Holt Lock Monolith R14 Restoration
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was May 27, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- May 27, 2025, 8:00 PM EDT
- Posted
- Apr 23, 2025
- Solicitation
- W9127825RA015
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- W074 ENDIST MOBILE · MOBILE · AL
- Source
- SAM.gov · updated May 9, 2026
Description
The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$7.16M
Middle of the pack for similar past awards
Most similar awards fall between $6.39M and $16.39M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1KOMADA LLC1 award$66.36M
- 2WCA CONSTRUCTION, LLC1 award$16.39M
- 3CLASSIC SITE SOLUTIONS INC1 award$7.16M
- 4MCMILLEN, INC.1 award$6.39M
- 5RF CONSTRUCTION LLC1 award$58,415
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 76e7b5a6edcc48cabb73e055881f5253.