OpenSources Sought19 days left
Dept of Defense contract category

Winfield Roller Gate RFI

Dept of Defense · DEPT OF THE ARMY

Response deadline
Aug 3, 2026, 11:00 AM EDT
Posted
Jul 13, 2026
Solicitation
W91237-26-Q1C5L
Set-aside
No Set aside used
Place of performance
Red House, WV, USA
Contracting office
W072 ENDIST HUNTINGTON · HUNTINGTON · WV
Source
SAM.gov · updated Jul 13, 2026

Description

This Request For Information Notice is intended to garner industry input for questions regarding Roller Gate Fabrication for the Winfiled Lock and Dam Located in Red House, West Virgina. Interested Contractors are encouraged to reply to the following questions after reviewing the Attached Technical Drawings: 1. Can the skin plate splices be performed using submerged arc welding? 2. Economies of scale: Are there significant efficiencies related to fabrication of 1 gate v 2 gates v 3 gates, etc. 3. Not grinding skin plate welds�What is the time and labor savings? Would not staggering skin plate splices increase efficiency/benefit fabrication? Note that splice welds would still be required to be ground flush at the intersections of longitudinal and transverse splice welds a minimum of 4� in all directions. 4. What factors do you consider when doing 100% RT on this quantity of welds? Shutting down shop? How is this cost factored in? What is the production rate? Cost per test? 5. Would a design featuring multiple pieces (2-4) with transverse gate splice(s) benefit fabrication? Would you prefer this splice be welded or bolted using slip critical bolted connection. Note that full assembly would be required at the shop prior to shipment for a full shop fit assembly. 6. Would a design featuring bolted on end shields and/or apron benefit fabrication/increase efficiency? 7. Would you be more or less likely to bid if this was a Construction Contractor (i.e. working with a prime contractor to install) vs a supply fabrication contract. 8. What can USACE do to reduce risk/contingency in bidding a project like this? 9. Are there connections that would be more cost efficient bolted instead of welded? Would it be more cost efficient to weld, or use slip critical bolts to connect splices on the skin plate(longitudinal and transverse)? 10. Are there a fabrication cost difference between bearing type and slip-critical bolted connections. 11. If final assembly of the gates is allowed in the field during installation, is this something that would be a benefit for fabrication/increase efficiency?

What similar awards have paid

Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.

Typical award size

$58,251

Middle of the pack for similar past awards

Most similar awards fall between $23,704 and $173,005

Lower end$23,704Typical$58,251Higher end$173,005
Based on 75 similar awardsSame industry code (332312)Prime contracts (not umbrella IDVs)

Who has won work like this

Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.

Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.

Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 3633088476034fb6bf33e03b2c9506b4.

Related open government contracts

More in 332312 →
Federal vendorsMore from Dept of DefenseNAICS 332312PSC 9640West Virginia contracts