Sources Sought Notice for Sole Source Market Research for the PN096278 FY26MCA Electrical Switching Station-North project at Watervliet Arsenal (WVA), New York.
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Jun 11, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 11, 2026, 8:00 PM EDT
- Posted
- May 27, 2026
- Solicitation
- W912DS26S0033
- Set-aside
- None listed
- PSC
- —
- Place of performance
- Watervliet, NY, USA
- Contracting office
- W2SD ENDIST NEW YORK · NEW YORK · NY
- Source
- SAM.gov · updated Jun 1, 2026
Description
The New York District plans to solicit and award a construction contract for subject project in FY26. The scope of the project is: To construct a generator connection terminal to provide backup power to the Arsenal in the event of a long-term power outage from the facility�s Main Substation. The primary scope includes electric manholes, duct bank, grounding cable, fencing, switchgear, transfer switches, cables, generator procurement and installation, splices and connections. Supporting facilities include paving, walks, curbs, gutters, and utilities testing and commissioning. This project will construct a switching station capable of feeding 4MW of power into the existing WVA distribution network and constructing a facility capable of 8MW of power generation needed to power the WVA during an emergency loss of power. The facilities will increase the existing switching station capacity from 4MW to the full 8MW needed for powering the installation fully while also providing the means of that power generation. The project also includes the construction of all necessary utility interconnections to bring fuel to the power generation facility and to connect the switching station to the existing electrical distribution network. The installation of controls for the auto start of this power generation and distribution switch are also included in this project. 1. This notification serves three (3) purposes: a. To notify potential bidders of the Government�s intent to solicit a brand name(s) only component for this project. b. To identify potential sources that can provide an equivalent to the brand name only item(s). c. Notification of the Army�s intent to solicit brand name components as described below. 2. The items described below, under summary of requirements, are embedded in the construction project. The contract will be issued as a one-step negotiated procurement. Only the components described below will be sole sourced, if no other sources are identified that can provide an equivalent system. In the event no equivalent sources are found, the brand name only justification will be issued pursuant to FAR Part 6.302-1, Only One Responsible Source. A subsequent market survey will not be published in support of a Justification and Approval for sole sourcing. Supplies of the brand name component will be provided directly to the Contractor(s) and not to the Government. 3. Summary of Requirements: a. Mechanical Controls System The requirement is to sole-source a requirement for brand-name Johnson Controls Inc. (JCI) Metasys components, programming, and engineering modifications to support the installation of the sitewide electrical switching project. The purpose of this acquisition is to integrate new control equipment into the existing-to-remain Building Automation System (BAS) infrastructure. Currently, WVA relies heavily on proprietary JCI Metasys controllers and software to monitor and control facility systems. Utilizing OEM-compatible JCI Metasys equipment is technically necessary to ensure full compatibility with the existing base-wide Metasys server and associated field devices, while following the guidelines outlined in Unified Facilities Guide Specifications (UFGS) 25 10 10. Proprietary control system appliances are required to achieve synchronization of telemetry signals with the remainder of the facility, leveraging the existing Metasys network as the primary communications backbone for remote monitoring and electrical switching commands. After careful review of the necessary project scope, the Government has determined that maintaining compatibility with the existing software infrastructure used for building servicing is essential. Therefore, the decision has been made to continue using the JCI Metasys product line for these new controls. This choice is driven by the strict requirement to ensure seamless integration and operation within the current system without impairing its existing cybersecurity posture or reliability. The Utility Monitoring and Control System (UMCS) modifications must be delivered as a complete, networked architecture that provides real-time, point-to-point telemetry reporting to the local supervisory engines, which in turn report directly to the central Metasys front-end server. Because the existing facility infrastructure is standardized on this platform, utilizing proprietary JCI components is the only way to ensure the uninterrupted, reliable control necessary for this critical mission-support infrastructure 4. Any vendor that wishes to provide an alternate source to the brand names above that is compatible with the above must provide a response with data supporting the claim within 15 business days of this announcement to New York District Corps of Engineering, Contracting Division. This is a market survey and notification of intent only. This is not a request to respond to a solicitation. This requirement will be solicited at a future date.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$465,946
Middle of the pack for similar past awards
Most similar awards fall between $98,040 and $2.23M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1BL HARBERT INTERNATIONAL LLC25 awards$5.86B
- 2CADDELL CONSTRUCTION CO. (DE), LLC13 awards$4.45B
- 3BCCG A JOINT VENTURE8 awards$3.41B
- 4BRASFIELD & GORRIE LLC11 awards$1.87B
- 5WHITING-TURNER CONTRACTING COMPANY, THE32 awards$1.72B
- 6HENSEL PHELPS CONSTRUCTION CO6 awards$1.39B
- 7FISHER SAND & GRAVEL CO4 awards$1.31B
- 8CLARK CONSTRUCTION GROUP LLC3 awards$1.05B
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 13da56d1746f452d9bd6c50806b398aa.