P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA
Dept of Defense · DEPT OF THE NAVY
This notice is not accepting responses (deadline was Jun 8, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 8, 2026, 8:00 PM EDT
- Posted
- Apr 28, 2026
- Solicitation
- N6945026R0005
- Set-aside
- None listed
- Place of performance
- Jacksonville, FL, USA
- Contracting office
- NAVFACSYSCOM SOUTHEAST · NAS JACKSONVILLE · FL
- Source
- SAM.gov · updated May 9, 2026
Description
This project is a Design Bid Build construction of a new facility and parking structure at NAS Jacksonville. The facility will be used to manufacture the Joint Strike Fighter (JSF) engine. The P683 project consists of a facility design for the Engine Repair Facility located at Naval Air Station (NAS), Jacksonville, Florida and will support the Fleet Readiness Center (FRC) operations. The facility is proposed as an approximately 300,000 gross-square-foot (GSF) one-story high bay engine repair facility with associated 20,000 GSF two-story support/office and administration areas and 300,000 GSF parking structure. It is a steel-framed structure with a combination of precast concrete walls and metal panel system, a modified bitumen roof, and shallow bearing foundation system. The engine repair facility will include operational areas, maintenance spaces, storage and support spaces and administrative areas. It will also include a Loading Area Weather Protection zone along the southern side of the facility. Builtin equipment includes 29 double-girder bridge dual hoist cranes (eleven 4.5-ton and eighteen 2-ton), crane rails, automated vertical storage system, and passenger elevator. This project will also include two surface parking lots, including a 1.34-acre temporary gravel parking lot (150 parking spaces) and 3.24-acre asphalt paved parking lot (288 spaces), and intersection improvements at Ranger and Birmingham. There are two existing administration buildings each approximately 19,000 SF as well as a covered walkway that are scheduled to be demolished as part of this project. Occupants displaced from this demolition will be relocated to the administration extension on the engine repair facility.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$542,087
Middle of the pack for similar past awards
Most similar awards fall between $160,292 and $2.86M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1HENSEL PHELPS CONSTRUCTION CO4 awards$1.20B
- 2WHITING-TURNER CONTRACTING COMPANY, THE14 awards$640.05M
- 3RQ-AECOM 2 JV3 awards$257.13M
- 4TUTOR PERINI CORPORATION3 awards$143.43M
- 5GRUNLEY CONSTRUCTION CO., INC.1 award$114.38M
- 6GILBANE FEDERAL3 awards$102.25M
- 7TEPA EC, LLC2 awards$95.47M
- 8CHEROKEE CRC LLC3 awards$94.26M
Recent examples
A few of the newest similar awards in our index.
- ETOLIN STRAIT ASSOCIATES LLCSep 30, 2025Department of Justice$150,617Source
- ETOLIN STRAIT ASSOCIATES LLCSep 30, 2025Department of Justice$553,536Source
- ETOLIN STRAIT ASSOCIATES LLCSep 30, 2025Department of Justice$414,425Source
- ETOLIN STRAIT ASSOCIATES LLCSep 30, 2025Department of Justice$33,974Source
- ETOLIN STRAIT ASSOCIATES LLCSep 30, 2025Department of Justice$207,799Source
- VANGUARD PACIFIC LLCSep 30, 2025Department of Health and Human Services$1.15MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 339a02d54d1c4571a329becc9f4eba77.