Maintenance Dredging, Kennebec River, Kennebec Maine
Dept of Defense · DEPT OF THE ARMY
- Response deadline
- Jul 27, 2026, 8:00 PM EDT
- Posted
- Jun 29, 2026
- Solicitation
- W912WJ26BA015
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- W2SD ENDIST NEW ENGLAND · CONCORD · MA
- Source
- SAM.gov · updated Jun 30, 2026
Description
Maintenance Dredging, Kennebec River, Kennebec Maine. The work involves maintenance dredging for the USN of three portions of the authorized, 27-foot deep, 500-foot wide FNP in the Lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works (BIW). The proposed work consists of dredging approximately 80,000 cubic yards (cy) of clean sand (approximately 30,000 cy of required material and 50,000 cy of overdepth (OD) material). Approximately 61,000 cy of material will be removed from the Doubling Point area (i.e., just below Bath), and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). In addition to the historically dredged sites, this proposed maintenance dredging includes dredging approximately 9,000 cy of material will be removed from Bath Reach (just below the Carlton Bridge and adjacent to BIW). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to an elevation of -32 feet MLLW +2 feet overdepth (OD) to improve the chance that adequate depths will endure. The 61,000 cy to be removed from the channel at Doubling Point includes dredging to an elevation of -32 feet MLLW +2 feet OD. Material dredged from the Bath Reach area and the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 45-90 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site called Jackknife Ledge West Disposal Site, in about 45-30 feet of water. This site is just northwest of the previously used Jackknife Ledge placement site. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2026 to 15 February 2027.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$231,133
Middle of the pack for similar past awards
Most similar awards fall between $73,523 and $3.92M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1INTERSTATE ROCK PRODUCTS, INC.1 award$21.94M
- 2C & C CONTRACTORS LLC1 award$8.06M
- 3BCSS, LLC1 award$7.65M
- 4WONDRA CONSTRUCTION INC1 award$6.43M
- 5G.M. HILL ENGINEERING, INC.1 award$5.74M
- 6REHBEIN ENTERPRISES INC1 award$5.21M
- 7FEDVET CONSTRUCTION1 award$4.80M
- 8NORTH WIND GENERAL CONTRACTORS LLC2 awards$4.73M
Recent examples
A few of the newest similar awards in our index.
- C & C CONTRACTORS LLCSep 30, 2025Department of Veterans Affairs$8.06MSource
- G.M. HILL ENGINEERING, INC.Sep 24, 2025Department of the Interior$5.74MSource
- FORGED CONSTRUCTION INC.Sep 24, 2025Department of Agriculture$311,695Source
- MANN ROBINSON & SON INCSep 24, 2025Department of Agriculture$985,361Source
- WONDRA CONSTRUCTION INCSep 23, 2025Department of Agriculture$6.43MSource
- BAYSIDE-ERRG JVSep 22, 2025Department of the Interior$461,214Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 448aff8b481346e6b9cbfe5e5cb0fc20.