Plating Shop Renovation Industry Day
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Oct 21, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Oct 21, 2025, 8:00 PM EDT
- Posted
- Jan 20, 2026
- Solicitation
- —
- Set-aside
- None listed
- Place of performance
- Layton, UT, USA
- Contracting office
- W075 ENDIST SACRAMENTO · SACRAMENTO · CA
- Source
- SAM.gov · updated May 9, 2026
Description
Project Title: Plating Shop Renovation � Hill AFB, Utah Sponsor: U.S. Air Force Executing Agency: U.S. Army Corps of Engineers, Sacramento District (SPK) Project Type: Renovation and New Construction Delivery Method: Design-Bid-Build (DBB) Contract Type: Firm-Fixed Price (FFP), Single Award Task Order Contract (SATOC) Ordering Period: 1,825 calendar days (5 years) Bonding: Required at the task order level for awarded/active work only Location: Buildings 505 & 507, Hill AFB, Utah Estimated Magnitude of Construction: $100,000,000 � $250,000,000 Purpose of Industry Day The U.S. Army Corps of Engineers, Sacramento District � Utah Satellite Office is conducting an Industry Day to provide interested Offerors with a clear understanding of the Government�s requirements and project timelines. The event will: Present upcoming project requirements and anticipated milestones. Facilitate Q&A sessions to address technical, schedule, and procurement questions. Promote networking between industry representatives and the USACE Hill Team. Provide a tour of the Plating Shop. Key USACE Staff Available: Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads, and Contracting Officers. Project Overview The Plating Shop Renovation project will modernize and expand existing facilities located in Building 505 (B505) and Building 507 (B507) at Hill AFB, Utah, ensuring continued depot-level maintenance capability for multiple aircraft platforms. The renovation addresses compliance with OSHA and environmental standards, enhances safety and ergonomics, improves energy efficiency, reduces maintenance costs, and provides a robust, modernized facility to ensure reliable aircraft part finishing in support of Air Force readiness. The project includes both the comprehensive renovation of 20,000 square feet of existing shop space and the construction of a new 2,800-square-foot Pre-Engineered Metal Building (PEMB) to accommodate expanded operations. Renovation � Building 505/507 (20,000 SF) Structural Upgrades: Reinforce basement slabs, footings, and CMU walls. Replace structural platforms, columns, and grating for plating tanks. Modify roof structure to support overhead cranes. Mechanical & Process Systems: Replace HVAC and ventilation systems for chemical processes and fume exhaust. Refurbish chemical-resistant coatings on floors, walls, and ceilings. Electrical & Controls: Upgrade panelboards, busways, circuits, instrumentation, and lighting to support automated, traceable plating operations. Fire & Life Safety: Install updated fire suppression systems, emergency eyewash/shower stations, and life safety signage. Key Plating Processes: Electroless Nickel Cadmium Plating Chrome and High Velocity Oxygen Fuel (HVOF) Strip Chrome Plating Anodize / Alodine (Type II & III) Zinc Nickel Plating Nickel Sulfamate Plating Phosphate / Temper Etch / Passivate Aluminum Conversion Coat Titanium Pickle Fluorescent Penetrant Inspection (FPI) Aqueous Degrease / Future Lines New Construction � Pre-Engineered Metal Building (PEMB) (2,800 SF) Constructed adjacent to Building 505 to accommodate ovens that extend beyond the building footprint. Design Features: Insulated steel panels, standing seam metal roof, polyisocyanurate insulation, snow guards. Basement & Platforms: Cast-in-place basement, equipment platforms, steel stairs, service utility routing. Integration: Structural opening and expansion joint between B505 and PEMB for seamless operational flow. Ordering Period & Phased Construction Approach Ordering Period: 1,825 calendar days (5 years) to accommodate phased construction, complex equipment installation, testing, and commissioning. Task Orders: Each phase executed under a separate pre-priced task order with its own Notice-To-Proceed (NTP). Phased Construction Schedule: Phase 1: Demolition: 'A' tank line (B507), ovens (B505) Installation: Type II Anodize (B507); Chrome, Type III Anodize, Phosphate/Passivate (B505) Phase 2: Demolition: Chrome, Anodize, Phosphate lines Installation: Cadmium, Zinc Nickel, Temper Etch, Nickel, Electroless Nickel Phase 3: Demolition: Cadmium, Iridate, Zinc Nickel, Temper Etch, Nickel lines Installation: Chrome Strip, FPI, Degrease, Future lines Phase 4: Demolition: Chrome and FPI lines Installation: New Chrome tank line Each task order includes labor, equipment, supervision, and materials and is issued within the 5-year ordering period. Occupancy of Premises Work occurs in active, secure facilities. Contractors must maintain security, protect Government property, provide dust enclosures, and coordinate with ongoing operations. Industry Day Details Date: Friday, November 07, 2025 Time: 0900 � 1100 MDT (Briefing); 1300 � 1430 MDT (Site Visit � Building 505) Briefing Location: USACE Utah Layton Satellite Office, 523 S. Heritage Park Blvd, Suite 1, Layton, UT 84041 Site Visit Location: Building 505, Hill Air Force Base, Utah RSVP Instructions: Submit by 1200 PDT on 22 October 2025 with: Full Name Company Name Email Address Email RSVP to: Melita S. Doyle � melita.s.doyle@usace.army.mil Amelia K. Bryant � amelia.k.bryant@usace.army.mil
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$324,072
Middle of the pack for similar past awards
Most similar awards fall between $113,041 and $940,807
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1GRUNLEY CONSTRUCTION CO., INC.1 award$82.31M
- 2THE RIFF GROUP, LLC13 awards$14.35M
- 3LORENZON CONSTRUCTION, INC.7 awards$13.39M
- 4MORELLO CONSTRUCTION LLC1 award$9.96M
- 5KUNJ CONSTRUCTION CORPORATION3 awards$7.34M
- 6FIRELAKE CONSTRUCTION INC1 award$6.47M
- 7COVENANT CONSTRUCTION SERVICES LLC1 award$5.34M
- 8DH ORTEGA CONSTRUCTION LLC1 award$4.22M
Recent examples
A few of the newest similar awards in our index.
- CORENIC CONSTRUCTION GROUP LLCSep 30, 2025Department of Commerce$219,817Source
- SPR CONSTRUCTION CORPSep 30, 2025Department of the Treasury$195,072Source
- CCI PRIME CONTRACTORS, LLCSep 29, 2025Department of Justice$389,921Source
- MIDLANDS MECHANICAL, INCSep 29, 2025Department of the Treasury$951,599Source
- RITZ CONSTRUCTION INCSep 26, 2025Department of the Interior$51,387Source
- CORENIC CONSTRUCTION GROUP LLCSep 22, 2025Department of Commerce$71,669Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 76fba140e1a444a293d6d2add8a424fe.