Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Apr 21, 2026, 11:00 AM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Apr 21, 2026, 11:00 AM EDT
- Posted
- Apr 10, 2026
- Solicitation
- W912EQ26RA001
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- W07V ENDIST MEMPHIS · MEMPHIS · TN
- Source
- SAM.gov · updated Jul 5, 2026
Description
Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work. The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government. Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process. Magnitude of Construction: Between $25,000,000 and $100,000,000.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$3.65M
Middle of the pack for similar past awards
Most similar awards fall between $605,348 and $15.68M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1TECH2 SOLUTIONS11 awards$180.54M
- 2APOGEE GROUP, LLC7 awards$170.82M
- 3GARCO CONSTRUCTION, INC.2 awards$143.39M
- 4MGC SERVICES A JOINT VENTURE LLC1 award$49.89M
- 5COASTAL CONSTRUCTION GROUP, LLC1 award$43.49M
- 6VETERAN DESIGN & CONSTRUCTION INC1 award$35.03M
- 7ODIN ENVIRONMENTAL SOLUTIONS, LLC1 award$34.80M
- 8ADVANCED AMERICAN CONSTRUCTION, INC.1 award$29.43M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 88d84c7d62474ae489102de39d6753cb.