Keweenaw Upper Breakwater Repairs
Dept of Defense · DEPT OF THE ARMY
This notice is not accepting responses (deadline was Aug 6, 2025, 8:00 PM EDT).
Page kept for research and related open opportunities below. For current work in this category, use the related notices or browse hubs.
- Response deadline
- Aug 6, 2025, 8:00 PM EDT
- Posted
- Aug 10, 2025
- Solicitation
- W911XK25BA026
- Set-aside
- None listed
- Place of performance
- —
- Contracting office
- W072 ENDIST DETROIT · DETROIT · MI
- Source
- SAM.gov · updated May 9, 2026
Description
***Posting of the Bid Abstract**** Amendment 0001 is issued to update Wage Determination MI20250045. The bid suspense date remains the same on August 7, 2025 at 2:00 PM (Eastern). Reference the amendment document for full details. ****This Invitation for Bid (IFB) is being solicited as unrestricted. The United States Army Corps of Engineers (USACE) owns and maintains the West Breakwater in the Keweenaw Waterway (Upper) Entry near Houghton, Michigan. The breakwater is approximately 2,645 feet long and consists of timber crib and rubble mound construction. The inner 845 feet is a timber crib with concrete cap covered in armor stone. The remaining 1,800 feet of the breakwater is rock filled timber crib covered in armor stone. The breakwater was constructed as part of several projects that began in 1898 with the outer 1,800 feet finished in 1933. Rehabilitation projects have also been completed on the breakwater with the last occurring in the early 2000s. Non-native stamp sand is currently migrating through and/or over the breakwater into the Federally Authorized Channel which is increasing the frequency and costs related to keeping the channel at its authorized depth. The breakwater will be modified by increasing the height and providing filter material to prevent passage of stamp sand material through and/or over the breakwater into the channel. Improvements will be completed from STA 0+30 to STA 4+00 with optional improvements from STA 4+00 to STA 4+50. The work includes the excavation, hauling, and disposal of stamp sand within the specified confined disposal facility, the excavation and rework of existing armor stone, and supply and placement of bedding stone (D-Stone), core stone (C-Stone), and armor stone (A-Stone), and incidental related work.
What similar awards have paid
Real federal awards already on the books in a similar lane — so you can size the opportunity, not guess. This is public history, not a bid price, cost estimate, or prediction that you will win.
Typical award size
$676,728
Middle of the pack for similar past awards
Most similar awards fall between $145,874 and $11.58M
Who has won work like this
Public awardees in this lane — useful for competitor scan or teaming ideas, not a ranked list of “best” firms.
- 1GARCO CONSTRUCTION, INC.2 awards$143.39M
- 2COASTAL CONSTRUCTION GROUP, LLC1 award$43.49M
- 3ADVANCED AMERICAN CONSTRUCTION, INC.1 award$29.43M
- 4BIS SERVICES LLC1 award$17.43M
- 5PIPKIN INC.1 award$16.79M
- 6BCSS, LLC1 award$16.05M
- 7SNC TALLIMAT, LLC1 award$13.17M
- 8DIVERSIFIED CONTRACTORS, INC.1 award$11.68M
Recent examples
A few of the newest similar awards in our index.
- ADVANCED LOGISTIC PARTNERS INCSep 25, 2025Department of the Interior$31,800Source
- COASTAL CONSTRUCTION GROUP, LLCSep 25, 2025Department of the Interior$43.49MSource
- EASY STREET GRAVEL ROAD REPAIR LLCSep 19, 2025Department of Agriculture$664,676Source
- ADVANCED LOGISTIC PARTNERS INCSep 19, 2025Department of Commerce$165,700Source
- GARCO CONSTRUCTION, INC.Sep 18, 2025Department of the Interior$58.78MSource
- GEOVERT LLCSep 17, 2025Department of the Interior$676,728Source
Drawn from official USAspending contract records in our index. Always confirm requirements on the SAM.gov notice before you bid.
Intelligence only — not legal advice or a guarantee of award. Always verify requirements on the official SAM.gov notice. Past award amounts are public history, not a suggested bid or prediction. Notice ID 98fa0dd7710c46c7bdcefdb3b4c7f4f3.