Federal contractor · public award history
HEALTHEON, INC
DBA HEALTHEON INC
Parent: HEALTHEON, INC YNMQH3WNRBN5
- Awards we know about
- 21
- Typical size
- $8.08M
- Middle of their public awards
- Dollars on those awards
- $210.13M
Most of their awards we can see fall roughly between $4.87M and $15.89M.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Public award activity by year
Sum of award values in our USAspending index (not a full financial history).
- 2024$4.47M
- 2025$206.55M
Awarding agencies
- National Aeronautics and Space Administration (19)
- Department of Homeland Security (2)
Industries & product codes
Award history
- National Aeronautics and Space Administration$6.26M
TAINTER VALVE REHABILITATION
- National Aeronautics and Space Administration$22.78M
CONSTRUCTION OF CENTER FACILITY SUPPORT BUILDING - BUILDING 22
- National Aeronautics and Space Administration$7.47M
BUILDING 24 CHILLER REPLACEMENT
- National Aeronautics and Space Administration—
GLENN MULTIPLE AWARD CONSTRUCTION CONTRACTS 2
- National Aeronautics and Space Administration$2.72M
SEWER REHAB AND OPTIMIZATION OF E-COMPLEX AND CRYOGENICS AT STENNIS SPACE CENTER, MS
- National Aeronautics and Space Administration$25.26M
BUILDING 31X ARES ANNEX - CONSTRUCTION
- National Aeronautics and Space Administration$22.14M
AVIATION LOGISTICS OPERATIONS FACILITY (ALOF) DESIGN-BUILD
- Department of Homeland Security—
NMACC III MULTIPLE AWARD CONSTRUCTION CONTRACT POOL 2
- National Aeronautics and Space Administration$6.37M
SAFETY AND RELIABILITY UPGRADE OF INSTITUTIONAL POWER SYSTEMS, PHASE 5, COMMUNICATIONS DISTRIBUTION AND SWITCHING CENTER SUBSTATION 138A/B REPLACEMENT AT KENNEDY SPACE CENTER, FLORIDA
- National Aeronautics and Space Administration$2.77M
SAFETY AND RELIABILITY POWER UPGRADES PHASE 4A AT KENNEDY SPACE CENTER, FL.
- National Aeronautics and Space Administration$8.69M
REPAIR OF THE MECHANICAL SYSTEMS IN BUILDING 7- CREW SYSTEMS LABORATORY
- Department of Homeland Security—
NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III) IDIQ
- National Aeronautics and Space Administration$39.36M
ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).
- National Aeronautics and Space Administration$8.68M
WETLANDS MITIGATION
- National Aeronautics and Space Administration$6.06M
PROJECT TITLE: MSFC UTILITY CONTROL SYSTEM RISK REDUCTION PHASE 2
- National Aeronautics and Space Administration$3.03M
REPLACE MEDIUM AND LOW VOLTAGE ELECTRICAL EQUIPMENT, SUCH AS 13.8KV LOADBREAK SWITCHES, PAD-MOUNT SWITCHES, MEDIUM AND LOW VOLTAGE FEEDERS, OIL & DRY TYPE TRANSFORMERS, LOW VOLTAGE DISTRIBUTION EQUIPMENT AND SWITCHBOARDS & PERFORM ARC FLASH STUDIES.
- National Aeronautics and Space Administration$15.87M
CONSTRUCTION PROJECT TO UPGRADE THE 22 KV ELECTRICAL DISTRIBUTION SYSTEM. ELECTRICAL INFRASTRUCTURE UPGRADES
- National Aeronautics and Space Administration$15.90M
A-COMPLEX HIGH PRESSURE INDUSTRIAL WATER (HPIW) REFURBISHMENT
- National Aeronautics and Space Administration$4.17M
EMERGENCY EGRESS LIGHTING COMPLIANCE UPGRADE. THIS PROJECT WILL REPLACE MSFC EMERGENCY LIGHTING SYSTEMS BRINGING THEM UP TO THE CURRENT NASA AND INDUSTRY CODES AND WILL FOCUS ON MSFC FACILITIES WITH HIGHEST RISK.
- National Aeronautics and Space Administration$9.02M
UTILITY TUNNEL REPAIRS, PHASE 1
- National Aeronautics and Space Administration$4.47M
THIS PROJECT REPLACES AND UPDATES MSFC UTILITY CONTROL SYSTEM (UCS), WHICH SUPPORTS SITE-WIDE CAPABILITIES AND OPERATIONS.
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.