Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Jul 2, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jul 2, 2026, 8:00 PM EDT
- Posted
- Jun 17, 2026
- Solicitation
- PAN25P04540
- Set-aside
- No Set aside used
- Place of performance
- Ilwaco, WA, USA
- Contracting office
- W071 ENDIST PORTLAND · PORTLAND · OR
- Source
- SAM.gov · updated Jun 18, 2026
Description
The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This PRESOLICITATION announcement is for the Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2. Project Details and Background. The MCR federal navigation project is situated at the border between Washington and Oregon, where the Columbia River meets the Pacific Ocean. Deep-draft navigation through the MCR is facilitated by three primary navigation structures�North Jetty, South Jetty, and Jetty A�with a combined authorized length of 10.2 miles. The North Jetty has an authorized length of 2.5 miles extending to Station 130+00; however, it has not been constructed to its full authorized length. The initial construction of the North Jetty concluded at approximately Station 122+00, resulting in a constructed length of approximately 2.3 miles. This jetty was the second of the three to be constructed and was completed in 1917. Subsequent repairs and rehabilitations along various sections of the North Jetty were carried out in 1939, 1965, 2005, 2015, and 2019. Both initial construction and repairs utilized stone with a minimum density ranging from 167 to 180 pounds per cubic foot (pcf). The side slopes of the jetty vary between 1:1.25 and 1:2 (vertical: horizontal), with an average crest elevation of 25 ft msl. Since construction, a total of 3,569,030 tons of armor stone have been placed. Project Scope. The Mouth of the Columbia River (MCR) North Jetty is located at the southwest corner of Washington State near Ilwaco, WA. Access to the north jetty is from N Head Rd and Cape Disappointment State Park. Mandatory work for MCR North Jetty Expedited Repairs includes toe, side slope, and crest repair construction above 0 feet NAVD88 elevation along approximately 1,300 feet of the jetty trunk primarily on the ocean side. These sections will be repaired and reconstructed to a design crest width of 30 feet, side slopes of 1V:1.5H and a crest elevation of +25 feet NAVD88. The estimated stone volume required for the repairs is approximately 16,700 cubic yards with an approximate minimum stone densities of 180 pounds per cubic foot. Expected stone size is between 20-40 tons each. Approximately 60% of the overall project is mandatory work. A jetty crest haul road on top of the jetty must be constructed and staging area developed to store the large quantity of jetty armor stone. Stone production and delivery via land-based methods to the north jetty site and stone placement are expected to occur in calendar year 2027, and potentially 2028, if necessary. Repairs will primarily be completed by two methods, 1) standard repair, which requires re-working adjacent relic stone to facilitate the proper placement and interlock of new stone and 2) reconstruction, which requires the contractor to recycle existing jetty armor and re-establish proper orientation and interlock of these stones. The Government anticipates that reconstruction will contribute to a need for some additional armor stone as the existing jetty volume will be consolidated through the reconstruction effort. Thus reconstruction will also include the placement of new jetty armor stone. The Contractor should not expect to place jetty armor stone outside of the favorable work season between the months of November and April. Marine weather and oceanographic conditions at The Mouth of the Columbia River between November and April, and even occasionally through the favorable work season, can be extremely dangerous and the coastal environment (waves, wind, rain) is generally too dangerous for conducting marine construction activities such as stone placement at exposed locations such as the jetty trunk and head. Optional work includes repairs to 2,750 feet of jetty trunk to a crest width of 30 feet, side slopes of 1V:2H, and a crest elevation of +24.5 feet NAVD88. The estimated stone volume for the optional repairs is 8,500 cubic yards with a minimum stone density of approximately 175 pounds per cubic foot. Expected stone size is between 15-40 tons each. Anticipated Construction Schedule: CENWP intends to advertise in July 2026 and award in September 2026 with estimated construction completion by the end of calendar year 2028. Estimated Construction Cost (ECC): The current ECC is between $25,000,000.00 and $100,000,000.00. Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract.. Anticipated Source Selection Process: The expected method to determine the best value to the government is a full and open competition via Invitation for Bid. Bid Procedures: The solicitation will be posted on SAM.GOV website once it is issued. Plans and Specifications: The Plans and Specifications will also be posted on beta.SAM.gov website once it is issued. System for Award Management (SAM): Offerors must register in the SAM at: https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award. Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 1 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract. THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV IN JULY 2026. THIS NOTICE IS NOT AN INVITATION FOR BIDS, AND ANY BIDS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$1.83M
Middle of the pack for similar past awards
Most similar awards fall between $317,400 and $6.69M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1NW CONSTRUCTION, INC5 awards$501.93M
- 2KIEWIT INFRASTRUCTURE WEST CO.1 award$217.24M
- 3BWI TPC, A JOINT VENTURE1 award$186.81M
- 4TECH2 SOLUTIONS10 awards$180.38M
- 5APOGEE GROUP, LLC7 awards$170.82M
- 6GARCO CONSTRUCTION, INC.2 awards$143.39M
- 7AMES FEDERAL CONTRACTING GROUP LLC1 award$112.10M
- 8KREW HEAVY CIVIL LLC1 award$107.34M
Recent examples
A few of the newest similar awards in our index.
- KIEWIT INFRASTRUCTURE SOUTH COSep 30, 2025Department of State$16.60MSource
- VEYKA INSAAT MIMARLIK MUHENDISLIK SANAYI IC VE DIS TICARET ANONIM SIRKETISep 30, 2025Department of State$3.89MSource
- GLOBAL URBAN ENTERPRISES, L.L.C.Sep 30, 2025Department of Veterans Affairs$25.41MSource
- K2 CONSTRUCTION CONSULTANTS, INCSep 30, 2025Department of Homeland Security$5.33MSource
- MERIDIAN ENGINEERING COSep 30, 2025Department of State$21.01MSource
- KMC SOLUTIONS, LLCSep 30, 2025Department of Veterans Affairs$20.38MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 28cf190af0914e4cb6cf3b5bec1b5bab.