Combined Project-Billings Cellblock refresh, Bozeman Wall addition, Bozeman Freezer HVAC
General Services Administration · PUBLIC BUILDINGS SERVICE
This notice is not accepting responses (deadline was Apr 29, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Apr 29, 2026, 8:00 PM EDT
- Posted
- Mar 30, 2026
- Solicitation
- 47PD5526R0018
- Set-aside
- Total Small Business
- Place of performance
- Bozeman, MT, USA
- Contracting office
- PBS PROJECT DELIVERY WEST - BRANCH E · Washington · DC
- Source
- SAM.gov · updated May 9, 2026
Description
Billings USMS - Cellblock Refresh Stainless Steel Restoration: Remove scratches from stainless steel benches and walls in: Contractor/USMS/GSA walk-through required to verify exact damage locations Painting Bozeman FSA - Office Build-Out Build new wall with metal studs Install door and frame to match existing (type, size, color) Extend wall to deck above Install matching baseboard on new wall Add electrical receptacles if required by code Repair/replace carpet as needed Paint entire room with low VOC paint to match existingRepair affected ceiling grid Relocate fire sprinklers per code Move HVAC ceiling penetrations as needed Bozeman FWS - Freezer HVAC Install heat removal system for ultra-low temperature freezers Maintain room temperature between 64.4�F to 89.6�F per equipment specifications Solution Options: New exhaust system with fresh air supply duct, OR Ductless split-system AC unit with fresh air supply Contractor to investigate and propose solution with pricing GENERAL REQUIREMENTS Provide all labor, materials, equipment, and supervision Comply with all applicable codes and standards Submit detailed cost breakdown and proposed solutions Maintain OSHA and GSA safety standards Coordinate access during business hours HSPD-12 badge required
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$199,982
Middle of the pack for similar past awards
Most similar awards fall between $46,323 and $987,833
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1WHITING-TURNER CONTRACTING COMPANY, THE7 awards$330.83M
- 2TURNER CONSTRUCTION COMPANY4 awards$132.27M
- 3BRASFIELD & GORRIE LLC2 awards$129.07M
- 4J. E. DUNN CONSTRUCTION COMPANY1 award$106.43M
- 5ROSS GROUP CONSTRUCTION CORPORATION, LLC4 awards$83.74M
- 6INTEGRATED CONSTRUCTION ENTERPRISES INC14 awards$77.08M
- 7JOHN C. GRIMBERG CO., INC.1 award$52.83M
- 8THE ROBINS & MORTON GROUP1 award$48.81M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.