BOWLING CENTER AND F&B UPGRADES
Dept of Defense · DEPT OF THE NAVY
This notice is not accepting responses (deadline was Jun 15, 2026, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Jun 15, 2026, 8:00 PM EDT
- Posted
- Jun 10, 2026
- Solicitation
- NAVMWR-26-R-0038
- Set-aside
- No Set aside used
- Place of performance
- El Centro, CA, USA
- Contracting office
- COMMANDER NAVY INSTALLATIONS CMD · MILLINGTON · TN
- Source
- SAM.gov · updated Jun 11, 2026
Description
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility �pot holing�) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer�s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$416,685
Middle of the pack for similar past awards
Most similar awards fall between $119,785 and $1.44M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1CONSIGLI CONSTRUCTION CO., INC.1 award$55.92M
- 2TUTOR PERINI CORPORATION1 award$49.16M
- 3LEAD BUILDERS INC5 awards$33.52M
- 4TEYA ENTERPRISES LLC2 awards$28.33M
- 5FIRELAKE CONSTRUCTION INC21 awards$24.80M
- 6AMG & ASSOCIATES INC1 award$23.64M
- 7TURNER STRATEGIC TECHNOLOGIES, LLC7 awards$22.12M
- 8GOLDBELT OPERATIONS SUPPORT SERVICES, LLC5 awards$20.47M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 657552cd29694da0b7920d68ea87a130.