Rosebud Lift Station Construction
Health and Human Services, Department of · INDIAN HEALTH SERVICE
This notice is not accepting responses (deadline was Mar 1, 2026, 7:00 PM EST).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Mar 1, 2026, 7:00 PM EST
- Posted
- Feb 17, 2026
- Solicitation
- 75H70126R00018
- Set-aside
- ISBEE
- Place of performance
- Rosebud, SD, USA
- Contracting office
- DIV OF ENGINEERING SVCS - SEATTLE · SEATTLE · WA
- Source
- SAM.gov · updated May 9, 2026
Description
Amendment 3: 1. The purpose of this solicitation amendment A03 is to: a. Post the conformed version of the RFP changing the following: - Replace the original �B01 RFP RLSC 75H70126R00018� with �B01-A03 Conformed RFP RLSC 75H70126R00018�. Changes are highlighted. - Amend block 11 of the SF-1442 changing the POP to 240 days. - Amend Section C, paragraph C to read 240 days. - Amend Section C to add paragraph I Notes on the Vaughan Model V3V/V3VR brand name or equal requirement. - Amend paragraph F.2(a) to read 240 calendar days. b. Add attachment J02a RB Geotech Report from 300 feet away. c. Replace attachment �J01 Plans RLSC 30Jan2026� with �J01 Plans RLSC 13Feb2026� fixing the coversheet. d. Add attachment �J02b Consolidated Q&A RLSC� posting the questions and answers (Q&As) received as of this date. - Refer to question # 13 for an update on the Base Course Thickness: 12-inches of base course underneath the concrete pad is sufficient. 2. Remember to acknowledge all amendments with your offer. 3. All other terms and conditions remain unchanged. Amendment 2: Adds the provision 52.228-1 in full text. Added MB01-A02 Bid Bond RLSC 75H70126R00018 to the attachments. Remember to acknowledge this and all future amendments with your proposal. Amendment 1: Replace an attachment. Attachment J01 Plans RLSC was corrupted and is replaced by attachment J01 Plans RLSC 30Jan2026. All questions or concerns shall be routed through daniel.cotto@ihs.gov; do not attempt to contact people mentioned in the attachment. Remember to acknowledge this and all future amendments with your proposal. Solicitation: Rosebud LiftStation Construction Location: 1319 Soldier Creek Road,Rosebud, SD 57570 County: Todd POP: 120 calendar days Construction Magnitude: Between$500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See SectionH.50. Goal: The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow. A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration. This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$10,950
Middle of the pack for similar past awards
Most similar awards fall between $8,922 and $25,000
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1PCL CONSTRUCTION INC1 award$60.05M
- 2BOYER COMMERCIAL CONSTRUCTION INC1 award$11.74M
- 3BAIRCO CONSTRUCTION INC1 award$9.89M
- 4RENOVA ENVIRONMENTAL COMPANY1 award$9.33M
- 5EPIK-AQUASHINE JV LLC4 awards$5.09M
- 6GREEN TECH-ACCU JV LLC3 awards$3.46M
- 7MIG GOV, LLC1 award$2.64M
- 8WHITE BEAR CONSTRUCTION, INC.1 award$1.72M
Recent examples
A few of the newest similar awards in our index.
- PCL CONSTRUCTION INCSep 30, 2025Department of State$60.05MSource
- BLACK FLAG SOLUTIONS LLCSep 29, 2025Department of Veterans Affairs$733,411Source
- BOYER COMMERCIAL CONSTRUCTION INCSep 29, 2025Department of Veterans Affairs$11.74MSource
- EPIK-AQUASHINE JV LLCSep 29, 2025Department of State$48,000Source
- GREEN TECH-ACCU JV LLCSep 28, 2025Department of State$1.85MSource
- OK2 CONSTRUCTION, LLCSep 26, 2025Department of the Interior$1.40MSource
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 58a8e2fce13841d5b5bb8802e71c9532.