Flooring Replacement at Safety Office - Neville Island
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Jul 2, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jul 2, 2025, 8:00 PM EDT
- Posted
- Jun 29, 2025
- Solicitation
- W911WN25QA027
- Set-aside
- Total Small Business
- Place of performance
- —
- Contracting office
- W072 ENDIST PITTSBURGH · PITTSBURGH · PA
- Source
- SAM.gov · updated May 9, 2026
Description
The requirement is to remove existing flooring, evaluate and address the subfloor condition (clean or remove tile as necessary), and apply a Super Poly epoxy coating in accordance with the provided specifications.The contractor shall furnish all necessary labor, materials, equipment, and supervision to perform the refinishing services at the Safety Office located on Neville Island.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$78,709
Middle of the pack for similar past awards
Most similar awards fall between $39,912 and $384,180
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1SENTINEL SERVICES, LLC1 award$1.46M
- 2CONSTRUCTURE INC1 award$384,180
- 3MISCELLANEOUS FOREIGN AWARDEES2 awards$97,806
- 4SUPERIOR STRUCTURES LLC1 award$39,912
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 1c968ba3095f4568b81821a224d8e9ab.