Federal contractor · public award history
ADVANCED COOLING TECHNOLOGIES INC
DBA ADVANCED COOLING TECHNOLOGIES INC
Parent: ADVANCED COOLING TECHNOLOGIES INC Z8KVZV3DR7J4
- Awards we know about
- 12
- Typical size
- $869,972
- Middle of their public awards
- Dollars on those awards
- $14.68M
Most of their awards we can see fall roughly between $339,998 and $902,613.
From official USAspending contract records — not a capability rating, past-performance score, or recommendation to team or bid.
Awarding agencies
- National Aeronautics and Space Administration (12)
Industries & product codes
Award history
- National Aeronautics and Space Administration$149,992
SBIR 1 FREEZE TOLERANT WATER HEAT PIPE AND THERMAL SWITCH
- National Aeronautics and Space Administration$149,992
SBIR I MULTI-VCHP (VARIABLE CONDENSER HEAT PIPE) RADIATOR
- National Aeronautics and Space Administration$399,998
SBIR PHASE III - HIGH TEMPERATURE HEAT PIPE RADIATORS FOR SPACE APPLICATIONS
- National Aeronautics and Space Administration$899,990
SBIR PHASE II - ENHANCED MOTOR PERFORMANCE VIA TWO-PHASE THERMAL MANAGEMENT
- National Aeronautics and Space Administration$7.60M
ROLLOUT PURGE UNITS AND ASSOCIATED TRAINING AND ACCESSORIES
- National Aeronautics and Space Administration$910,482
PHASE II
- National Aeronautics and Space Administration$869,991
FY23 SBIR PHASE II-HOT END THERMAL MANAGEMENT SYSTEM FOR NUCLEAR ELECTRIC PROPULSION
- National Aeronautics and Space Administration$869,999
PHASE II
- National Aeronautics and Space Administration$1.02M
THE FAST GROWING SPACE INDUSTRY RESULTS IN INCREASING DEMAND FOR THERMAL CONTROL SYSTEMS LOOP HEAT PIPES LHP ARE A COMMONLY UTILIZED DEVICE FOR SPACECRAFT DUE TO HIGH EFFICIENCY AND FLEXIBILITY ABILITY TO INTEGRATE WITH DEPLOYABLE RADIATOR
- National Aeronautics and Space Administration$159,999
3D PRINTED LOOP HEAT PIPE ENABLING HIGH POWER DENSITY SPACE APPLICATIONS
- National Aeronautics and Space Administration$769,998
E014042 PHASE II ADVANCED COOLING SYSTEM FOR MODULAR POWER ELECTRONICS
- National Aeronautics and Space Administration$869,952
PHASE II
Intelligence only — not legal advice, not a past-performance evaluation, and not a recommendation to team or bid. Verify on USAspending and SAM.gov.