Federal Acquisition Regulation

Ordering

FAR 16.505
(a) General . (1) In general, the contracting officer does not synopsize orders under indefinite-delivery contracts; except see Ordering (FAR 16.505) (a)(4) and (11), and Ordering (FAR 16.505) (b)(2)(ii)(D). (2) Individual orders shall clearly describe all services to be performed or supplies to be delivered so the full cost or price for the performance of the work can be established when the order is placed. Orders shall be within the scope, issued within the period of performance, and be within the maximum value of the contract. (3) Performance-based acquisition methods must be used to the maximum extent practicable, if the contract or order is for services (see Policy (FAR 37.102) (a) and subpart Performance-Based Acquisition (FAR 37.6) ). (4) The following requirements apply when procuring items peculiar to one manufacturer: (i) The contracting officer must justify restricting consideration to an item peculiar to one manufacturer (e.g. , a particular brand-name, product, or a feature of a product that is peculiar to one manufacturer). A brand-name item, even if available on more than one contract, is an item peculiar to one manufacturer. Brand-name specifications shall not be used unless the particular brand-name, product, or feature is essential to the Government’s requirements and market research indicates other companies’ similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency’s needs. (ii) Requirements for use of items peculiar to one manufacturer shall be justified and approved using the format(s) and requirements from paragraphs (b)(2)(ii)(A), (B), and (C) of this section, modified to show the brand-name justification. A justification is required unless a justification covering the requirements in the order was previously approved for the contract in accordance with 6.302-1 (c) or unless the base contract is a single-award contract awarded under full and open competition. Justifications for the use of brand-name specifications must be completed and approved at the time the requirement for a brand-name is determined. (iii) (A) For an order in excess of $40,000, the contracting officer shall— (1) Post the justification and supporting documentation on the agency website used (if any) to solicit offers for orders under the contract; or (2) Provide the justification and supporting documentation along with the solicitation to all contract awardees. (B) The justifications for brand-name acquisitions may apply to the portion of the acquisition requiring the brand-name item. If the justification is to cover only the portion of the acquisition which is brand-name, then it should so state; the approval level requirements will then only apply to that portion. (C) The requirements in paragraph (a)(4)(iii)(A) of this section do not apply when disclosure would compromise the national security (e.g. , would result in disclosure of classified information) or create other security risks. (D) The justification is subject to the screening requirement in paragraph (b)(2)(ii)(D)(4 ) of this section. (5) When acquiring information technology and related services, consider the use of modular contracting to reduce program risk (see Modular contracting (FAR 39.103) (a)). (6) Orders may be placed by using any medium specified in the contract. (7) Orders placed under indefinite-delivery contracts must contain the following information: (i) Date of order. (ii) Contract number and order number. (iii) For supplies and services, line item number, subline item number (if applicable), description, quantity, and unit price or estimated cost and fee (as applicable). The corresponding line item number and subline item number from the base contract shall also be included. (iv) Delivery or performance schedule. (v) Place of delivery or performance (including consignee). (vi) Any packaging, packing, and shipping instructions. (vii) Accounting and appropriation data. (viii) Method of payment and payment office, if not specified in the contract (see Solicitation provision and contract clauses (FAR 32.1110) (e)). (ix) North American Industry Classification System code (see Small business size standards and North American Industry Classification System codes (FAR 19.102) (b)(3)). (8) Orders placed under a task-order contract or delivery-order contract awarded by another agency (i.e., a Governmentwide acquisition contract, or multi-agency contract)— (i) Are not exempt from the development of acquisition plans (see subpart Acquisition Plans (FAR 7.1) ), and an information technology acquisition strategy (see part 39); (ii) May not be used to circumvent conditions and limitations imposed on the use of funds (e.g., 31 U.S.C. 1501(a)(1) ); and (iii) Shall comply with all FAR requirements for a consolidated or bundled contract when the order meets the definition at Definitions (FAR 2.101) of "consolidation" or "bundling". (9) In accordance with section 1427(b) of Public Law 108-136 (40 U.S.C. 1103 note), orders placed under multi-agency contracts for services that substantially or to a dominant extent specify performance of architect-engineer services, as defined in Definitions (FAR 2.101) , shall— (i) Be awarded using the procedures at subpart Architect-Engineer Services (FAR 36.6) ; and (ii) Require the direct supervision of a professional architect or engineer licensed, registered or certified in the State, Federal District, or outlying area, in which the services are to be performed. (10) (i) No protest under subpart Protests (FAR 33.1) is authorized in connection with the issuance or proposed issuance of an order under a task-order contract or delivery-order contract, except— (A) A protest on the grounds that the order increases the scope, period, or maximum value of the contract; or (B) (1) For agencies other than DoD, NASA, and the Coast Guard, a protest of an order valued in excess of $10 million (41 U.S.C. 4106(f) ); or (2) For DoD, NASA, or the Coast Guard, a protest of an order valued in excess of $25 million (10 U.S.C. 3406(f) ). (ii) Protests of orders in excess of the thresholds stated in Ordering (FAR 16.505) (a)(10)(i)(B) may only be filed with the Government Accountability Office, in accordance with the procedures at Protests to GAO (FAR 33.104) . (iii) For protests of small business size status for set-aside orders, see Protesting a small business representation or rerepresentation (FAR 19.302). (11) Publicize orders funded in whole or in part by the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) as follows: (i) Notices of proposed orders shall follow the procedures in Publicizing preaward (FAR 5.704) for posting orders. (ii) Award notices for orders shall follow the procedures in Publicizing postaward (FAR 5.705) . (12) When using the Governmentwide commercial purchase card as a method of payment, orders at or below the micro-purchase threshold are exempt from verification in the System for Award Management as to whether the contractor has a delinquent debt subject to collection under the Treasury Offset Program (TOP). (b) Orders under multiple-award contracts— (1) Fair opportunity . (i) The contracting officer must provide each awardee a fair opportunity to be considered for each order exceeding the micro-purchase threshold issued under multiple delivery-order contracts or multiple task-order contracts, except— (A) As provided for in paragraph (b)(2) of this section; or (B) Orders issued under Orders under multiple-award contracts (FAR 19.504) (c)(1)(ii). (ii) The contracting officer may exercise broad discretion in developing appropriate order placement procedures. The contracting officer should keep submission requirements to a minimum. Contracting officers may use streamlined procedures, including oral presentations. If the order does not exceed the simplified acquisition threshold, the contracting officer need not contact each of the multiple awardees under the contract before selecting an order awardee if the contracting officer has information available to ensure that each awardee is provided a fair opportunity to be considered for each order. The competition requirements in part 6 and the policies in subpart Source Selection (FAR 15.3) do not apply to the ordering process. However, the contracting officer shall— (A) Develop placement procedures that will provide each awardee a fair opportunity to be considered for each order and that reflect the requirement and other aspects of the contracting environment; (B) Not use any method (such as allocation or designation of any preferred awardee) that would not result in fair consideration being given to all awardees prior to placing each order; (C) Tailor the procedures to each acquisition; (D) Include the procedures in the solicitation and the contract; (E) Consider price or cost under each order as one of the factors in the selection decision; (F) Except for DoD, ensure the criteria at 15.101-2 (c)(1)-(5) are met when using the lowest price technically acceptable source selection process; and (G) Except for DoD, avoid using the lowest price technically acceptable source selection process to acquire certain supplies and services in accordance with 15.101-2 (d). (iii) Orders exceeding the simplified acquisition threshold. (A) Each order exceeding the simplified acquisition threshold shall be placed on a competitive basis in accordance with paragraph (b)(1)(iii)(B) of this section, unless supported by a written determination that one of the circumstances described at Ordering (FAR 16.505) (b)(2)(i) applies to the order and the requirement is waived on the basis of a justification that is prepared in accordance with Ordering (FAR 16.505) (b)(2)(ii)(B); (B) The contracting officer shall— (1) Provide a fair notice of the intent to make a purchase, including a clear description of the supplies to be delivered or the services to be performed and the basis upon which the selection will be made to all contractors offering the required supplies or services under the multiple-award contract; and (2) Afford all contractors responding to the notice a fair opportunity to submit an offer and have that offer fairly considered. (iv) Orders exceeding $7.5 million . For task or delivery orders in excess of $7.5 million, the requirement to provide all awardees a fair opportunity to be considered for each order shall include, at a minimum— (A) A notice of the task or delivery order that includes a clear statement of the agency’s requirements; (B) A reasonable response period; (C) Disclosure of the significant factors and subfactors, including cost or price, that the agency expects to consider in evaluating proposals, and their relative importance; (D) Where award is made on a best value basis, a written statement documenting the basis for award and the relative importance of quality and price or cost factors; and (E) An opportunity for a postaward debriefing in accordance with paragraph (b)(6) of this section. (v) The contracting officer should consider the following when developing the procedures: (A) (1) Past performance on earlier orders under the contract, including quality, timeliness and cost control. (2) Potential impact on other orders placed with the contractor. (3) Minimum order requirements. (4) The amount of time contractors need to make informed business decisions on whether to respond to potential orders. (5) Whether contractors could be encouraged to respond to potential orders by outreach efforts to promote exchanges of information, such as— (i) Seeking comments from two or more contractors on draft statements of work; (ii) Using a multiphased approach when effort required to respond to a potential order may be resource intensive (e.g., requirements are complex or need continued development), where all contractors are initially considered on price considerations (e.g., rough estimates), and other considerations as appropriate (e.g., proposed conceptual approach, past performance). The contractors most likely to submit the highest value solutions are then selected for one-on-one sessions with the Government to increase their understanding of the requirements, provide suggestions for refining requirements, and discuss risk reduction measures. (B) Formal evaluation plans or scoring of quotes or offers are not required. (2) Exceptions to the fair opportunity process . (i) The contracting officer shall give every awardee a fair opportunity to be considered for a delivery order or task order exceeding the micro-purchase threshold unless one of the following statutory exceptions applies: (A) The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays. (B) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized. (C) The order must be issued on a sole-source basis in the interest of economy and efficiency because it is a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order. (D) It is necessary to place an order to satisfy a minimum guarantee. (E) For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source. (F) In accordance with section 1331 of Public Law 111-240 (15 U.S.C. 644(r) ), contracting officers may, at their discretion, set aside orders for any of the small business concerns identified in Scope of part (FAR 19.000) (a)(3). When setting aside orders for small business concerns, the specific small business program eligibility requirements identified in part 19 apply. (G) For DoD, NASA, and the Coast Guard, the order satisfies one of the exceptions permitting the use of other than full and open competition listed in Circumstances permitting other than full and open competition (FAR 6.302) (10 U.S.C. 3406(c)(5) ). The public interest exception shall not be used unless Congress is notified in accordance with 10 U.S.C. 3204(a)(7) . (ii) The justification for an exception to fair opportunity shall be in writing as specified in paragraph (b)(2)(ii)(A) or (B) of this section. No justification is needed for the exception described in paragraph (b)(2)(i)(F) of this section. (A) Orders exceeding the micro-purchase threshold, but not exceeding the simplified acquisition threshold . The contracting officer shall document the basis for using an exception to the fair opportunity process. If the contracting officer uses the logical follow-on exception, the rationale shall describe why the relationship between the initial order and the follow-on is logical (e.g. , in terms of scope, period of performance, or value). (B) Orders exceeding the simplified acquisition threshold. As a minimum, each justification shall include the following information and be approved in accordance with paragraph (b)(2)(ii)(C) of this section: (1) Identification of the agency and the contracting activity, and specific identification of the document as a "Justification for an Exception to Fair Opportunity." (2) Nature and/or description of the action being approved. (3) A description of the supplies or services required to meet the agency’s needs (including the estimated value). (4) Identification of the exception to fair opportunity (see Ordering (FAR 16.505) (b)(2)) and the supporting rationale, including a demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the exception cited. If the contracting officer uses the logical follow-on exception, the rationale shall describe why the relationship between the initial order and the follow-on is logical (e.g. , in terms of scope, period of performance, or value). (5) A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable. (6) Any other facts supporting the justification. (7) A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. (8) The contracting officer’s certification that the justification is accurate and complete to the best of the contracting officer’s knowledge and belief. (9) Evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g. , verifying the Government’s minimum needs or requirements or other rationale for an exception to fair opportunity) and which
Record identifier16.505