C223--Chilled Water Multiple 3-Way Valve Replacement (VA-26-00019254)
Veterans Affairs, Department of · VETERANS AFFAIRS, DEPARTMENT OF
This notice is not accepting responses (deadline was Feb 4, 2026, 7:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Feb 4, 2026, 7:00 PM EST
- Posted
- Jan 26, 2026
- Solicitation
- 36C24626R0026
- Set-aside
- SDVOSB
- Place of performance
- Salisbury, NC, USA
- Contracting office
- 246-NETWORK CONTRACTING OFFICE 6 (36C246) · HAMPTON · VA
- Source
- SAM.gov · updated May 9, 2026
Description
THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposals, request for quotes, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited. The Department of Veterans Affairs, Network Contracting Office 6 (NCO 6) is conducting market research to identify potential sources for Architect-Engineer services to complete the scope of work below for Chilled Water Multiple 3-way Valve Replacement (Project #659-26-600) located at the W.G. (Bill) Hefner Salisbury VA Medical Center in Salisbury, North Carolina. The proposed NAICS 541330 Engineering Services is applicable to this acquisition; with a size standard of $25.5 Million. The proposed PSC code is C223 Architect and Engineering General- Mechanical Systems. The anticipated Magnitude of Construction is between $1,000,000 and $2,000,000. The anticipated Period of Performance for design is 180 calendar days from the Notice to Proceed with an estimated total contract period of 725 days. Scope of Work The Architect/Engineer (A/E) shall provide design services necessary to furnish: Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As- Built Documentation, and all other related information for Project 659-26-600 Chilled Water Multiple 3-way Valve Replacement. The project replaces the remaining chilled water 3-way valves to 2-way valves at the buildings across the campus and provides DDC controls per each building s controller. An extensive survey will be needed to list what needs to be fixed/corrected to meet current code and Veterans Affairs hospital requirements, as well as to ensure the system functions efficiently. All design will be done according to VA Specifications, Design Guides, Infection Control Guidelines and all applicable codes. The design will be structured to require minimum interruption of space function during construction. All work shall meet National Fire Protection Association (NFPA) / Life Safety Code and comply with all applicable building codes. The work will also comply with all Energy Standards as noted at the end of this document and attached summary PDF VISN6 Energy and Water Requirements for Projects . This will include all Architectural, Structural, Electrical and Mechanical engineering associated with this project. Small Business Requirements For market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of acquisition strategy and set aside requirements if a solicitation becomes available. Pursuant to 38 U.S.C. 8127(d), acquisitions will be set-aside for SDVOSBs or VOSBs, registered in the SBA VetCert database, whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered. Instructions All interested parties should use the attached Sources Sought Questionnaire to respond to this notice and email completed responses to the Contract Specialist, Mark Griffin, at mark.griffin2@va.gov. No telephone inquiries will be accepted. Your response is requested by Thursday, February 05, 2026, at 3PM EST. See attached document: 36C24626R0026. See attached document: Sources Sought Questionnaire - Chilled Water Multiple 3 Way Valve Replacement - 36C24626R0026
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$328,272
Middle of the pack for similar past awards
Most similar awards fall between $221,159 and $596,514
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1PERATON INC.1 award$328.56M
- 2MILLER-REMICK, LLC3 awards$3.20M
- 3DAV ENERGY SOLUTIONS, INC.3 awards$2.52M
- 4SPEES LLC2 awards$1.84M
- 5AKEA DESIGN, INC.1 award$1.39M
- 6TOLAND MIZELL MOLNAR LLC4 awards$993,681
- 7GEO BANCROFT ENGINEERING LLC1 award$823,106
- 8VALHALLA ENGINEERING GROUP, LLC1 award$743,230
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.