59--LEAD ASSEMBLY,ELECT
Dept of Defense · DEPT OF THE NAVY
- Response deadline
- Jul 9, 2026, 8:00 PM EDT
- Posted
- Jun 21, 2026
- Solicitation
- N0010426RFC57
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH · MECHANICSBURG · PA
- Source
- SAM.gov · updated Jun 22, 2026
Description
CONTACT INFORMATION|4|N743.49|WVE|771-229-0573|benjamin.t.spangler.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |N/A|TBD|N00104|TBD|N39040 - Certifications, S4306A - Material |N50286|TBD|133.2|N/A|N/A|N39040 - Certifications |N/A |N/A|SEE DD FORM 1423 |PORT_PTNH_WAWF_NOTIFICATION@NAVY.MIL BENJAMIN.T.SPANGLER.CIV@US.NAVY.MIL| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| SMALL BUSINESS SUBCONTRACTING PLAN (DEV 2026-O0037)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|One|0001AC|30|N39040|270|X|| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| PERFORMANCE-BASED PAYMENTS (APR 2012)|1|| LIST OF AWARD ATTACHMENTS|5|||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (DEV 2026-O0006)(FEB 2026)|1|| INSTRUCTIONS TO OFFERORS -- COMPETITIVE ACQUISITION (DEV 2026-O0048)(MAR 2026)|2||| ALTERATIONS IN SOLICITATION (APR 1984)|3|||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|X|$59K|| This amendment is issued to extend the closing date. \ 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. Portsmouth NSY's DODAAC has changed from N00102 to N50286. Any reference toN00102 within this order should be updated to N50286. 3. The following proposed delivery schedule applies: Submission of Certification Data CDRLs will be on or before 20 days prior toscheduled delivery. FAT REPORT 180 DAYS AFTER APPROVAL OF PR LT APPROVAL OF FAT REPORT 60 DAYS AFTER RECEIPT PNSY review/acceptance of Certification CDRLs 6 workingdays after receipt of Certification DD 1423 CDRLs. Final delivery of materialwill be on or before 365 days after effective date of the resulting contract. 4. Any contract awarded as a result of this solicitation will be "DO" rated order; "DO" rated order certified for national defense use under the DefensePriorities and Allocations System (DPAS). 5. If drawings are included in the solicitation, access needs to be requested on the individual solicitation page on Contracts Opportunities on theGovernment's SAM.gov website. After requesting access, send an email to thePrimary POC listed on the solicitation. 6. This solicitation requires First Article Testing. See FAR 52.209-4 First Article Approval - Government Testing 7. The complete RFP package must be signed and returned prior to the closing date. Emailed or faxed proposals are acceptable. NECO quotes will NOT beaccepted and will be determined non-responsive. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=CPG1022 |96169| F| |D|0001 | F|49998|0030132 DRAWING DATA=CPG1022 |96169| F| |D|0002 | F|49998|0021064 DRAWING DATA=CPG1022 |96169| F| |D|0003 | F|49998|0022286 DRAWING DATA=CPG1022 |96169| F| |D|0004 | F|49998|0021419 DRAWING DATA=CPG1022 |96169| F| |D|0005 | F|49998|0022582 DRAWING DATA=CPG1022 |96169| F| |D|0006 | F|49998|0019811 DRAWING DATA=CPG1022 |96169| F| |D|0007 | F|49998|0022652 DRAWING DATA=CPG1022 |96169| F| |D|0008 | F|49998|0011258 DRAWING DATA=CPG1022 |96169| F| |D|0009 | F|49998|0023824 DRAWING DATA=CPG1022 |96169| F| |D|0010 | F|49998|0020856 DRAWING DATA=CPG1022 |96169| F| |D|0011 | F|49998|0014477 DRAWING DATA=CPG1022 |96169| F| |D|0012 | F|49998|0008560 DRAWING DATA=CPG1022 |96169| F| |D|0013 | F|49998|0018011 DRAWING DATA=CPG1022 |96169| F| |D|0014 | F|49998|0025103 DRAWING DATA=CPG1022 |96169| F| |D|0015 | F|49998|0023546 DRAWING DATA=CPG1022 |96169| F| |D|0016 | F|49998|0020347 DRAWING DATA=CPG1022 |96169| F| |D|0017 | F|49998|0025199 DRAWING DATA=CPG1022 |96169| F| |D|0018 | F|49998|0045572 DRAWING DATA=CPG1022 |96169| F| |D|0019 | F|49998|0040276 DRAWING DATA=CPG1022 |96169| F| |D|0020 | F|49998|0039212 DRAWING DATA=CPG1022 |96169| F| |D|0021 | F|49998|0030139 DRAWING DATA=CPG1022 |96169| F| |D|0022 | F|49998|0037282 DRAWING DATA=CPG1022 |96169| F| |D|0023 | F|49998|0033419 DRAWING DATA=CPG1022 |96169| F| |D|0024 | F|49998|0046612 DRAWING DATA=CPG1022 |96169| F| |D|0025 | F|49998|0042207 DRAWING DATA=CPG1022 |96169| F| |D|0026 | F|49998|0045002 DRAWING DATA=CPG1022 |96169| F| |D|0027 | F|49998|0009713 DRAWING DATA=CPG1022 |96169| F| |D|0028 | F|49998|0046354 DRAWING DATA=CPG1022 |96169| F| |D|0029 | F|49998|0005500 DRAWING DATA=CPG1022 |96169| F| |D|0030 | F|49998|0016659 DRAWING DATA=CPG1022 |96169| F| |D|0031 | F|49998|0041132 DRAWING DATA=CPG1022 |96169| F| |D|0032 | F|49998|0014803 DRAWING DATA=CPG1022 |96169| F| |D|0033 | F|49998|0013312 DRAWING DATA=CPG1022 |96169| F| |D|0034 | F|49998|0030085 DRAWING DATA=CPG1022 |96169| F| |D|0035 | F|49998|0031585 DRAWING DATA=CPG1022 |96169| F| |D|0036 | F|49998|0031527 DRAWING DATA=CPG1022 |96169| F| |D|0037 | F|49998|0012406 DRAWING DATA=CPG1022 |96169| F| |D|0038 | F|49998|0046896 DRAWING DATA=CPG1022 |96169| F| |D|0039 | F|49998|0010039 DRAWING DATA=CPG1022 |96169| F| |D|0040 | F|49998|0056377 DRAWING DATA=CPG1022 |96169| F| |D|0041 | F|49998|0005432 DRAWING DATA=CPG1022 |96169| F| |D|0042 | F|49998|0048047 DRAWING DATA=CPG1022 |96169| F| |D|0043 | F|49998|0052300 DRAWING DATA=CPG1022 |96169| F| |D|0044 | F|49998|0024276 DRAWING DATA=CPG1022 |96169| F| |D|0045 | F|49998|0034480 DRAWING DATA=CPG1022 |96169| F| |D|0046 | F|49998|0026803 DRAWING DATA=CPG1022 |96169| F| |D|0047 | F|49998|0012965 DRAWING DATA=CPG1022 |96169| F| |D|0048 | F|49998|0013581 DRAWING DATA=CPG1022 |96169| F| |D|0049 | F|49998|0010520 DRAWING DATA=CPG1022 |96169| F| |D|0050 | F|49998|0010755 DRAWING DATA=CPG1022 |96169| F| |D|0051 | F|49998|0018605 DRAWING DATA=CPG1022 |96169| F| |D|0052 | F|49998|0009701 DRAWING DATA=CPG1022 |96169| F| |D|0053 | F|49998|0024802 DRAWING DATA=CPG1022 |96169| F| |D|0054 | F|49998|0032131 DRAWING DATA=CPG1022 |96169| F| |D|0055 | F|49998|0014331 DRAWING DATA=CPG1022 |96169| F| |D|0056 | F|49998|0010587 DRAWING DATA=CPG1022 |96169| F| |D|0057 | F|49998|0015026 DRAWING DATA=CPG1022-1 |96169| D| |D|0000.A | D|49998|0074948 DRAWING DATA=CPG1022-1 |96169| D| |D|0000.B | C|49998|0129832 DRAWING DATA=CPG1022-1 |96169| D| |D|0000.C | D|49998|0016731 DRAWING DATA=CPG1022-1 |96169| D| |D|0001 | D|49998|0095662 DRAWING DATA=CPG1022-1 |96169| D| |D|0002 | C|49998|0048488 DRAWING DATA=CPG1022-1 |96169| D| |D|0003 | C|49998|0049407 DRAWING DATA=CPG1022-1 |96169| D| |D|0004 | D|49998|0061828 DRAWING DATA=CPG1022-1 |96169| D| |D|0005 | B|49998|0017369 DRAWING DATA=CPG1022-1 |96169| D| |D|0006 | D|49998|0024738 DRAWING DATA=CPG1022-1 |96169| D| |D|0007 | B|49998|0020905 DRAWING DATA=CPG1022-1 |96169| D| |D|0008 | D|49998|0019097 DRAWING DATA=CPG1022-1 |96169| D| |D|0009 | C|49998|0017763 DRAWING DATA=CPG1022-1 |96169| D| |D|0010 | D|49998|0055696 DRAWING DATA=CPG1022-1 |96169| D| |D|0011 | B|49998|0015906 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-915 |0081| | |020822|A| |02| DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=MIL-STD-2132 | | |D |080310|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 Manufacture and Design - The item furnished under this contract/purchase order must meet the requirements as specified in CPG 1022, except as amplified or modified herein. CPG 1022 ordering data information is provided below. (a) Penetrator, Electrical, Trident Submarine; CPG 1022. (b) ;Hull Penetrator Assembly for 18 Twisted Pair Cables, CPG 1022/1; (c) Level of preservation, packaging, packing, and marking must be as specified elsewhere in the contract/purchase order. (d) Length of outboard cable - ;Minimum of 100 Feet per MIL-DTL-915/81 (Type 1PR-A20E); 3.2 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required. 3.3 ;The FAT sample(s) must not be delivered against the contract quantity.; 3.4 ;Paragraphs 4.1 and 4.1.1 of CPG 1022 do not apply.; 3.5 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Body, Hull Penetrator CPG 1022/1-001 S1; Body Cap, Hull Penetrator CPG 1022/1-001 S2; Washer CPG 1022/1-006 and Nut CPG 1022/1-005; Material - ;QQ-N-286, Form 2, Annealed and Age Hardened or QQ-N-286, Form 7, Annealed and Age Hardened; 3.6 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Attribute - Time Temperature plots and certified calibration records of furnace temperature measuring devices Item - ;Body, Hull Penetrator CPG 1022/1-001 S1; Body Cap, Hull Penetrator CPG 1022/1-001 S2; Washer CPG 1022/1-006 and Nut CPG 1022/1-005; Performance - ;When required by CPG 1022, paragraph 3.3.1.2; Test - Quality Conformance/Compliance Inspection Item - ;Each Hull Penetrator Assembly; Performance - ;CPG 1022 paragraph 4.5; Acceptance - ;CPG 1022 paragraph 4.5; ;The hold time for the Hydrostatic Pressure Test Step 9 must be 2 hours for Quality Conformance Inspection Tests.; Attribute - Annealing and Age Hardening Item - ;Body, Hull Penetrator CPG 1022/1-001 S1; Body Cap, Hull Penetrator CPG 1022/1-001 S2; Washer CPG 1022/1-006 and Nut CPG 1022/1-005; Performance - QQ-N-286 Test - ;Dye Penetrant Inspection; Item - ;Body, Hull Penetrator CPG 1022/1-001 S1; Body Cap, Hull Penetrator CPG 1022/1-001 S2; Washer CPG 1022/1-006 and Nut CPG 1022/1-005; Performance - T9074-AS-GIB-010/271 Acceptance - MIL-STD-2035 Test - Ultrasonic Inspection on Starting Material Item - ;All Items requiring certification made from QQ-N-286 with a diameter or minimum distance between parallel surfaces of 4 inches or greater of the starting material, or when required by a drawing or specification invoked elsewhere in this contract; Performance - T9074-AS-GIB-010/271 or MIL-STD-2132, and QQ-N-286 Acceptance - QQ-N-286 3.7 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.8 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.8.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.8.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.8.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.9 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories: Huntington Alloys, a Special Metals Company Attn: Bill Bolenr 3200 Riverside Drive Huntington, WV 257059 Phone: (304) 526-5889 FAX: (304) 526-5973 Metallurgical Consultants, Inc. Attn: W. M. Buehler 4820 Caroline PO Box 88046 Houston, TX 77288-0046 Phone: (713) 526-6351 FAX: (713) 526-2964 Naval Surface Warfare Center, Carderock Division Attn: Eric Focht Code 614 9500 Macarthur Blvd West Bethesda, MD 20817-5700 Phone: (301) 227-5032 FAX: (301) 227-5576 Teledyne Allvac Attn: Dr. W. D. Cao 2020 Ashcraft Ave. Monroe, NC 28110 Phone: (704) 289-4511 FAX: (704) 289-4269 Westmoreland Mechanical Testing and Research Inc. Attn: Andrew Wisniewski P.O. Box 388 Youngstown, PA 15696-0388 Mannesmann Rohrenwerke Mannesmann Forschungsinstitut (MFI) Attn: Dr. Weiss Postfach 251160 47251 Duisburg Germany Phone: 011-49-0203-9993194 FAX: 011-49-0203-9994415 ThyssenKrupp VDM USA, Inc. Attn: D. C. Agarwal 11210 Steeplecrest Drive, Suite 120 Houston, TX 77065-4939 Phone: (281) 955-6683 3.11 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.12 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.13 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing, personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Repair welding is not permitted on ;on QQ-N-286 material; . Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.14 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.14.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.14.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.14.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.15 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.16 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.16.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.17 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.18 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.18.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.18.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.18.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.18.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.18.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.18.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.18.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.18.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.18.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.18.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.18.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified thateach LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.18.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.19 First Article Test/Inspection (Government) - ;Destructive; - The Contractor shall deliver ;One (1) each Penetrator Assembly; unit(s) to ;Receiving Officer Portsmouth Naval Shipyard, Building 240, Code 270. (207-438-5445) Kittery Maine, 03904; for First Article Tests in accordance with the ;requirements of CPG 1022, paragraph 4.4, except Underwater Explosion Testing is not required; . 3.20 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.20.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.20.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.20.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.20.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.20.5 Any changes made b...
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Not enough similar awards to show a range yet
Fewer than five matching public awards are in our index for this lane — not enough to show a fair range.
We looked for: Same industry code (335931) · Same product/service code (5995) · Prime contracts (not umbrella IDVs)
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 1d14b16d980b477695c2783b95d7744f.