Federal contractor · public award history
ESTES BROS. CONST. INC.
DBA ESTES BROS CONSTRUCTION INC
Parent: ESTES BROS. CONST. INC. Unique Entity Identifier (UEI)YKVNGM329N76
- Awards we know about
- 15
- Typical size
- $3.02M
- Middle of their public awards
- Dollars on those awards
- $137.80M
Most of their awards we can see fall roughly between $1.85M and $8.53M.
SAM.gov registration
- Status
- Active
- Purpose of registration
- All awards (Z2)
- Registration expires
- Oct 6, 2026
- Activation date
- Oct 8, 2025
- Primary NAICS (SAM)
- Highway, Street, and Bridge Construction237310
Other NAICS on file
Business types (SAM)
Registration fields from the official SAM.gov public entity extract (monthly bulk). Not a substitute for live SAM checks.
Continue contractor research
Use the verified identifiers and public award record to investigate documented incumbents, compare competitors, or identify possible teaming partners. This is a research starting point, not a capability or partner recommendation.
These official USAspending contract records do not rate capability or past performance and do not tell you whether to team or bid.
Awarding agencies
- Department of Transportation (15)
Industries & product codes
Award history
- Department of Transportation$2.72MSep 16, 2025Procurement Instrument Identifier (PIID)693C7325F00010NHighway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$23.06MSep 15, 2025Procurement Instrument Identifier (PIID)693C7324C000009Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS
- Department of Transportation—Sep 2, 2025Procurement Instrument Identifier (PIID)693C7320D000017Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBIndefinite Delivery Vehicle (IDV)USAspending ↗
PROJECT: SOUTH-ATLANTIC REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation$3.18MAug 26, 2025Procurement Instrument Identifier (PIID)693C7325F00013NHighway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I
- Department of Transportation$794,382Jul 22, 2025Procurement Instrument Identifier (PIID)693C7324F00059NHighway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING
- Department of Transportation$3.69MJul 21, 2025Procurement Instrument Identifier (PIID)693C7322F00109NHighway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA
- Department of Transportation—Jun 12, 2025Procurement Instrument Identifier (PIID)693C7320D000008Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBIndefinite Delivery Vehicle (IDV)USAspending ↗
PROJECT: SOUTH REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation$66.06MJun 2, 2025Procurement Instrument Identifier (PIID)693C7321C000001Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.
- Department of Transportation—May 9, 2025Procurement Instrument Identifier (PIID)693C7320D000004Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBIndefinite Delivery Vehicle (IDV)USAspending ↗
PROJECT: MID-ATLANTIC REGIONAL CONSTRUCTION IDIQ MATOC.
- Department of Transportation$2.95MApr 10, 2025Procurement Instrument Identifier (PIID)693C7320C000025Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT NP GRSM 14(3), 112(1), ETC. THE PROJECT CONSISTS OF REHABILITATION OF 9 BRIDGES ON THE TENNESSEE SIDE OF THE GREAT SMOKY MOUNTAIN NATIONAL PARK. THE WORK INCLUDES ASPHALT WEARING COURSE REMOVAL, SCOUR PROTECTION AROUND EXISTING ABUTMENTS AN
- Department of Transportation$302,073Mar 26, 2025Procurement Instrument Identifier (PIID)693C7324F00055NHighway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT FL NP DESO 900(1): THE PROJECT CONSISTS OF RESURFACING THE VISITOR ENTRANCE ROAD AND PARKING AREAS. THE WORK INCLUDES MILLING AND OVERLAY, FULL DEPTH PATCH, AND OTHER MISCELLANEOUS WORK.
- Department of Transportation$32.59MMar 26, 2025Procurement Instrument Identifier (PIID)693C7325C000008Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB
- Department of Transportation$1.19MDec 2, 2024Procurement Instrument Identifier (PIID)693C7319C000037Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
GREAT SMOKY MOUNTAINS NATIONAL PARK - NP-GRSM 116(1) - THE PROJECT CONSISTS OF RESURFACING APPROXIMATELY 3.3 MILES OF ROADWAYS OF THE DEEP CREEK AREA, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK I
- Department of Transportation$2.06MDec 2, 2024Procurement Instrument Identifier (PIID)693C7322F000009Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT MS ERFO NPS VICK 2020-1(1). THE PROJECT CONSIST OF RECONSTRUCTING ROADS TO RESTORE TO PRE-DISASTER CONDITION. THE WORK INCLUDES SLIDE REPAIRS AND BRIDGE REPAIRS. THE WORK ITEMS WILL INCLUDE EROSION AND SEDIMENT CONTROL, TEMPORARY DIVERSION B
- Department of Transportation$3.09MOct 24, 2024Procurement Instrument Identifier (PIID)693C7321F000016Highway, Street, and Bridge Construction237310Construction Of Highways, Roads, Streets, Bridges, And RailwaysY1LBContract awardUSAspending ↗
PROJECT NP-BLRI PVT PRES FY20 THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (THIN-LIFT ASPHALT OVERLAY) OF OVERLOOKS, PICNIC AREAS AND PARKING AREAS ALONG BLUE RIDGE PARKWAY. THE WORK INCLUDES PAVEMENT MARKING INSTALLATION AND OTHER MISCE
For research only. This is not legal advice, a past-performance review, or a recommendation to team or bid. Check USAspending and SAM.gov.