Upper Baker Installing Trailer Pads and Utilities
Agriculture, Department of · FOREST SERVICE
- Response deadline
- Aug 9, 2026, 8:00 PM EDT
- Posted
- Jul 6, 2026
- Solicitation
- 1240LT26Q0126
- Set-aside
- Total Small Business
- Place of performance
- Monticello, UT, USA
- Contracting office
- Manti-Lasal National Forest · PRICE · UT
- Source
- SAM.gov · updated Jul 7, 2026
Description
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities � Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2� poly line. New water line will be a 2� HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer � The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6� with trailer connections being 6� to 3� Wye�s. Drainage must remain between 1/8� � �� per ft across the entirety of the line. Must meet state code. Electrical � A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items � Trenching and Backfilling � Trenching will need to be 36� deep to meet frost line requirements. Crushed Aggregate � Grade G Road Base for the trailer pads and roadway
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$24,938
Middle of the pack for similar past awards
Most similar awards fall between $10,308 and $116,726
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1CDM CONSTRUCTORS INC1 award$357.53M
- 2JACOBS PROJECT MANAGEMENT CO.1 award$262.56M
- 3STRONGHOLD ENGINEERING INC1 award$215.30M
- 4S.J. LOUIS CONSTRUCTION, INC2 awards$151.42M
- 5APTIM-NORTH WIND CONSTRUCTION JV LLC1 award$142.02M
- 6OSCAR RENDA CONTRACTING INC1 award$131.86M
- 7ARCHER WESTERN CONSTRUCTION, LLC2 awards$124.07M
- 8PCL CONSTRUCTION INC1 award$60.05M
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 951967d44bd44757925a825597357cf3.