Plating Shop Renovation Industry Day
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Oct 21, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Oct 21, 2025, 8:00 PM EDT
- Posted
- Nov 9, 2025
- Solicitation
- —
- Set-aside
- None listed
- Place of performance
- Layton, UT, USA
- Contracting office
- W075 ENDIST SACRAMENTO · SACRAMENTO · CA
- Source
- SAM.gov · updated May 9, 2026
Description
Project Title: Plating Shop Renovation � Hill AFB, Utah Sponsor: U.S. Air Force Executing Agency: U.S. Army Corps of Engineers, Sacramento District (SPK) Project Type: Renovation and New Construction Delivery Method: Design-Bid-Build (DBB) Contract Type: Firm-Fixed Price (FFP), Single Award Task Order Contract (SATOC) Ordering Period: 1,825 calendar days (5 years) Bonding: Required at the task order level for awarded/active work only Location: Buildings 505 & 507, Hill AFB, Utah Estimated Magnitude of Construction: $100,000,000 � $250,000,000 Purpose of Industry Day The U.S. Army Corps of Engineers, Sacramento District � Utah Satellite Office is conducting an Industry Day to provide interested Offerors with a clear understanding of the Government�s requirements and project timelines. The event will: Present upcoming project requirements and anticipated milestones. Facilitate Q&A sessions to address technical, schedule, and procurement questions. Promote networking between industry representatives and the USACE Hill Team. Provide a tour of the Plating Shop. Key USACE Staff Available: Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads, and Contracting Officers. Project Overview The Plating Shop Renovation project will modernize and expand existing facilities located in Building 505 (B505) and Building 507 (B507) at Hill AFB, Utah, ensuring continued depot-level maintenance capability for multiple aircraft platforms. The renovation addresses compliance with OSHA and environmental standards, enhances safety and ergonomics, improves energy efficiency, reduces maintenance costs, and provides a robust, modernized facility to ensure reliable aircraft part finishing in support of Air Force readiness. The project includes both the comprehensive renovation of 20,000 square feet of existing shop space and the construction of a new 2,800-square-foot Pre-Engineered Metal Building (PEMB) to accommodate expanded operations. Renovation � Building 505/507 (20,000 SF) Structural Upgrades: Reinforce basement slabs, footings, and CMU walls. Replace structural platforms, columns, and grating for plating tanks. Modify roof structure to support overhead cranes. Mechanical & Process Systems: Replace HVAC and ventilation systems for chemical processes and fume exhaust. Refurbish chemical-resistant coatings on floors, walls, and ceilings. Electrical & Controls: Upgrade panelboards, busways, circuits, instrumentation, and lighting to support automated, traceable plating operations. Fire & Life Safety: Install updated fire suppression systems, emergency eyewash/shower stations, and life safety signage. Key Plating Processes: Electroless Nickel Cadmium Plating Chrome and High Velocity Oxygen Fuel (HVOF) Strip Chrome Plating Anodize / Alodine (Type II & III) Zinc Nickel Plating Nickel Sulfamate Plating Phosphate / Temper Etch / Passivate Aluminum Conversion Coat Titanium Pickle Fluorescent Penetrant Inspection (FPI) Aqueous Degrease / Future Lines New Construction � Pre-Engineered Metal Building (PEMB) (2,800 SF) Constructed adjacent to Building 505 to accommodate ovens that extend beyond the building footprint. Design Features: Insulated steel panels, standing seam metal roof, polyisocyanurate insulation, snow guards. Basement & Platforms: Cast-in-place basement, equipment platforms, steel stairs, service utility routing. Integration: Structural opening and expansion joint between B505 and PEMB for seamless operational flow. Ordering Period & Phased Construction Approach Ordering Period: 1,825 calendar days (5 years) to accommodate phased construction, complex equipment installation, testing, and commissioning. Task Orders: Each phase executed under a separate pre-priced task order with its own Notice-To-Proceed (NTP). Phased Construction Schedule: Phase 1: Demolition: 'A' tank line (B507), ovens (B505) Installation: Type II Anodize (B507); Chrome, Type III Anodize, Phosphate/Passivate (B505) Phase 2: Demolition: Chrome, Anodize, Phosphate lines Installation: Cadmium, Zinc Nickel, Temper Etch, Nickel, Electroless Nickel Phase 3: Demolition: Cadmium, Iridate, Zinc Nickel, Temper Etch, Nickel lines Installation: Chrome Strip, FPI, Degrease, Future lines Phase 4: Demolition: Chrome and FPI lines Installation: New Chrome tank line Each task order includes labor, equipment, supervision, and materials and is issued within the 5-year ordering period. Occupancy of Premises Work occurs in active, secure facilities. Contractors must maintain security, protect Government property, provide dust enclosures, and coordinate with ongoing operations. Industry Day Details Date: Friday, November 07, 2025 Time: 0900 � 1100 MDT (Briefing); 1300 � 1430 MDT (Site Visit � Building 505) Briefing Location: USACE Utah Layton Satellite Office, 523 S. Heritage Park Blvd, Suite 1, Layton, UT 84041 Site Visit Location: Building 505, Hill Air Force Base, Utah RSVP Instructions: Submit by 1200 PDT on 22 October 2025 with: Full Name Company Name Email Address Email RSVP to: Melita S. Doyle � melita.s.doyle@usace.army.mil Amelia K. Bryant � amelia.k.bryant@usace.army.mil
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$6.60M
Middle of the pack for similar past awards
Most similar awards fall between $893,372 and $11.67M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1SAUER CONSTRUCTION, LLC1 award$37.80M
- 2SES CONSTRUCTION AND FUEL SERVICES LLC1 award$12.97M
- 3GREENLAND ENTERPRISES, INC.1 award$11.67M
- 4DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC.1 award$8.44M
- 5ADVON CORPORATION1 award$6.60M
- 6BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLC1 award$4.88M
- 7AVENTUS NV, INC.1 award$893,372
- 8TASI, LLC1 award$337,807
Recent examples
A few of the newest similar awards in our index.
- M2 ENGINEERING, LLCSep 26, 2025Department of Homeland Security$89,548Source
- GREENLAND ENTERPRISES, INC.Sep 22, 2025National Aeronautics and Space Administration$11.67MSource
- DIVERSIFIED CONSTRUCTION OF OKLAHOMA, INC.Sep 19, 2025National Aeronautics and Space Administration$8.44MSource
- SES CONSTRUCTION AND FUEL SERVICES LLCSep 8, 2025National Aeronautics and Space Administration$12.97MSource
- AVENTUS NV, INC.Aug 22, 2025Department of Agriculture$893,372Source
- BIRMINGHAM INDUSTRIAL CONSTRUCTION, LLCJul 3, 2025National Aeronautics and Space Administration$4.88MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 30a82e55c580465bb5fb6b01d3656042.