Construction of a Spur Jetty at Camp Ellis Beach in Saco, Maine
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Nov 17, 2025, 7:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Nov 17, 2025, 7:00 PM EST
- Posted
- Oct 28, 2025
- Solicitation
- W912WJ26BA004
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- W2SD ENDIST NEW ENGLAND · CONCORD · MA
- Source
- SAM.gov · updated May 9, 2026
Description
The U.S. Army Corps of Engineers, New England District is issuing an Invitation for Bids for construction of a spur jetty that will be tied into the existing North Jetty located at the mouth of the Saco River at Camp Ellis Beach in the City of Saco, Maine. The NAICS code for this procurement is 237990 with a size standard of $45M. The estimated construction cost is between $10,000,000 and $25,000,000.The existing North Jetty at Camp Ellis Beach is an interlocked stone structure located at the entrance to the Saco River. Originally constructed in 1872, the structure has been lengthened and repaired numerous times over the years. The existing North Jetty is approximately 6,600 feet in length and constructed to a height of 15 feet MLW with an 8-ft crown width. Side slopes are 1H:1V. The proposed jetty spur will extend from the existing North Jetty into Saco Bay.The proposed work consists of constructing a 750-ft long spur jetty extending from the North Jetty into the Saco Bay at a location approximately 1500? from shore. As part of the spur jetty construction, the Contractor will reinforce an approximately 100-ft length of the North Jetty. The work includes mobilization and demobilization, the furnishment and delivery of stones, removal/rehandling/resetting of existing stones, and placement of new bedding, underlayer and armor stone for tie-in between the new and the existing structure. Anticipated stone required to construct the spur jetty and reinforce the existing north jetty includes approximately 9,500 square yards of 2-ft thick, stone-filled marine mattress; 13,000 tons of underlayer stone; and 38,000 tons of 8-12 ton armor stone (36,000 tons for the spur and 2,000 for the existing jetty reinforcement.) The reinforcement work will require substantial moving and rehandling of existing stones to obtain the required interlocking placement and construction tolerances. Construction, stone delivery, and access will be by water. Access to the breakwater by land is unavailable and no work should be completed from the crest of the breakwater. Environmental coordination and permitting is being completed by the U.S. Army of Engineers, New England District. Low tide water depths in the vicinity of the structure are approximately 10 feet, and the average tidal range is approximately 9 feet. The area is located 1500? off the shoreline and subject to wave action. No spudding or anchoring into the existing structure is permitted.Please note that this solicitation is unrestricted. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to download the solicitation offerors must access the System of Award website (www.sam.gov). In order to download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at brian.t.mannion@usace.army.mil
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$3.92M
Middle of the pack for similar past awards
Most similar awards fall between $614,890 and $16.18M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1TECH2 SOLUTIONS11 awards$180.54M
- 2APOGEE GROUP, LLC7 awards$170.82M
- 3GARCO CONSTRUCTION, INC.2 awards$143.39M
- 4MGC SERVICES A JOINT VENTURE LLC1 award$49.89M
- 5COASTAL CONSTRUCTION GROUP, LLC1 award$43.49M
- 6VETERAN DESIGN & CONSTRUCTION INC1 award$35.03M
- 7ODIN ENVIRONMENTAL SOLUTIONS, LLC1 award$34.80M
- 8ADVANCED AMERICAN CONSTRUCTION, INC.1 award$29.43M
Recent examples
A few of the newest similar awards in our index.
- KIEWIT INFRASTRUCTURE SOUTH COSep 30, 2025Department of State$16.60MSource
- KMC SOLUTIONS, LLCSep 30, 2025Department of Veterans Affairs$20.38MSource
- MERIDIAN ENGINEERING COSep 30, 2025Department of State$21.01MSource
- ALPINE CONSTRUCTION MANAGEMENT LLCSep 29, 2025Department of Veterans Affairs$5.75MSource
- TECH2 SOLUTIONSSep 29, 2025Department of Energy$33.24MSource
- APOGEE GROUP, LLCSep 29, 2025Department of Energy$87.82MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 3487113e345a44fd95765cf6169bfad0.