60A LUIS BONTA.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.